Public Works Department Tender
... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Improvements For Bridge Approach At Km 2.00 Nitte Parappadi Baradi Road In Karkala Taluk in Udupi, Karnataka, with an estimated contract value of Rs. 41,99,694. The bid opening date for this tender is 30-08-2024 and the last date for bid submission is 06-09-2024. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Public Works Department - PWD Tender
Opening Date30 Aug 2024
Closing Date6 Sep 2024
Tender Amount₹ 41,99,694.36
Costs
EMD
₹ 84,000Document Cost
Refer DocumentsTender Fee
₹ 1,050
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
PWD/2024-25/RD/WORK_INDENT15120Bid Award Id
ViewTender No
PWD/2024-25/RD/WORK_INDENT15120Tender Authority
Public Works Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
5.31 - Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. (S.R.I.No. 5.31 P. 43 PWD Common SR Volume-3 for the year 2024-25) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
39.88
11370
453445.1712
... More
4.1 - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (v) For Grading -V Material (S.R.I.No. 4.1 P.23, PWD Common SR Volume-3 for the year 2024-25) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
183.43
2785
510933.2592
... More
5.33 - Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. (S.R.I.No. 5.33 P.43, PWD Common SR Volume-3 for the year 2024-25) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
1595
16
26796
... More
1.7 - Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (S.R.I.No. 1.7 P.33, PWD Common SR Volume-1 for the year 2024-25) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
368.45
133
49107.016
... More
1.8 - Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with alllifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications, including cost of labour, rolling,water,all materials,usage& all other appurtenaces required to complete the work. (S.R.I.No. 1.8 P.7, PWD Common SR Volume-1 for the year 2024-25) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
1537.2
530
816068.736
... More
5.8 (ii)(C ) - Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.4% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction (S.R.I.No. 5.8 (ii)(C ) P.33 PWD Common SR Volume-3 for the year 2024-25) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
79.75
8580
684280.52
... More
10.14.1 - Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. (S.R.I.No.10.14.1, P. 120 , Vol-5 RWS SR 2024-25) 4 Kg/m2: 63mm(weight of pipe -0.465 kg) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
319
131
41801.76
... More
10.1.6 - Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS(Contractor will make his own arrangements for procuring water for testing) etc. complete (S.R.I.No.10.1.6, P. 113 , Vol-5 RWS SR 2024-25) PVC pipes 90mm dia., 6 kg/sqcm & class 3 ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
319
329
105040.32
... More
3.4 (ii) - Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator including cost of labour, all materials,usage& all other appurtenaces required to complete the work. (S.R.I.No. 3.4 (ii) P.17, PWD Common SR Volume-1 for the year 2024-25) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
1595
5
8932
... More
1.14.1 - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (S.R.I.No. 1.14.1 P.8, PWD Common SR Volume-1 for the year 2024-25 ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
287.1
114
32798.304
... More
1.12 - Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth (S.R.I.No. 1.12 P.8, PWD Common SR Volume-1 for the year 2024-25) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
526.35
106
56003.64
... More
4.17 - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Wet Mix Macadam (Plant Mix Method) (S.R.I.No. 4.17 P.26, PWD Common SR Volume-3 for the year 2024-25) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
422.68
2866
1211434.6944
... More
1.14.1 - Earth work excavation by MECHANICAL means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. 1.4.1 In all kinds of soils Depth upto 1.5 m (S.R.I.No. 1.14.1, P.8 Vol-1 PWD SR 2024-25) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
172.26
114
19678.9824