Minor Irrigation Department Tender

... More
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Minor Irrigation Department Tender

Civil And Construction
Water Storage And Supply
Opening Date7 Jan 2022
Closing Date14 Jan 2022
Tender Amount₹ 53,53,198 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Re-constructing the cut open bund portion, for forming temperary diversion channel, using soil obtained from bund cutting in layers of 150 to 200 mm thickness before compaction including cost of all labour, materials, machinery, all operations such as sorting out, spreading in layers of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 95 percent or as directed using mechanical tampers or by manual labour etc.Complete all leads and lifts as per direction of engineer incharge of work,

480

-

212544

... More
Excavation in all kinds of soil including boulders upto 0.6 m j diameter (0.113 cum) for canal, seating of embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the _ excavated soil neatly in dump area or for formation of service road/ embankment as directed etc. Complete all leads and lifts as per direction of engineer incharge of work,

2341.8

-

217506.38

... More
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending,hooking, lapping, welding wherever required, tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery,labour etc.Complete all leads and lifts as per direction of engineer incharge of work,

2016

-

151280.64

... More
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 10 N / sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing,placing in position, levelling, vibrating, finishing, curing etc.Complete all leads and lifts as per direction of engineer incharge of work,

9

-

52126.92

... More
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for Sub structure works including cost of all materials, machinery, labour,formwork, cleaning, batching, mixing, placing in position, levelling,vibrating, finishing, curing etc.Complete all leads and lifts as per direction of engineer incharge of work,

134.46

-

962475.44

... More
Removing and resetting disturbed dry rubble / size stone pitching 250 to 450 mm thick including packing, wedging, finishing etc.Complete all leads and lifts as per direction of engineer incharge of work,

120

-

9201.6

... More
Providing and constructing 300 mm thick dry rubble stone pitching/ revetment with pin headers at 2 per sqm including cost of all materials, labour, handpacking, finishing etc.Complete all leads and lifts as per direction of engineer incharge of work,

3060

-

905515.2

... More
Providing pervious / semi-pervious casing for breached / damaged portion of embankment with soil from approved borrow areas in layers of 100 to 150 mm before compaction including cost of all materials, machinery, labour, all operations such as collection of soil, sorting out, spreading soil to specified thickness,breaking clods, sectioning, watering, compacting each layer to density control of not less than 95 percent or as stipulated by rolling or by using pneumatic / vibrating plate compactors etc.Complete all leads and lifts as per direction of engineer incharge of work,

3289.5

-

813559.14

... More
De-silting tank bed/ Feeder channel in dry condition by excavating the deposited bed material and disposing off the same as directed including cost of allmachinery, labour etc.Complete all leads and lifts as per direction of engineer incharge of work,

720

-

33436.8

... More
CONSTRUCTION OF CD,Clearing thin jungle growth ( less than 50 percent open space ) including bushes upto 300 mm / parthenium and other weeds including burning or disposing Complete all leads and lifts as per direction of engineer incharge of work,

600

-

1230

... More
Excavation for foundation in all kinds of soil by mechanical means including boulders upto 0.60mtr dia (0.113 cum) for dam,spillway,intake structure,surface power house and other appurtenent works and placing the excavated soil neatly in dump area or disposing of the same as directed etc.Complete all leads and lifts as per direction of engineer incharge of work,

58.72

-

5517.33

... More
Excavation for foundation in soft rock without blasting including boulders upto 0.60mtr dia (0.113 cum) for dam,spillway,intake structure,surface power house and other appurtenent works and placing the excavated soil neatly in dump area or disposing of the same as directed etc.Complete all leads and lifts as per direction of engineer incharge of work,

19.58

-

2368.4

... More
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating,finishing, curing etc., complete for RCC works of gallery, sluice,spillway crest, spillway d / s face, energy dissipating structure, training walls, piers, abutments ,Complete all leads and lifts as per direction of engineer incharge of work,

65.92

-

391526.57

... More
Providing and laying insitu vibrated M- 25 (28ays cube compressive strength not less than 20N/sqm) grade cement concrete using 20mm down size approved,clean hard graded aggregates for deck slab and kerb including cost of all materials machinery labour formwork centering scaffolding cleaning batching mixing placing in position levelling vibrating finishing curing etc,Complete all leads and lifts as per direction of engineer incharge of work,

47.81

-

471101.09

... More
Providing and laying insitu M- 25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc.Complete all leads and lifts as per direction of engineer incharge of work,

3.94

-

25878.35

... More
Providing and fabricating and placing in position reinforcement steel for RCC structures including cleaning, straightening, cutting, bending, lapping/welding joints wherever required, tying with 1.25mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc.Complete all leads and lifts as per direction of engineer incharge of work,

9.1

-

674355.14

... More
Providing and fixing in position 20mm thick 150mm depth tarfelt expansion joint fillar boards for cement concrete lining of canal including cost of all materials,labour etc.Complete all leads and lifts as per direction of engineer incharge of work,

7.5

-

891

... More
Providing and constructing 75mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc.Complete all leads and lifts as per direction of engineer incharge of work,

60

-

19180.8

... More
Providing rubble / boulder and sand filling behind abutment and return walls in layers including cost of all materials, machinery, labour,watering, ramming etc.Complete all leads and lifts as per direction of engineer incharge of work,

60

-

94284



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.