Public Works Department Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Public Works Department - PWD Tender

Civil And Construction
Civil Works Others
Electrical and Electronics
Electrical Works
Opening Date31 Aug 2024
Closing Date17 Sep 2024
Tender Amount₹ 15,24,716.48 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
7.02 - Rabbit ACSR Conductor (6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM) (Vol-06, ESCOM's SR. 2023-24 Part- II, Page No.05 - Item No 7.02) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

14.1

65561

924416.304

... More
5.11 - Turn Buckle-GI (Dwg No. BESCOM/GM/QS&S/07 Dtd 24.11.2018) (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 05 - Item No 5.11) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

35

269

9447.2

... More
1.6.1 - Digging of Pit for providing GI Pipe type Earthing - Ordinary Soil (Vol-06, ESCOM's SR. 2023-24 Part- II, Page No. 43 - Item No 1.6.1) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

13

850

11051.04

... More
6.07 - No. 8 Strain Insulater (Vol-06, ESCOM's SR. 2023-24 Part- II, Page No.05 - Item No 6.07) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

6

30

181.44

... More
6.02 - Stringing of conductor Rabbit ACSR binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps (Vol-06, ESCOM's SR. 2023-24 Part- II, Page No. 46 Item No 6.02) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

14.1

4884

68868.912

... More
5.13 - Anchor Rod using 12mm rounds/Guy Rod-GI (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 05 - Item No 5.13) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

30

368

11054.4

... More
51.02 - Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each. (Vol-06, ESCOM's SR. 2023-24 Part- II, Page No. 22- Item No 51.02) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

12

757

9085.44

... More
8.01 - 7/10 SWG Guy Wire (7/3.251mm Dia), Std Wt: 680Kg/KM (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 05 - Item No 8.01) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

0.25

86493

21623.28

... More
51.03 - Good Quality Salt for grounding purposes packed in 50 Kg gunny bag. (Vol-06, ESCOM's SR. 2023-24 Part- II, Page No. 22- Item No 51.03) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

13

347

4513.6

... More
3.01 - Releasing and Refixing of Double Pole TC Sets for 25/ 63 KVA Transformers GI using 9 Mtr RCC (145kg WL) Pole including fixing of Structure Materials, Erections of Pole etc. complete (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 44 Item No 3.01) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

3

12182

36548.4

... More
6.01 - Releasing and Refixing- Weasel ACSR conductor, Stringing of conductor, binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 46 Item No 6.01) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

5

6767

33835.2

... More
2.02 - Releasing and Refixing of 9 Mtr RCC (145kg WL) Poles -Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 43 Item No 2.02) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

13

2368

30789.98

... More
6.02 - Releasing and Refixing of Rabbit ACSR conductor, Stringing of conductor, binding of conductor on each insulator and dead ending on strain or disc /strain insulator by means of clamps (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 46 Item No 6.02) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

7.98

9280

74056.0758

... More
1.1.1 - Releasing and Refixing of Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 44 Item No 1.1.1) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

13

1338

17400.63

... More
2.01 - Releasing and Refixing of 8 Mtr PSCC (200kg WL) Poles -Erection of RCC/PSCC Pole of 7.5 to 8 Mtr long in a pit of 1.5 Mtr depth (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 43 Item No 2.01) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

12

1962

23544.24

... More
5.04 - Releasing and Refixing of V-Shape/ Horizontal cross arm for DC Line including Braces and Insulators fixing. (Without Single Top Support) (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 45 Item No 5.04) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

56

340

19066.88

... More
2.02 - Releasing and Refixing of 9 Mtr PSCC (200kg WL) Poles -Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 43 Item No 2.02) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

28

2368

66316.88

... More
13.02 - Releasing and Refixing of GOS including wiring (11 kV Single Break 200 Amps) (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 48 Item No 13.02) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

6

2349

14095.86

... More
2.07 - Releasing and Refixing -Erection of 2 Pole Structure using RCC/PSCC Pole 7.5/8 Mtr long (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 43 I.No 2.07) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

4

8797

35188.6

... More
1.1.1 - Releasing and Refixing of Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 44 Item No 1.1.1) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

28

1338

37478.28

... More
2.09 - Releasing and Refixing of H Frame ERECTION (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 44 Item No 2.09) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

4

687

2749.36

... More
1.2.1 - Releasing and Refixing Digging of Pit 1.6 Mtr depth for erection of 7.5/8 Mtr Long Steel/RCC/PSCC supports as per approved Drawing (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 44 Item No 1.2.1) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

20

1070

21407.6

... More
5.02 - Releasing and Refixing of 4 Pin cross arm with insulator and Braces fixing (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 45 Item No 5.02) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

70

340

23833.6

... More
8.01 - Releasing and Refixing of Distribution Transformer 63kVA on Tranfermer structure(Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 46 Item No 8.01) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.

4

2538

10154.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.