Public Works Department Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Public Works Department - PWD Tender

Civil And Construction
Road Construction
Opening Date9 Aug 2024
Closing Date19 Aug 2024
Tender Amount₹ 99,24,614.1 
Notes
Download

Costs

Summary

Annual Mdr Maintainance To 1)karatagi-basavanna Camp Pannapur, 2)karatagi-hanaval Via Challur, Hagedal, Singanal, 3) Sh-29 Sulekal Road Nandihalli Via Benakanal, Kalkera, Gundur, Siddapur, Ulenur, 4) Rg Road To Baragur Marali Via Mushtur, 5) Siddapur-jamapur, 6) Karatagi-budagumpa, 7) Marlanhalli-siddapur Via Yaradona, 8) Kampli Road To Ayodhya Danapur Via Rg Road To Join In Karatagi Tq Koppal Dist.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Page No. 75, SI No. 10.1 of 2023-24 CSR Volume-3 - Restoration of Rain Cuts Restoration of rain cuts with soil, moorum, gravel or a mixture of these, clearing the loose soil, benching for 300 mm width, laying fresh material in layers not exceeding 250 mm and compacting with plate compactor or power rammers to restore the original alignment, levels and slopes (Page No. 75, SI No. 10.1 of 2023-24 CSR Volume-3 ---- Including cost of all materials, labour, HOM, I

51.72

232

12047.1396

... More
Page No. 75, SI No. 10.3 of 2023-24 CSR Volume-3 - Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (Page No. 75, SI No. 10.3 of 2023-24 CSR Volume-3 ---- Including cost of all materials, labour, HOM, I

10780

48

520889.6

... More
Page No. 8, SI No.1.14.1) of 2023-24 CSR Volume-1 - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (Page No. 8, SI No.1.14.1) of 2023-24 CSR Volume-1 ---- Including cost of all materials, labour, HOM, I

50.4

126

6369.552

... More
Page No. 15, SI No. 2.1.3) of 2023-24CSR Volume-1 - Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (Page No. 15, SI No. 2.1.3) of 2023-24CSR Volume-1 ---- Including cost of all materials, labour, HOM, I

3.36

7420

24932.4432

... More
Page No. 16, SI No. 2.5.1 of 2023-24 CSR Volume-3 - Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Page No. 16, SI No. 2.5.1 of 2023-24 CSR Volume-3 ---- Including cost of all materials, labour, HOM, I

14.34

8214

117796.9338

... More
Page No. 111, SI No. 8) of 2023-24 - Centering for Culverts (Head walls) (Page No. 111, SI No. 8) of 2023-24 CSR Volume-1 Add 8 Addendum I Additionalities for Form work of Percentage on finished rate on basic rate of concrete per m3percent ---- Including cost of all materials, labour, HOM, I

14.34

657

9423.8178

... More
Page No. 18, SI No. 2.22.h) of 2023-24 CSR Vol3 - Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (Page No. 18, SI No. 2.22.h) of 2023-24 CSR Volume-3 ---- Including cost of all materials, labour, HOM, I

0.87

97894

85168.3281

... More
Page No. 146, SI No. 16.16 A) of 2023-24 CSR Vol3 - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per Design in Double RowProviding and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1101.6 1200 mm dia (Page No. 146, SI No. 16.16 A) of 2023-24 CSR Volume-3 ---- Including cost of all materials, labour, HOM, I

40

20966

838654.4

... More
Page No. 17, SI No. 3.6) of 2023-24 CSR Vol3 - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet equirement of table No. 300-2 (Page No. 17, SI No. 3.6) of 2023-24 CSR Volume-3 ---- Including cost of all materials, labour, HOM, I

42.4

610

25899.192



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.