Public Works Department Tender
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.
Costs
EMD
₹ 16,17,000Document Cost
Refer DocumentsTender Fee
₹ 7,500
Summary
Package 712(call-2) A) Improvements To Road Attigere To Mathi Mdr From Km 8.25 To Km 10.30 & Km 11.00 To Km 14.50 (in Selected Reaches) Via Lokikere
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
PWD/2024-25/RD/WORK_INDENT17261Tender No
PWD/2024-25/RD/WORK_INDENT17261Tender Authority
Public Works Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Others - Corrigendum to tender notification
BOQ Items
... More
item code 1.7 - Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. Schedule of Rates PWD 202324 vol 1, Item No 1.7 , Page No 7 ---- Including cost and conveyance of all materials labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc complete as directed as per the specification
2812.91
119
334736.29
... More
item code 1.8 - Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. Schedule of Rates PWD 2023 24 vol 1 Item No 1.8 Page No 7 ---- Including cost and conveyance of all materials labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc complete as directed as per the specification
4980
474
2360520
... More
item code 3.6 - Construction of subgrade and earthen shoulders with approved material CBR min 10 obtained from bperrow pits with all lifts and leads, transpperting to site, spreading, grading to required slope and compacted to meet requirement of table No. 3002 Schedule of Rates PWD 202324 vol 3, Item No 3.6 , Page No 17 ---- Including cost and conveyance of all materials labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc complete as directed as per the specification
6156.36
493
3035085.48
... More
item code 4.2 v - By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desireddensity,complete as per clause 401 For Grading V Material Schedule PWD 2023-24 vol 3, Item No 4.2-v Page No 23 ---- Including cost and conveyance of all materials labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc complete as directed as per the specification
3797.55
2359
8958420.45
... More
item code 4.17 - Providing laying spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site laying in uniform layers with paver/ grader in sub base per base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Schedule of Rates PWD 2023 24 vol 3 Item No 4.17 Page No 26 ---- Including cost and conveyance of all materials labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc complete as directed as per the specification
4746.16
2559
12145423.44
... More
item code 5.1A I - Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. Schedule of Rates PWD 2023 24 vol 3 Item No 5.1 A I Page No 31 ---- Including cost and conveyance of all materials labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc complete as directed as per the specification
18679.32
41
765852.12
... More
item code 5.4 - Providing and applying tack coat with RS1 Bituminous Emulsionusing emulsion pressure distributor at the rate of 0.25 kgperm2 on Granular surface Schedule of Rates PWD 2023 24 vol 3 Item No 5.4 Page No 31 ---- Including cost and conveyance of all materials labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc complete as directed as per the specification
18679.32
14
261510.48
... More
item code 5.12 C - Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading premixed with bituminous binder VG 30 at 4.5 per centby weight of total mix and filler transporting the hot mix to work site laying with mechanical paver finisher to the required grade level and alignment rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Schedule of Rates PWD 2023 24 vol 3 Item No 5.12C Page No 35 ---- Including cost and conveyance of all materials labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc complete as directed as per the specification
933.97
9449
8825082.53
... More
item code 5.16C - Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG 30 at 5.4 per centof mix and filler transporting the hot mix to work site laying with mechanical paver finisher to the required grade level and alignment rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Schedule of Rates PWD 2023 24 vol 3 Item No 5.16C Page No 38 ---- Including cost and conveyance of all materials labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc complete as directed as per the specification
560.37
10954
6138292.98
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements