Public Works Department Tender
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.
Costs
EMD
₹ 1,34,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
KPWD/2021-22/BD/WORK_INDENT149081Bid Award Id
ViewTender No
KPWD/2021-22/BD/WORK_INDENT149081Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://kpwd.karnataka.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying, Fitting and Placing un-coated TMT bar Reinforcement in sub-structure complete as per Drawing and Technical Specifications. (Page No. 99, SI No. 13.1) of 2021-22 CSR Volume-3 ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
6.16
-
668331.97
... More
Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (Page No. 13, SI No. 6.7) of 2021-22 CSR Volume-2 ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
43.0628
-
318139.35
... More
Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size – 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (Page No. 112, SI No. 12.9) of 2021-22 CSR Volume-2 ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
21.87
-
166255.74
... More
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. to openings / wooden frames with rawl plugs screws etc. (Page No. 85, SI No. 11.34B) of 2021-22 CSR Volume-2 ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
459.27
-
68959.39
... More
Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. (Page No. 99, SI No. 12.11) of 2021-22 CSR Volume-2 ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
0.288
-
27334.84
... More
Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. ( excluding cost of fixtures ) (Page No. 100, SI No. 12.15) of 2021-22 CSR Volume-2 ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
12.6
-
67129.02
... More
Providing and laying Polished Glazed Vitrified tiles in floor with different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately). (Page No. 62, SI No. 9.22.2) of 2021-22 CSR Volume-2 ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
109.525
-
145016.58
... More
Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Page No. 42, SI No. 8.8) of 2021-22 CSR Volume-2 ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
165.456
-
54377.11
... More
Appendix I â Additionalities for Formwork, Centering & Scaffolding, Plastering & Painting of New walls ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
165.45
-
13593.37
... More
Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Page No. 41, SI No. 8.5.2) of 2021-22 CSR Volume-2 ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
199.874
-
63170.18
... More
Appendix I â Additionalities for Formwork, Centering & Scaffolding, Plastering & Painting of New walls ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
199.87
-
15791.73
... More
Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m�) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Page No. 45, SI No. 8.28) of 2021-22 CSR Volume-2 ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
165.45
-
11465.68
... More
Appendix I â Additionalities for Formwork, Centering & Scaffolding, Plastering & Painting of New walls ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
165.45
-
2867.25
... More
Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Page No. 48, SI No. 8.39) of 2021-22 CSR Volume-2 ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
199.874
-
19937.43
... More
Appendix I ââ¬â Additionalities for Formwork, Centering & Scaffolding, Plastering & Painting of New walls ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
199.874
-
4984.86
... More
Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/ Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. (Page No. 133, Sl no. 15.1) of 2021-22 CSR Volume-2 ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
127.8176
-
99985.32
... More
Providing & Fixing of Mineral Fibre Suspended Ceiling System in the module size of 600x600x19mm with Exposed grid for Hospitals, Shopping malls, Commercial establishments and office complexes. The tiles should have Humidity Resistance (RH) of 99%, Light Reflectance 87%, Thermal Conductivity k = 0.052 - 0.057 w/m K, NRC -0.7,Colour White, Fire Performance UK A2 S1, dO, with Anti Microbial coating on the face of the tile, suitable for zone 4 area according to NF S 90-35:2003 with cleanroom class of ISO 5 (Class 100), Decontamination Class of CP1Oand Bacteriological Cleanliness Class B1 for specific strains and reduction in colony size. Washability properties of 500 wash cycles as per ASTM D-4828 and suitable for Green Building application with Recycled content of 37%. The tile shall be laid on 24mm wide T - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees with a web height of 38mm and a load carrying capacity of 15 kg/m2 & pull out strength of minimum 100 kg The T Sections should have a Galvanizing of 90 grams per m2 and need to be installed with suspension system of approved make. (Page No. 32, Sl no. 7.50) of 2021-22 CSR Volume-2 ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
64.97
-
126613.54
... More
Providing and supplying 'Acoustical Wall Paneling' with square edges made of fibre glass substrate 25mm thick and wrapped on the front side with an acoustically transparent and classified for Fire reaction Class A, as per ASTM E-84, fabric with option of colors - as per the choice of the Architect/Engineer incharge of the size 600x600mm, 600x1200mm & 600x1800mm providing a minimum sound absorption level of 0.85 NRC to be affixed to wall using Wall panel lmpaler sand construction adhesives as per the instructions laid down by the certified manufacturer. (Page No. 32, Sl no. 7.51) of 2021-22 CSR Volume-2 ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
129.94
-
591181.52
... More
Special Chair Bottom 5 Leg base- Nylon with LD plastic Mixed Molded materials. Wheels- Nylon Ld mixed Twin wheeling for moving of the Chairs. Hydraulicsâ- 16g sheet round fipe inner gas filled cylinder. Mechanism- Its support for chairs tilting and Hydraulics operating system with made of 2mm metal sheet, tilting 6mm spring with turning Knob, T bolt Punched lock. Handles- Nylon Mixed Poly Plastic arms, PU plastic Arms, Adjustable Arms with cushioning effect for hands. Seat back Plywoodâs- Silver wood layer compressed plywood with 19 mm thick or 18mm thick and 6mm drilling T nut will be fixing to the Plywood for assembly. Seat back Cushion â Molded Cushion with above 40 Density, U foam will Be 40 density. Back Abs-this abs are made By 1.5mm HIPS sheet for supporting back. Metal base- this base made by 2mm sheet folding with Tig welding and turned bush for wheel fixing and Quality Chrome Plating. Chairs Cloth- Cloth will be cotton, Nylon mixed, nylon netted, art leatherite Materials. Metal Frames- 16g Round Pipes bending frames for Visitor Chairs for Labs, canteen. Out house, Tables. ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
5
-
74500
... More
Exucutive Med back Bottom 5 Leg base- Nylon with LD plastic Mixed Molded materials. Wheels- Nylon Ld mixed Twin wheeling for moving of the Chairs. Hydraulicsâ- 16g sheet round fipe inner gas filled cylinder. Mechanism- Its support for chairs tilting and Hydraulics operating system with made of 2mm metal sheet, tilting 6mm spring with turning Knob, T bolt Punched lock. Handles- Nylon Mixed Poly Plastic arms, PU plastic Arms, Adjustable Arms with cushioning effect for hands. Seat back Plywoodâs- Silver wood layer compressed plywood with 19 mm thick or 18mm thick and 6mm drilling T nut will be fixing to the Plywood for assembly. Seat back Cushion â Molded Cushion with above 40 Density, U foam will Be 40 density. Back Abs-this abs are made By 1.5mm HIPS sheet for supporting back. Metal base- this base made by 2mm sheet folding with Tig welding and turned bush for wheel fixing and Quality Chrome Plating. Chairs Cloth- Cloth will be cotton, Nylon mixed, nylon netted, art leatherite Materials. Metal Frames- 16g Round Pipes bending frames for Visitor Chairs for Labs, canteen. Out house, Tables. ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
26
-
336960
... More
Manufacturing and supplying Ward robe of size 5feet x 7feet, three doors with 19mm, 12mm and 9mm thick kitply wood. Inside surface laminated with white formach sheet outer surface with yellow colour sheet, shutters fixed with 4"brass hinges and 4" steel handles. Polishing including cost of materials labour charges lead lifts, conveying charges to workspot. HOM of machineries etc., complete as per specification & as directed by the Engineer in charge of the work. ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
2
-
71000
... More
Manufacturing and supplying of Window curtain of size 8feet x 9feet size for VIP suits by using Brass socket - double valver. Draped with finishing cloth and decorative scalap, slating crush colth material. 3" size dia power coated aluminium pupes including cost of materials labour charges lead lifts, conveying charges to work spot. HOM of machineries etc., complete as per specification & as directed by the Engineer in charge of work. ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
6
-
66000
... More
Manufacturing and supplying Dining table(U-shape) of 47feet x 2 1/2feet x 2'x9'' by using 19mm, for top surface and for supports holding the table. 12mm thick kit ply wood shall be used for the sides and for decorative pupose laminated sheet of 1mm thick shall be draped for exposed faces, including cost of materials labour charges, lead lifts, conveying charges to workspot. HOM of machineries etc., complete as per specification & as directed by the Engineer in charge of the work. ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
1
-
82000
... More
Size of Center Table 3'0" x 3'0"Using 3"x3" teak wood first quality well seasoned burma teak with top 12mm thick glass etching & edges bevelling/ Chamfering. glass will rest on s.s. studs fix to teak wood frame work Cost including all necessary hardware screws labour, Melamine polish for wooden surface and matearils etc., complete. Over all size of table top of 3'0 " x3'0 ". ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
2
-
16000
... More
Providing and laying heavy duty cobble stones 75mm thick interlock pavers, using cement and course sand for manufacture of blocks of approved size, shape and colour with a minimum compressive strength of 281 kg per m2 over 50mm thick sand bed ( average thickness ) and compacting with plate vibrator having 3 tons compaction force thereby forcing part of sand underneath to come up in between joints, final compaction of paver surface joints into its final level, including cost of materials, labour and Usage charges of machinery complete as per specifications. (Page No. 64, SI No. 9.32) of 2021-22 CSR Volume-2 ---- including cost of all materials, labour, HOM, I & UL, Curing with all leads and lifts etc., complete as per specifications & as directed by Engineer-in-charge of the work.
360
-
432810
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements