Public Works Department Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Public Works Department - PWD Tender

Works
Civil And Construction
Bridge Construction
Opening Date12 Nov 2024
Closing Date26 Nov 2024
Tender Amount₹ 16,91,005.39 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

  • Tender Id

    PWD/2024-25/BR/WORK_INDENT16478
  • Tender No

    PWD/2024-25/BR/WORK_INDENT16478
  • Tender Authority

    Public Works Department View
  • Purchaser Address

    -
Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
SR Rate 2023-24 Vol-1 P.No.15 I.No.2.1.3 - Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (SR Rate 2023-24 Vol-1 P.No.15 I.No.2.1.3) ---- With lead

13.39

6707

89815.8352

... More
SR Rate 2023-24 Vol-1 P.No.15 I.No.2.2.3 - Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (SR Rate 2023-24 Vol-1 P.No.15 I.No.2.2.3) ---- With lead

34.56

7096

245248.8192

... More
SR Rate 2023-24 Vol-1 P.No.112 I.No.6 - Formwork, Centering & Scaffloding 20% For Box Culvert Raft Foundation (SR Rate 2023-24 Vol-1 P.No.112 I.No.6) ---- With lead

34.56

1589

54935.8848

... More
SR Rate 2023-24 Vol-1 P.No.16 I.No.2.4.3 - Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (SR Rate 2023-24 Vol-1 P.No.16 I.No.2.4.3) ---- With lead

38.61

7096

273988.9152

... More
SR Rate 2023-24 Vol-1 P.No.112 I.No.6 - Formwork, Centering & Scaffloding 20% for Piers & Abutments walls of Box Culvert (SR Rate 2023-24 Vol-1 P.No.112 I.No.6) ---- With lead

38.62

1589

61389.5796

... More
SR Rate 2023-24 Vol-1 P.No.16 I.No.2.5.2 - Providing and laying in position Reinforced cement concrete for all Super structures of building,Road works,Water works, Irrigation works, Super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately, M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (SR Rate 2023-24 Vol-1 P.No.16 I.No.2.5.2) ---- With lead

10.61

7664

81316.7376

... More
SR Rate 2023-24 Vol-1 P.No.112 I.No.6 - Formwork, Centering & Scaffloding 20% For Solid slab super structures for Box Culvert. (SR Rate 2023-24 Vol-1 P.No.112 I.No.6) ---- With lead

10.6

1716

18197.762

... More
SR Rate 2023-24 Vol-1 P.No.18 I.No.2.11b - Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Foundations of Bridges.(SR Rate 2023-24 Vol-1 P.No.18 I.No.2.11b) ---- With lead

1.73

96550

167032.7456

... More
SR Rate 2023-24 Vol-1 P.No.18 I.No.2.11c - Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges.(SR Rate 2023-24 Vol-1 P.No.18 I.No.2.11c) ---- With lead

2.51

96804

242980.4496

... More
SR Rate 2023-24 Vol-1 P.No.18 I.No.2.11d - Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Super structure of Bridges.(SR Rate 2023-24 Vol-1 P.No.18 I.No.2.11d) ---- With lead

0.74

97056

71822.1504

... More
SR Rate 2023-24 Vol-3 P.No.117 I.No.12.4 - Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. (SR Rate 2023-24 Vol-3 P.No.117 I.No.12.4) ---- With lead

60.59

2998

181663.3616

... More
SR Rate 2023-24 Vol-3 P.No.117 I.No.12.2 - Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2 , extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. (SR Rate 2023-24 Vol-3 P.No.117 I.No.12.2) ---- With lead

20

267

5353.6

... More
SR Rate 2023-24 Vol-3 P.No.121 I.No.13.7 - Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification (SR Rate 2023-24 Vol-3 P.No.121 I.No.13.7) ---- With lead

4

3663

14654.08

... More
SR Rate 2023-24 Vol-3 P.No.121 I.No.13.4 - Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.(SR Rate 2023-24 Vol-3 P.No.121 I.No.13.4) ---- With lead

11.4

2535

28906.752

... More
SR Rate 2023-24 Vol-3 P.No.123 I.No.13.15(ii - Filler joint Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification. (SR Rate 2023-24 Vol-3 P.No.123 I.No.13.15(ii) ---- With lead

13.6

153

2086.784

... More
SR Rate 2023-24 Vol-3 P.No.117 I.No.12.3 - Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification A. Granular material (SR Rate 2023-24 Vol-3 P.No.117 I.No.12.3) ---- With lead

51.69

1308

67618.7904

... More
SR Rate 2023-24 Vol-1 P.No.7 I.No.1.8 - Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per pecifications, including cost of labour,rolling,water,all materials,usage& all ther appurtenaces required to complete the work.(SR Rate 2023-24 Vol-1 P.No.7 I.No.1.8) ---- With lead

12.38

557

6900.8596

... More
SR Rate 2023-24 Vol-3 P.No.129 I.No.14.4 - Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications A. Stone/Boulder (SR Rate 2023-24 Vol-3 P.No.129 I.No.14.4) ---- With lead

3.6

2141

7709.184

... More
SR Rate 2023-24 Vol-3 P.No.79 I.No.8.55 - Providing and fixing RCC name board of size 1.35x0.60x0.04 m fixed in reinforced cement concrete poles of size 0.10x0.10x2.60m in cement concrete M 20 proportion using 20mm and down size graded metal machine mixed with 10mm dia main steel bars and 8mm dia stirpes as shown in drawing. The board shall be provided with 12mm thick cement plaster in cement mortar 1:4 on both the sides. The poles shall be embedded in the ground for a depth of 0.5 m with cement concrete M 10 proportion. The board shall be fixed as per the drawing and at the place indicated by the Engineer in charge of the work. The cost includes excavation, cost of all materials, cost of steel, painting, centering, transportation charges &fixing charges. (SR Rate 2023-24 Vol-3 P.No.79 I.No.8.55) ---- With lead

1

6564

6564.32



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.