Public Works Department Tender

... More
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Opening Date14 Feb 2025
Closing Date3 Mar 2025
Tender Amount₹ 2,76,64,093.49 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

  • Tender Id

    PWD/2024-25/RD/WORK_INDENT19046
  • Tender No

    PWD/2024-25/RD/WORK_INDENT19046
  • Tender Authority

    Public Works Department View
  • Purchaser Address

    -
Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
3.4.ii - Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator. Ref to MoRT&H : IRC - 305.4.3 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

2640

5

13200

... More
1.7 - Manual Means - Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m³) ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

102

119

12138

... More
3.6 - Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. Ref to MoRT&H : IRC - 305 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

411.6

493

202918.8

... More
1.8 - Manual Means - Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

1440

474

682560

... More
4.1.A.v - Granular Sub-Base - Plant Mix Method - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 - For Grading -V Material. Ref to MoRT&H : IRC - 401 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

621.6

2487

1545919.2

... More
4.17 - Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory rollerto achieve the desireddensity. Ref to MoRT&H : IRC - 406 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

690

2559

1765710

... More
5.1.A.i - Prime Coat over WMM/WBM - Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. Ref to MoRT&H : IRC - 502 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

2640

41

108240

... More
5.4.ii - Tack coat on Granular surface treated with primer - Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. Ref to MoRT&H : IRC - 503 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

2640

14

36960

... More
5.12.C - Dense Graded Bituminous Macadam Grading - II for traffic <20 MSA - Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Ref to MoRT&H : IRC - 505 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

132

9449

1247268

... More
5.16.B.C - Bituminous Concrete Grading II for traffic <20 MSA - Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. Ref to MoRT&H : IRC - 507 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

79.2

10954

867556.8

... More
8.7 - Direction and Place Identification Signs upto 0.9 m2 Size Board. - Providing and erecting direction and place identification retro- reflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. Ref to MoRT&H : IRC - 801 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

4.48

9010

40364.8

... More
8.5.ii - Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 - 90 cm equilateral triangle. Ref to MoRT&H : IRC - 801 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

3

4684

14052

... More
8.5.viii - Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 - 60 cm circular. Ref to MoRT&H : IRC - 801 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

2

4297

8594

... More
8.5.xv - Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 - 90 cm high octagon. Ref to MoRT&H : IRC - 801 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

1

6502

6502

... More
8.15 - Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface - Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Ref to MoRT&H : IRC - 803 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

96

530

50880

... More
8.43 - Supplying and Fixing of Molded Shank Raised Pavement Markers / Cats Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturers recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Ref to MoRT&H : IRC - MoRTH 806 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

54

365

19710

... More
8.16.iii - Kilometre Stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc - 200 m stone (precast). Ref to MoRT&H : IRC - 805 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

2

842

1684

... More
8.16.ii - Kilometre Stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc - Ordinary kilometer stone (precast). Ref to MoRT&H : IRC - 805 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

1

2927

2927

... More
8.25.i - Metal Beam Crash Barrier - Type - A, W : Metal Beam Crash Barrier - Providing and erecting a W metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811. Ref to MoRT&H : IRC - 811 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

40

3640

145600

... More
2.11.II.A - Dismantling of Structures - Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead - By Mechanical means - Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

36.68

180

6602.4

... More
1.14.1 - Mechanical Means - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

151.81

102

15484.62

... More
2.1.3 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. - Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

21.34

5989

127805.26

... More
2.11.h - Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

12.68

79011

1001859.48

... More
2.4.3 - Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. - M 25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

55.05

6526

359260.704

... More
2.4.3 - Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. - M 25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

84.8

7603

644751.36

... More
2.5.2 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. - M 25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

48.09

8211

394895.844

... More
12.3.A - Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification - Granular material. Ref to MoRT&H : IRC - 710.1.4. of IRC :78 & 2200 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

41.35

1168

48296.8

... More
12.4 - Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Ref to MoRT&H : IRC - 710.1.4. of IRC :78 & 2200 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

10.8

2677

28911.6

... More
2.4.2 - Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. - M 20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

7.14

6323

45146.22

... More
14.4.A - Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications - Stone/Boulder. Ref to MoRT&H : IRC - 2504 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

5.17

1912

9885.04

... More
13.14 - Painting on concrete surface - Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2.. Ref to MoRT&H : IRC - 800 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

33.84

84

2842.56

... More
2.11.II.A - Dismantling of Structures - Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead - By Mechanical means - Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

6.11

180

1099.8

... More
1.14.1 - Mechanical Means - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

69.61

102

7100.22

... More
2.1.3 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. - Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

10.31

5989

61746.59

... More
2.11.h - Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

4.33

79011

342117.63

... More
2.4.3 - Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. - M 25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

17.49

6526

114141.1392

... More
2.4.3 - Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. - M 25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

35.7

7603

271434.24

... More
2.5.2 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. - M 25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

9.16

8211

75218.256

... More
12.3.A - Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification - Granular material. Ref to MoRT&H : IRC - 710.1.4. of IRC :78 & 2200 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

34.65

1168

40471.2

... More
12.4 - Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Ref to MoRT&H : IRC - 710.1.4. of IRC :78 & 2200 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

8.1

2677

21683.7

... More
2.4.2 - Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. - M 20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

4.26

6323

26935.98

... More
14.4.A - Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications - Stone/Boulder. Ref to MoRT&H : IRC - 2504 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

2.1

1912

4015.2

... More
13.14 - Painting on concrete surface - Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2.. Ref to MoRT&H : IRC - 800 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

11.58

84

972.72

... More
1.14.1 - Mechanical Means - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

287.5

102

29325

... More
2.1.3 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. - Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

86.25

5989

516551.25

... More
2.11.h - Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

11.74

79011

927589.14

... More
2.4.2 - Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. - M 20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

78

6512

507989.82

... More
2.4.2 - Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. - M 20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

152.5

8536

1301747.625

... More
17.12 - Providing and laying 100mm thick pre-cast cover slabs over drains & Rain pit of width not exceeding 800 mm using M20 concrete reinforced with Micro Alloyed High carbon steel with 3mm - 3ply wired steel @ 2.00 kg/m2, slabs jointed in CM 1:3 proportion and nicely finished Including providing holes in the Cover slabs wherever necessary for easy drainage of surface water including of labour, materials, scaffolding, usage of machinery, curing, lead and lift charges etc, Complete. ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

360

928

334080

... More
2.5.ii.a - Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer - In area of light jungle ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

6

393

2358

... More
16.19 - Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Ref to MoRT&H : IRC - 1908 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

220

6

1320

... More
10.3 - Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Ref to MoRT&H : IRC - 3003 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

45

39

1755

... More
10.2 - Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Ref to MoRT&H : IRC - 3003 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

30

97

2910

... More
10.15.ii - Patching of Potholes - Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification. ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

13.75

497

6833.75

... More
16.22 - Maintenance of Road Signs - Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification. Ref to MoRT&H : IRC - 1911 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

0.5

1984

992

... More
16.24.i - Maintenance of 200 m and km stones - Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification. -Painting two coats with synthetic enamel paint. Ref to MoRT&H : IRC - 1913 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

0.5

206

103

... More
8.10 - Painting Two Coats on New Concrete Surfaces - Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. Ref to MoRT&H : IRC - 803 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

14

109

1526

... More
8.4 - Printing New Letter and Figures of any Shade - English and Roman. Ref to MoRT&H : IRC - 801 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

2.7

-

2.43

... More
2.5.ii.a - Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer - In area of light jungle ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

9.56

393

3757.08

... More
3.5 - Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. Ref to MoRT&H : IRC - 305.4.3 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

2805

6

16830

... More
16.8.b - Surface Drains in Soil - Construction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. - Mechanical Means. Ref to MoRT&H : IRC - 307 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

465

25

11625

... More
3.4.ii - Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator. Ref to MoRT&H : IRC - 305.4.3 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

2805

5

14025

... More
2.19 - Dismantling of Cement Concrete Pavement - Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 m3 in volume and stock piling at designated locations and disposal of dismantled materials and stacking serviceable and unserviceable materials separately. Ref to MoRT&H : IRC - 202 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

198

563

111474

... More
12.4 - Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Ref to MoRT&H : IRC - 710.1.4. of IRC :78 & 2200 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

43.75

2677

117118.75

... More
3.6 - Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. Ref to MoRT&H : IRC - 305 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

130.17

493

64173.81

... More
1.8 - Manual Means - Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

777

474

368298

... More
4.1.A.v - Granular Sub-Base - Plant Mix Method - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 - For Grading -V Material. Ref to MoRT&H : IRC - 401 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

373.7

2487

929391.9

... More
4.17 - Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory rollerto achieve the desireddensity. Ref to MoRT&H : IRC - 406 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

588.98

2559

1507199.82

... More
6.5 - Pavement Quality M30 grade Concrete (RMC) with OPC & GGBS laid using Paver - Construction of M30 Grade un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing. ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

773

7839

6059547

... More
8.7 - Direction and Place Identification Signs upto 0.9 m2 Size Board. - Providing and erecting direction and place identification retro- reflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. Ref to MoRT&H : IRC - 801 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

6.52

9010

58745.2

... More
8.5.ii - Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 - 90 cm equilateral triangle. Ref to MoRT&H : IRC - 801 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

3

4684

14052

... More
8.5.viii - Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 - 60 cm circular. Ref to MoRT&H : IRC - 801 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

2

4297

8594

... More
8.5.xv - Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 - 90 cm high octagon. Ref to MoRT&H : IRC - 801 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

1

6502

6502

... More
8.15 - Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface - Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Ref to MoRT&H : IRC - 803 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

138

530

73140

... More
8.43 - Supplying and Fixing of Molded Shank Raised Pavement Markers / Cats Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturers recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Ref to MoRT&H : IRC - MoRTH 806 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

76

365

27740

... More
8.16.iii - Kilometre Stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc - 200 m stone (precast). Ref to MoRT&H : IRC - 805 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

3

842

2526

... More
8.16.ii - Kilometre Stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc - Ordinary kilometer stone (precast). Ref to MoRT&H : IRC - 805 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

1

2927

2927

... More
8.25.i - Metal Beam Crash Barrier - Type - A, W : Metal Beam Crash Barrier - Providing and erecting a W metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811. Ref to MoRT&H : IRC - 811 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

100

3640

364000

... More
2.11.II.A - Dismantling of Structures - Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead - By Mechanical means - Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

16.63

180

2993.4

... More
1.14.1 - Mechanical Means - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

96.79

102

9872.58

... More
2.1.3 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. - Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

13.96

5989

83606.44

... More
2.11.h - Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

5.52

79011

436140.72

... More
2.4.3 - Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. - M 25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

22.9

6526

149447.232

... More
2.4.3 - Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. - M 25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

43.91

7603

333856.512

... More
2.5.2 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. - M 25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

12.16

8211

99853.056

... More
12.3.A - Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification - Granular material. Ref to MoRT&H : IRC - 710.1.4. of IRC :78 & 2200 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

41.18

1168

48098.24

... More
12.4 - Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Ref to MoRT&H : IRC - 710.1.4. of IRC :78 & 2200 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

9

2677

24093

... More
2.4.2 - Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. - M 20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

5.97

6323

37748.31

... More
14.4.A - Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications - Stone/Boulder. Ref to MoRT&H : IRC - 2504 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

2.92

1912

5583.04

... More
13.14 - Painting on concrete surface - Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2.. Ref to MoRT&H : IRC - 800 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

18.96

84

1592.64

... More
1.14.1 - Mechanical Means - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

290.62

102

29643.24

... More
2.1.3 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. - Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

70.48

5989

422104.72

... More
2.11.h - Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

6.94

79011

548336.34

... More
2.4.2 - Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. - M 20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

50.82

6512

330974.9058

... More
2.4.2 - Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. - M 20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

103.5

8536

883481.175

... More
17.12 - Providing and laying 100mm thick pre-cast cover slabs over drains & Rain pit of width not exceeding 800 mm using M20 concrete reinforced with Micro Alloyed High carbon steel with 3mm - 3ply wired steel @ 2.00 kg/m2, slabs jointed in CM 1:3 proportion and nicely finished Including providing holes in the Cover slabs wherever necessary for easy drainage of surface water including of labour, materials, scaffolding, usage of machinery, curing, lead and lift charges etc, Complete. ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

252

928

233856

... More
2.5.ii.a - Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer - In area of light jungle ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

8.64

393

3395.52

... More
16.19 - Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Ref to MoRT&H : IRC - 1908 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

262

6

1572

... More
10.3 - Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Ref to MoRT&H : IRC - 3003 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

22.14

39

863.46

... More
10.2 - Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Ref to MoRT&H : IRC - 3003 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

14.76

97

1431.72

... More
16.22 - Maintenance of Road Signs - Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification. Ref to MoRT&H : IRC - 1911 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

0.72

1984

1428.48

... More
16.24.i - Maintenance of 200 m and km stones - Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification. -Painting two coats with synthetic enamel paint. Ref to MoRT&H : IRC - 1913 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

0.72

206

148.32

... More
8.10 - Painting Two Coats on New Concrete Surfaces - Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. Ref to MoRT&H : IRC - 803 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

14

109

1526

... More
8.4 - Printing New Letter and Figures of any Shade - English and Roman. Ref to MoRT&H : IRC - 801 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

2.7

-

2.43

... More
2.5.ii.a - Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer - In area of light jungle ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

6

393

2358

... More
16.19 - Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Ref to MoRT&H : IRC - 1908 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

220

6

1320

... More
10.3 - Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Ref to MoRT&H : IRC - 3003 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

45

39

1755

... More
10.2 - Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Ref to MoRT&H : IRC - 3003 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

105

97

10185

... More
10.15.ii - Patching of Potholes - Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification. ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

27.5

497

13667.5

... More
16.22 - Maintenance of Road Signs - Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification. Ref to MoRT&H : IRC - 1911 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

0.5

1984

992

... More
16.24.i - Maintenance of 200 m and km stones - Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification. -Painting two coats with synthetic enamel paint. Ref to MoRT&H : IRC - 1913 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

0.5

206

103

... More
8.10 - Painting Two Coats on New Concrete Surfaces - Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. Ref to MoRT&H : IRC - 803 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

14

109

1526

... More
8.4 - Printing New Letter and Figures of any Shade - English and Roman. Ref to MoRT&H : IRC - 801 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

2.7

-

2.43

... More
2.5.ii.a - Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer - In area of light jungle ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

6

393

2358

... More
16.19 - Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Ref to MoRT&H : IRC - 1908 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

220

6

1320

... More
10.3 - Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Ref to MoRT&H : IRC - 3003 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

45

39

1755

... More
10.2 - Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Ref to MoRT&H : IRC - 3003 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

180

97

17460

... More
10.15.ii - Patching of Potholes - Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification. ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

41.25

497

20501.25

... More
16.22 - Maintenance of Road Signs - Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification. Ref to MoRT&H : IRC - 1911 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

0.5

1984

992

... More
16.24.i - Maintenance of 200 m and km stones - Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification. -Painting two coats with synthetic enamel paint. Ref to MoRT&H : IRC - 1913 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

0.5

206

103

... More
8.10 - Painting Two Coats on New Concrete Surfaces - Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. Ref to MoRT&H : IRC - 803 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

14

109

1526

... More
8.4 - Printing New Letter and Figures of any Shade - English and Roman. Ref to MoRT&H : IRC - 801 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

2.7

-

2.43

... More
2.5.ii.a - Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer - In area of light jungle ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

8.64

393

3395.52

... More
16.19 - Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Ref to MoRT&H : IRC - 1908 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

262

6

1572

... More
10.3 - Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Ref to MoRT&H : IRC - 3003 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

22.14

39

863.46

... More
10.2 - Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Ref to MoRT&H : IRC - 3003 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

51.66

97

5011.02

... More
16.22 - Maintenance of Road Signs - Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification. Ref to MoRT&H : IRC - 1911 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

0.72

1984

1428.48

... More
16.24.i - Maintenance of 200 m and km stones - Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification. -Painting two coats with synthetic enamel paint. Ref to MoRT&H : IRC - 1913 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

0.72

206

148.32

... More
8.10 - Painting Two Coats on New Concrete Surfaces - Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. Ref to MoRT&H : IRC - 803 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

14

109

1526

... More
8.4 - Printing New Letter and Figures of any Shade - English and Roman. Ref to MoRT&H : IRC - 801 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

2.7

-

2.43

... More
2.5.ii.a - Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer - In area of light jungle ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

8.64

393

3395.52

... More
16.19 - Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Ref to MoRT&H : IRC - 1908 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

262

6

1572

... More
10.3 - Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Ref to MoRT&H : IRC - 3003 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

22.14

39

863.46

... More
10.2 - Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Ref to MoRT&H : IRC - 3003 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

88.56

97

8590.32

... More
16.22 - Maintenance of Road Signs - Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification. Ref to MoRT&H : IRC - 1911 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

0.72

1984

1428.48

... More
16.24.i - Maintenance of 200 m and km stones - Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification. -Painting two coats with synthetic enamel paint. Ref to MoRT&H : IRC - 1913 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

0.72

206

148.32

... More
8.10 - Painting Two Coats on New Concrete Surfaces - Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. Ref to MoRT&H : IRC - 803 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

14

109

1526

... More
8.4 - Printing New Letter and Figures of any Shade - English and Roman. Ref to MoRT&H : IRC - 801 ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

2.7

-

2.43

... More
PWD SR 2023-24, Vol-3 Page No 129 Item No 14.4.A - Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder.(Reuse of Boulder Stone) ---- Item including cost and conveyance of all materialslead and lift charges loading and unloading charges labor charges allincidental charges hire charges of all machinery and equipment requiredfor successful completion of work etc. The work shall be executed asper standard technical specification and directions of Engineer in charge of the work

7.23

1066

7713.5424



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.