Public Works Department Tender

... More
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Public Works Department - PWD Tender

Works
Civil And Construction
Civil Works Others
Opening Date18 Feb 2025
Closing Soon27 Feb 2025
Tender Amount₹ 20,10,022.83 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

  • Tender Id

    PWD/2024-25/BD/WORK_INDENT19807
  • Tender No

    PWD/2024-25/BD/WORK_INDENT19807
  • Tender Authority

    Public Works Department View
  • Purchaser Address

    -
Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
PWD CSR Vol-1 Pg No. 73. I No 2.1.4) - Mix 1:3:6 Using 20 mm and down size graded crushed coarse aggregates(PWD CSR Vol-1 Pg No. 73. I No 2.1.4) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work

13.25

6465

85670.26

... More
PWD CSR Vol-1 Pg No. 73. I No 2.4.1) - MIX 1:2:4 (M15) Using 20 mm and down size graded crushed coarse aggregates(PWD CSR Vol-1 Pg No. 73. I No 2.4.1) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work

61.15

6660

407268.784

... More
PWD CSR Vol-2 Pg No. 63. I No 9.25 - Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.(PWD CSR Vol-2 Pg No. 63. I No 9.25) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work

466.35

832

388003.2

... More
PWD CSR Vol-1 Pg No:7 No: 1.9) - KSRB 2.3 : Filling available excavated earth ( excluding rock ) in sides of foundations upto plinth in layers not exceeding 20 cms. in depth, compacting each deposited layer by ramming after watering with lead upto 50 m. and lift upto 1.5 m. including cost of all labour complete as per specifications. specification. No. KBS 2.9 9 (PWD CSR Vol-1 Pg No:7 No: 1.9) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work

43.2

276

11950.848

... More
PWD CSR Vol-2 Pg No:206 No: 20.88) - Repairs to plaster in patches of 2.5 m2 and less in walls, ceilings 10 to 20mm thick in cement mortar 1:3 including cutting the patches in proper shape and replastering the surface of the wall including disposal of rubbish with a lead of 50m including curing cost of materials, labour, complete as per specification. (PWD CSR Vol-2 Pg No:206 No: 20.88) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work

64.35

414

26702.676

... More
PWD CSR Vol-2 Pg No. 122. I No 13.31.3 - Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge.(PWD CSR Vol-2 Pg No. 122. I No 13.31.3)25 m dia ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work

200

330

66144

... More
PWD CSR Vol-2 Pg No. 150. I No 15.8) - old Terrace screed Repair with Uv Resistant waterproof coating Providing and Applying high elastic & resilient Acrylic polymer Waterproofing coating which is single component, cold applied, water based acrylic and UV resistant water proofing treatment to the Existing Roof screed surface applied @ 1.5 l/m2 in 3 coats to achieve 1mm DFT, having tensile strength 1.2 N/mm 2 confirming to ASTM D 412; Elongation at break 100% and Crack bridging ability up to 2 mm, including surfacepreparation, priming the surface with 1 coat of Efflorescence resistant penetrating primer dilute with water in the ratio 2:1 spreading at the rate of 0.125 l/m2 in the SSD condition and spreading 45 gsm glass fibre mesh of 2.5 mm x 2.5 mm sandwiched between the first and second coat completely as per specification. The finished cost to include surface preparation, making coving at Junction, treatment of cracks completely as per specification(PWD CSR Vol-2 Pg No. 150. I No 15.8) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work

115.44

717

82839.744

... More
PWD CSR Vol-2 Pg No. 25I No 7.32.1) - Providing and fixing false ceiling at all height including providing and fixingof frame work made of special sections, power pressed from M.S. sheets and galvanized with zinc coating of 120 g/m2 (both side inclusive) as per IS : 277 and consisting of angle cleats of size 25 mm wide x 1.6 mm thick with flanges of 27 mm and 37mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x 50mm long with 6mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I. channels 45x15x0.9 mm running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each having lips of 10.5 mm, at 450 mm centre to centre, shall be fixed in a direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long G.I. wire at every junction, including fixing perimeter channels 0.5 mm thick 27 mm high having flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre, with 25mm long dry wall screws @ 230 mm interval, including fixing of gypsum board to ceiling section and perimeter channel with the help of dry wall screws of size 3.5 x 25 mm at 230 mm c/c, including jointing and finishing to a flush finish of tapered and square edges of the board with recommended jointing compound, jointing tapes , finishing with jointing compoud in 3 layers covering upto 150 mm on both sides of joint and two coats of primer suitable for board, all as per manufacturer's specification and also including the cost of making openings for light fittings, grills, diffusers, cutouts made with frame of perimeter channels suitably fixed, all complete as per drawings, specification and direction of the Engineer in Charge but excluding the cost of painting with :12.5 mm thick tapered edge gypsum plain board conforming to IS: 2095- (Part I) : 2011 (Board with BIS Certification marks only)PWD CSR Vol-2 Pg No. 25I No 7.32.1) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work

59.52

1022

60848.4864

... More
Data rate-SE office buildings-261-29.04.2022 - Supplying of Nilkamal Chairs. The rate including cost of all materials, labours charges with all lead and lift, loading and unloading, transportation charges and all other incidental charges etc., complete as per specification and directions of the Engineer-in-charge of the work(Data rate-SE office buildings-261-29.04.2022 ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work

55

736

40480

... More
PWD CSR Vol-2 Pg No:51 No: 8.63) - Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: One coats on old work as per specifications and as per directions of Engineer in charge. (PWD CSR Vol-2 Pg No:51 No: 8.63) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work

64.35

85

5487.768

... More
PWD CSR Vol-2 Pg No:14 No: 6.8 - Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand)including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (PWD CSR Vol-2 Pg No:14 No: 6.8) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work

29.85

8287

247389.636

... More
PWD CSR Vol-2 Pg No:41 No: 8.2.2) - Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD CSR Vol-2 Pg No:41 No: 8.2.2) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work

253.79

290

73639.7064

... More
PWD CSR Vol-2 Pg No:45 No: 8.28) - Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD CSR Vol-2 Pg No:45 No: 8.28) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work

253.79

92

23490.8024

... More
PWD CSR Vol-1 Pg No:69 No: 10.1.1) - providing and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar loca tions of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch up, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. (PWD CSR Vol-1 Pg No:69 No: 10.1.1) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work

69.85

4166

291011.864

... More
PWD CSR Vol-2 Pg No:52 No: 8.67) - French spirit polishing :One coats on old work to give an even surface including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering smooth , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge(PWD CSR Vol-2 Pg No:52 No: 8.67) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work

73

154

11312.08

... More
PWD CSR Vol-2 Pg No:51 No: 8.61) - Painting on G.S. sheet with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Old work (one coats) as per specifications and as per directions of Engineer in charge.(PWD CSR Vol-2 Pg No:51 No: 8.61) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work

46.35

69

3229.668

... More
se letter numberno:696 dated:05.07.2021) - SUPPLY OF SUMSUNG WASHING MACHINE 9.00KG including cost of all materials labour charges machinary chrges with all lead and lift loading un loading transportation and all other incidental charges (se letter numberno:696 dated:05.07.2021) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work

2

78775

157550



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.