Public Works Department Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Public Works Department - PWD Tender

Works
Civil And Construction
Building Construction
Opening Date30 Dec 2024
Closing Date7 Jan 2025
Tender Amount₹ 1,58,59,563.16 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

  • Tender Id

    PWD/2024-25/BD/WORK_INDENT15704
  • Tender No

    PWD/2024-25/BD/WORK_INDENT15704
  • Tender Authority

    Public Works Department View
  • Purchaser Address

    -
Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2023-24 Common SR, Vol-1, P.No. 112, Sl.No. 14 - Formwork, Centering Scaffolding 60 Percent For Beams Lintel (Basic Rate 4105.80, Lift Charges 1 Percent 41.06, Finished rate 4146.86) (2023-24 Common SR, Vol-1, P.No. 112, Sl.No.14) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

41.12

4146

170518.8832

... More
2023-24 Common SR, Vol-1, P.No. 16, I.No. 2.5.2 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Roof Slab (Basic Rate 6843.00, Lift Charges 1 Percent 68.43, Finished rate : 6911.43) (2023-24 Common SR, Vol-1, P.No. 16, I.No. 2.5.2) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

68.98

6911

476750.4414

... More
2023-24 Common SR, Vol-1, P.No. 112, Sl.No. 15 - Formwork, Centering & Scaffloding 50Percent For Roof Slab (Basic Rate 3421.50, Lift Charges 1 Percent 34.22, Finished rate : 3455.72) (2023-24 Common SR, Vol-1, P.No. 112, Sl.No. 15) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

68.98

3455

238375.5656

... More
2023-24 Common SR, Vol-1, P.No. 16, I.No. 2.5.2 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Staircase (Basic Rate 6843.00, Lift Charges 1 Percent 68.43, Finished rate : 6911.43) (2023-24 Common SR, Vol-1, P.No. 16, I.No. 2.5.2) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

3.86

6911

26678.1198

... More
2023-24 Common SR, Vol-1, P.No. 112, Sl.No. 16 - Formwork, Centering & Scaffloding 50Percent For Staircase (Basic Rate 3421.50, Lift Charges 1 Percent 34.22, Finished rate : 3455.72) (2023-24 Common SR, Vol-1, P.No. 112, Sl.No. 16) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

3.86

3455

13339.0792

... More
2023-24 Common SR Vol1, P.No. 15, I.No. 2.1.6 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates. Sill (Common SR 2023-24, Vol1, P.No. 15, I.No. 2.1.6) Basic Rate 6243.00, Lift Charges 1Percent 62.43, Finished Rate : 6305.43) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

3.59

6305

22636.4937

... More
2023-24 Common SR, Vol-1, P.No. 112, Sl.No. 14 - Formwork, Centering & Scaffolding 3Percent For Sill (Basic Rate 187.29, Lift Charges 1 Percent 1.87, Finished rate : 189.16) (2023-24 Common SR, Vol-1, P.No. 112, Sl.No. 14) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

3.59

189

679.0844

... More
2023-24 Common SR, Vol-1, P.No. 16, I.No. 2.5.2 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Chejja (Basic Rate 6843.00, Lift Charges 1 Percent 68.43, Finished rate : 6911.43) (2023-24 Common SR, Vol-1, P.No. 16, I.No. 2.5.2) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

1.75

6911

12095.0025

... More
2023-24 Common SR, Vol-1, P.No. 112, Sl.No. 19 - Formwork, Centering & Scaffloding 45Percent For Chejja (Basic Rate 3079.35, Lift Charges 1 Percent 30.79, Finished rate : 3110.14) (2023-24 Common SR, Vol-1, P.No. 112, Sl.No. 19) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

1.75

3110

5442.745

... More
2023-24 Common SR, Vol-1, P.No. 18, I.No. 2.11.a - Steel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings (Basic Rate 89457.00, Lift Charges 1 Percent 894.57, Finished rate : 90351.57) (2023-24 Common SR, Vol-1, P.No. 18, I.No. 2.11.a) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

19.35

90351

1748302.8795

... More
2023-24 Common SR, Vol-2, P.No. 44, I.No. 8.16a - Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications. (Basic Rate 1238.00, Lift Charges 1 Percent 12.38, Finished rate : 1250.38) (2023-24 Common SR, Vol-2, P.No. 44, I.No. 8.16a) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

36.39

1250

45501.3282

... More
2023-24 Common SR, Vol-2, P.No. 14, I.No. 6.8 - Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (Basic Rate 7969.00, Lift Charges 1 Percent 79.69, Finished rate : 8048.69) (2023-24 Common SR, Vol-2, P.No. 14, I.No. 6.8) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

117.01

8048

941777.2169

... More
2023-24 Common SR, Vol-2, P.No. 14, I.No. 6.15 - Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (Basic Rate 1033.00, Lift Charges 1 Percent 10.33, Finished rate : 1043.33) (2023-24 Common SR, Vol-2, P.No. 14, I.No. 6.15) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

38.55

1043

40220.3715

... More
2023-24 Common SR, Vol-2, P.No. 100, I.No. 12.13.1 - Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications (Basic Rate 98815.00, Lift Charges 1 Percent 988.15, Finished rate : 99803.15) (2023-24 Common SR, Vol-2, P.No. 100, I.No. 12.13.1) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

1.07

99803

106789.3705

... More
2023-24 Common SR, Vol-2, P.No. 104, I.No. 12.51 - Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. (Basic Rate 1016.00, Lift Charges 1 Percent 10.16, Finished rate : 1026.16) (2023-24 Common SR, Vol-2, P.No. 104, I.No. 12.51) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

6

1026

6156.96

... More
2023-24 Common SR, Vol-2, P.No. 69, I.No. 10.6.3 - Providing and fixing expansion hold fasteners on C.C. /R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete Fastener with threaded dia 12 mm (Basic Rate 60.00, Lift Charges 1 Percent 0.60, Finished rate : 60.60) (2023-24 Common SR, Vol-2, P.No. 69, I.No. 10.6.3) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

36

60

2181.6

... More
Common SR 2023-24, Vol2, P.No. 105, I.No. 12.57.5 - Providing and fixing 35 mm thick one side teak and one side commercial flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per specification (Common SR 2023-24, Vol2, P.No. 105, I.No. 12.57.5) Basic Rate 3897.00, Lift Charges 1Percent 38.97, Finished Rate : 3935.97) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

17.5

3935

68879.475

... More
2023-24 Common SR, Vol2, P.No. 111, I.No. 12.93.1 - Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately) Size 62 x 100mm (Common SR 2023-24, Vol2, P.No. 111, I.No. 12.93.1) Basic Rate 702.00, Lift Charges 1Percent 7.02, Finished Rate : 709.02) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

25.5

709

18080.01

... More
2023-24 Common SR, Vol2, P.No. 111, I.No. 12.94.1 - Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg/m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of bing termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately) (Common SR 2023-24, Vol2, P.No. 111, I.No. 12.94.1) Basic Rate 3485.00, Lift Charges 1Percent 34.85, Finished Rate : 3519.85) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

9.45

3519

33262.5825

... More
2023-24 Common SR, Vol-2, P.No. 110, I.No. 12.90 - Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) (Basic Rate 6734.00, Lift Charges 1 Percent 67.34, Finished rate : 6801.34) (2023-24 Common SR, Vol-2, P.No. 110, I.No. 12.90) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

41.58

6801

282799.7172

... More
2023-24 Common SR, Vol-2, P.No. 109, I.No. 12.85 - Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (Basic Rate 5719.00, Lift Charges 1 Percent 57.19, Finished rate : 5776.19) (2023-24 Common SR, Vol-2, P.No. 109, I.No. 12.85) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

5.28

5776

30498.2832

... More
2023-24 Common SR, Vol-2, P.No. 86, I.No. 11.34b - Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. (Basic Rate 183.00, Lift Charges 1 Percent 1.83, Finished rate : 184.83) (2023-24 Common SR, Vol-2, P.No. 86, I.No. 11.34b) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

984.06

184

181883.8098

... More
2023-24 Common SR, Vol-2, P.No. 41, I.No. 8.1.2 - Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Basic Rate 241.00, Lift Charges 1 Percent 2.41, Finished rate : 243.41) (2023-24 Common SR, Vol-2, P.No. 41, I.No. 8.1.2) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

747.32

243

181905.1612

... More
2023-24 Common SR, Vol-2, P.No. 50, I.No. 8.51 - Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (Basic Rate 100.00, Lift Charges 1 Percent 1.00, Finished rate : 101.00) (2023-24 Common SR, Vol-2, P.No. 50, I.No. 8.51) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

1450.89

101

146539.89

... More
2023-24 Common SR, Vol-2, P.No. 41, I.No. 8.2.2 - Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Out side) (Basic Rate 279.00, Lift Charges 1 Percent 2.79, Finished rate : 281.79) (2023-24 Common SR, Vol-2, P.No. 41, I.No. 8.2.2) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

656.36

281

184955.6844

... More
2023-24 Common SR, Vol-2, P.No. 60, I.No. 9.12.2 - Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm (Basic Rate 1145.00, Lift Charges 1 Percent 11.45, Finished rate : 1156.45) (2023-24 Common SR, Vol-2, P.No. 60, I.No. 9.12.2) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

301.69

1156

348889.4005

... More
2023-24 Common SR, Vol2, P.No. 64, I.No. 9.31 - Providing and laying Polished Sadarahalli Grey Granite stone flooring inrequired design and patterns, in linear as well as curvilinear portions ofthe building all complete as per the architectural drawings with 20 mmthick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1cement : 4 coarse sand) laid and jointed with cement slurry and pointingwith white cement slurry admixed with pigment of matching shadeincluding rubbing , curing and polishing etc. all complete as specified andas directed by the Engineer-in-Charge. (Common SR 2023-24, Vol2, P.No. 64, I.No. 9.31) Basic Rate 2085.00, Lift Charges 1Percent 20.85, Finished Rate : 2105.85) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

170.65

2105

359363.3025

... More
2023-24 Common SR, Vol-2, P.No. 69, I.No. 10.1.2 - Providing and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch up, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. (Basic Rate 3937.00, Lift Charges 1 Percent 39.37, Finished rate : 3976.37) (2023-24 Common SR, Vol-2, P.No. 69, I.No. 10.1.2) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

2.88

3976

11451.9456

... More
Common SR 2023-24, Vol2, P.No. 149, I.No. 15.4 - Providing and laying water proofing treatment to the Retaining wall area with PU Elastomeric Single component liquid applied, cold applied, moisture cured high tensile elastomeric PU waterproofing membrane having elongation of more than 400% and having solid content of above 90% @ 1.6kg/m2 in 2 coats to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2. The cost is inclusive of surface preparation, crack filling, repair of loose mortar etc. completely as per specification (Common SR 2023-24, Vol2, P.No. 149, I.No. 15.4) Basic Rate 888.00, Lift Charges 1Percent 8.88, Finished Rate : 896.88) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

64.8

896

58117.824

... More
2023-24 Common SR, Vol-2, P.No. 60, I.No. 9.11 - Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/m2 including pointing the joints with white cement and matching pigments etc., complete. (Basic Rate 889.00, Lift Charges 1 Percent 8.89, Finished rate : 897.89) (2023-24 Common SR, Vol-2, P.No. 60, I.No. 9.11) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

51.84

897

46546.6176

... More
2023-24 Common SR, Vol-2, P.No. 71, I.No. 10.14 - Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados,over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. (Basic Rate 1106.00, Lift Charges 1 Percent 11.06, Finished rate : 1117.06) (2023-24 Common SR, Vol-2, P.No. 71, I.No. 10.14) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

131.37

1117

146748.1722

... More
2023-24 Common SR, Vol-2, P.No. 85, I.No. 11.28 - Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessoris such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (Basic Rate 565.00, Lift Charges 1 Percent 5.65, Finished rate : 570.65) (2023-24 Common SR, Vol-2, P.No. 85, I.No. 11.28) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

296.04

570

168935.226

... More
2023-24 Common SR, Vol 2, P.No. 46, I.No. 8.33.1 - Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls at 1.25 ltr/10 m² over and including one coat of Special primer applied at 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Basic Rate 158.00, Lift Charges 1 Percent 1.58, Finished rate : 159.58) (2023-24 Common SR, Vol 2, P.No. 46, I.No. 8.33.1) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

1450.89

159

231533.0262

... More
2023-24 Common SR, Vol 2, P.No. 46, I.No. 8.31 - Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives with pure Acrylic Resin, UV resistant, dirt & pick up resistant, Alkali & Water resistant of required shade: New work (Two coats applied @ 1.43 L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Basic Rate 178.00, Lift Charges 1 Percent 1.78, Finished rate : 179.78)(2023-24 Common SR, Vol 2, P.No. 46, I.No. 8.31) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

656.36

179

118000.4008

... More
Common SR 2023-24, Vol2, P.No. 48, I.No. 8.40 - Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Common SR 2023-24, Vol2, P.No. 48, I.No. 8.40) Basic Rate 115.00, Lift Charges 1Percent 1.15, Finished Rate : 116.15) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

46.86

116

5442.789

... More
Common SR 2023-24, Vol2, P.No. 43, I.No. 8.16.2 - Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. (length of mesh only be measured for payment). Plaster mesh 150mm wide (Common SR 2023-24, Vol2, P.No. 43, I.No. 8.16.2) Basic Rate 38.00, Lift Charges 1Percent 0.38, Finished Rate : 38.38) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

1293

38

49625.34

... More
2023-24 Common SR, Vol 2, P.No. 55, I.No. 8.84 - Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete. (Basic Rate 475.00, Lift Charges 1 Percent 4.75, Finished rate : 479.75) (2023-24 Common SR, Vol 2, P.No. 55, I.No. 8.84) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

18

479

8635.5

... More
Common SR 2023-24, Vol2, P.No. 187, I.No. 19.7.3 - Demolishing brick work manually /by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge. In cement mortar (Common SR 2023-24, Vol2, P.No. 187, I.No. 19.7.3) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

28.44

1029

29264.76

... More
Common SR 2023-24, Vol2, P.No. 187, I.No. 19.3 - Demolishing R.C.C. work manually /by mechanical means including stacking of steel bars and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge. (Common SR 2023-24, Vol2, P.No. 187, I.No. 19.3) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

5.04

2426

12227.04

... More
Common SR 2023-24, Vol2, P.No. 219,.No. 22.15.8 - Providing and fixing stainless steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS hinges 125 mm (Common SR 2023-24, Vol2, P.No. 219,.No. 22.15.8) Basic Rate 50.00, Lift Charges 1Percent 0.50, Finished Rate 50.50) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

45

50

2272.5

... More
Common SR 2023-24, Vol2, P.No. 219,.No. 22.15.7 - Providing and fixing stainless steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Tower Bolts 250x10mm (Common SR 2023-24, Vol2, P.No. 219,.No. 22.15.7) Basic Rate 200.00, Lift Charges 1Percent 2.00, Finished Rate 202.00) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

30

202

6060

... More
Common SR 2023-24, Vol2, P.No. 219,.No. 22.15.10 - Providing and fixing stainless steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Door stopper 75mm (Common SR 2023-24, Vol2, P.No. 219,.No. 22.15.10) Basic Rate 100.00, Lift Charges 1Percent 1.00, Finished Rate 101.00) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

15

101

1515

... More
Common SR 2023-24, Vol2, P.No. 218,.No. 22.15.2 - Providing and fixing stainless steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Handles 300mm (Common SR 2023-24, Vol2, P.No. 218,.No. 22.15.2) Basic Rate 550.00, Lift Charges 1Percent 5.50, Finished Rate 555.50) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

30

555

16665

... More
2023-24 Common SR, Vol2, P.No. 23, I.No. 7.18 - Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. (Common SR 2023-24, Vol2, P.No. 23, I.No. 7.18) Basic Rate 2017.00, Lift Charges 1Percent 20.17, Finished Rate : 2037.17) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work

15.32

2037

31209.4444



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.