Public Works Department Tender
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.
Costs
EMD
₹ 25,000Document Cost
Refer DocumentsTender Fee
₹ 620
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
PWD/2024-25/BD/WORK_INDENT16147Tender No
PWD/2024-25/BD/WORK_INDENT16147Tender Authority
Public Works Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Others - green board quotation rate.pdf
Others - electrical tech specifications.pdF
Others - electrical works specification.doC
Others - royalty statement.docx
BOQ Items
VOL II Page No. 9 Item No.5.4 - Providing Size stone masonry with hard stone in foundation and plinth with cement morter 1:6 (1 cement : 6 coarse sand) (SR VOL II 2023-24, Page No. 9 Item No.5.4) ---- including cost of all materials, labor ,HOM,l
14.04
6708
94186.638
VOL I 2023-24, Page No. 15 Item No.2.2.3 - Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (SR VOL I 2023-24, Page No. 15 Item No.2.2.3) ---- including cost of all materials, labor ,HOM,l
20.8
6652
138378.24
VOL I Page No. 111 Item No. Addendum I - KSRB 4-6.5 : Providing Percentage Additionalities for Formwork, Centering & Scaffolding for Foundation upto Plinth isolated footing 8% (VOL I Page No. 111 Item No. Addendum I) ---- including cost of all materials, labor ,HOM,l
12.29
532
6540.9838
VOL I 20 Page No. 111 Item No. Addendum - KSRB 4-6.5 : Providing Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Columns / Shaft (Slip Centering) 70% (SR VOL I 2023-24, Page No. 111Item No. Addendum I) Shuttering For Column ---- including cost of all materials, labor ,HOM,l
2.81
4656
13086.0576
SR VOL I 2023-24, Page No. 111 Item No. Addendum I - KSRB 4-6.5 : Providing Percentage Additionalities for Formwork, Centering & Scaffolding for Plinth Beams of Buildings 50% (SR VOL I 2023-24, Page No. 111 Item No. Addendum I) ---- including cost of all materials, labor ,HOM,l
5.7
3326
18960.48
VOL I 2023-24, Page No. 16 Item No.2.5.2 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (SR VOL I 2023-24, Page No. 16 Item No.2.5.2) ---- including cost of all materials, labor ,HOM,l
30.24
7185
217278.936
VOL I 2023-24, Page No. 111 Item No. Addendum - KSRB 4-6.5 : Providing Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Columns / Shaft (Slip Centering) 70% (SR VOL I 2023-24, Page No. 111 Item No. Addendum I) Shuttering For Column ---- including cost of all materials, labor ,HOM,l
6
5029
30177.66
VOL I 2023-24, Page No. 112 Item No. Addendum - KSRB 4-6.5 : Providing Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Beams, Lintels & Troughs of Aqueducts 60% (SR VOL I 2023-24, Page No. 112 Item No. Addendum I) Shuttering For Lintels and Beams ---- including cost of all materials, labor ,HOM,l
6.86
4311
29574.0774
VOL I Page No. 112 Item No. Addendum I - KSRB 4-6.5 : Providing Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Roof Slabs 50% (SR VOL I 2023-24, Page No. 112 Item No. Addendum I) Shuttering For Roof slab ---- including cost of all materials, labor ,HOM,l
17.38
3592
62439.0404
VOL II 2023-24, Page No. 5 Item No.4.1 - Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. (SR VOL II 2023-24, Page No. 5 Item No.4.1) ---- including cost of all materials, labor ,HOM,l
115.88
123
14357.532
VOL I 2023-24, Page No. 7 Item No.1.9 - Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (SR VOL I 2023-24, Page No. 7 Item No.1.9) ---- including cost of all materials, labor ,HOM,l
114.47
279
31971.471
VOL II 2023-24, Page No. 14 Item No.6.8 - Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (SR VOL II 2023-24, Page No. 14 Item No.6.8) ---- including cost of all materials, labor ,HOM,l
35.36
8367
295873.032
VOL I 2023-24, Page No. 16 Item No.2.5.1 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (SR VOL I 2023-24, Page No. 16 Item No.2.5.1) ---- including cost of all materials, labor ,HOM,l
2.9
6961
20188.35
VOL I 2023-24, Page No. 112 Item No. Addendum I - KSRB 4-6.5 : Providing Percentage Additionalities for Formwork, Centering & Scaffolding for Chejjas, Canopy & Other Architectural projections of minor sections 45% (SR VOL I 2023-24, Page No. 112 Item No. Addendum I) Shuttering For Chejjas ---- including cost of all materials, labor ,HOM,l
1.45
3132
4542.386
VOL I 2023-24, Page No. 16 Item No.2.4.1 - Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (SR VOL I 2023-24, Page No. 16 Item No.2.4.1) ---- including cost of all materials, labor ,HOM,l
10.44
6724
70200.648
VOL I 2023-24, Page No. 18 Item No.2.11.a - Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings (SR VOL I 2023-24, Page No. 18 Item No.2.11.a) ---- including cost of all materials, labor ,HOM,l
4.84
93929
454620.474
VOL II 2023-24, Page No. 99 Item No.12.11 - Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. (SR VOL II 2023-24, Page No. 99 Item No.12.11) ---- including cost of all materials, labor ,HOM,l
0.25
144977
36244.425
VOL II 2023-24, Page No. 105 Item No.12.57.8 - Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. (SR VOL II 2023-24, Page No. 105 Item No.12.57.8) ---- including cost of all materials, labor ,HOM,l
10.08
4515
45511.2
VOL II 2023-24, Page No. 86 Item No.11.34B - Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. (SR VOL II 2023-24, Page No. 86 Item No.11.34B) ---- including cost of all materials, labor ,HOM,l
155.52
192
29883.168
VOL II 2023-24, Page No. 108 Item No.12.84 - Providing and fixing of 2track 2panel sliding windows made out of multi chambered UPVC Matching to RAL 9016 sections and with minimum TiO2 Titanium Dioxide at 6 PHR with TPE Thermo Plastic Elastomer and lead free gaskets grey color having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having an overall size of 44mm width x 40mm height with reinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVC honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm Windows shall be provided with 5mm plain float glass standard hardware & single point locking system with Crescent Locks. Wall thickness of frame & sash shall be of 2 mm Maximum possible size 1219mm x 1219mm The cost is inclusive of all fixtures and separate charges for minor T and P shall not be made ---- including cost of all materials, labor ,HOM,l
8.64
5274
45568.656
SR VOL II 2023-24, Page No. A-24 Item No.394 - Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire 0.63 mm (SR VOL II 2023-24, Page No. A-24 Item No.394) ---- including cost of all materials, labor ,HOM,l
8.64
280
2419.2
Vol.2, P.No.41, I.No.8.1.2 - Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.) ---- including cost of all materials, labor ,HOM,l
165.13
253
41786.1465
Vol.2, P.No.42, I.No.8.8 - Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(Vol.2, P.No.42, I.No.8.8 ) ---- including cost of all materials, labor ,HOM,l
302.1
389
117683.055
Vol.2, P.No.50, I.No.8.51 - Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (Vol.2, P.No.50, I.No.8.51) ---- including cost of all materials, labor ,HOM,l
280.95
105
29499.75
Vol.2, P.No.61, I.No.9.17.2 - Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete Size of Tile 600x600 m (Vol.2, P.No.61, I.No.9.17.2) ---- including cost of all materials, labor ,HOM,l
76.78
1233
94727.325
Vol. 2, P.No. 64, I. No.9.34 - Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6,25mm thick ove rexisting cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab,including cost of materials,labour,curing,polishing complete as per specifications.(Vol. 2, P.No. 64, I. No.9.34)
" ---- including cost of all materials, labor ,HOM,l
42.98
1622
69724.305
Vol.2, P.No.46, I.No.8.33.1 - Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Vol.2, P.No.46, I.No.8.33.1) ---- including cost of all materials, labor ,HOM,l
583.05
165
96727.995
VOL II 2023-24, Page No.47 Item No.8.34.1 - Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (SR VOL II 2023-24, Page No.47 Item No.8.34.1) ---- including cost of all materials, labor ,HOM,l
26.21
55
1458.5865
Vol.2, P.No.47, I.No.8.33.3 - Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (Vol.2, P.No.47, I.No.8.33.3) ---- including cost of all materials, labor ,HOM,l
25.71
145
3752.3745
Volume 2 Page No 104 Item No 12.51 - Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.(Volume 2 Page No 104 Item No 12.51) ---- including cost of all materials, labor ,HOM,l
4
1066
4267.2
Vol.2, P. No 125 I.No.13.48 - Providing and fixing on the wall face unplastisized rigid PVC rain water pipes confirmimg to IS:13592 Type A including jointing with seal ring confirmimg to IS:5382, leaving 10mm gap for thermal expansion, single socketed pipes 100mm diameter. ( Vol.2, 1st corrigendum I.No.13.48) ---- including cost of all materials, labor ,HOM,l
27
305
8249.85
Vol.2, P.No.84, I.No.11.26.1 - Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin-Charge. (Vol.2, P.No.84 I.No.11.26.1 ---- including cost of all materials, labor ,HOM,l
97.88
144
14182.812
Quotation rate) - Providing and fixing Green board for class room (Quotation rate) ---- including cost of all materials, labor ,HOM,l
4
8136
32544
Vol.2, P.No.200, I.No.20.34.1 - Providing and fixing chromium plated brass butt hinges with necessary chromium plated brass screws etc. complete.125x70x4 mm (ordinary type) ---- including cost of all materials, labor ,HOM,l
16
178
2856
Vol.2, P.No.107, I.No.12.73.1 - Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete 125mm ---- including cost of all materials, labor ,HOM,l
8
46
369.6
Vol.2, P.No.105, I.No.12.60 - Providing and fixing chromium plated brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete. ---- including cost of all materials, labor ,HOM,l
8
1104
8836.8
Vol.2, P.No.105, I.No.12.63 - Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete ---- including cost of all materials, labor ,HOM,l
8
136
1092
Vol.2, P.No.A-25, S.No.444 - Providing and fixing Hold fasts M.S. for doors etc complete ---- including cost of all materials, labor ,HOM,l
24
50
1200
VOL II 2023-24, Page No. 149 Item No.15.1 - Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. (SR VOL II 2023-24, Page No. 149 Item No.15.1) ---- including cost of all materials, labor ,HOM,l
105.93
857
90872.0505
VOL II 2023-24, Page No.109 Item No.12.85 - Providing & fixing of louvered ventilator made out of multi chambered UPVC Matching to RAL-9016) sections and with minimum TiO2 Titanium Dioxide at 6PHR with TPETherm Plastic Elastomer and lead free with gaskets -greycolour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminiu powder coated in white will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made ---- including cost of all materials, labor ,HOM,l
3.24
6004
19456.038
VOL II 2023-24, Page No. 14 Item No.6.15 - Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (SR VOL II 2023-24, Page No. 14 Item No.6.15) ---- including cost of all materials, labor ,HOM,l
3.78
1084
4099.977
VOL II 2023-24, Page No. A-19 Item No.261 - Cudddapah slab 2.5cms thick (SR VOL II 2023-24, Page No. A-19 Item No.261) ---- including cost of all materials, labor ,HOM,l
6.75
462
3118.5
SR VOL II 2023-24, Page No.46 Item No.8.33.2 - Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @0.75 L/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- including cost of all materials, labor ,HOM,l
26.21
144
3797.829
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements