Ministry Of Road Transport And Highways Tender
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.
Ministry Of Road Transport And Highways - MORTH Tender
Civil And Construction
Road Construction
Eprocure
Opening Date21 Sep 2024
Closing Date10 Oct 2024
Tender Amount₹ 4,85,10,000
Costs
EMD
₹ 7,28,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
State Highway From Sh 74 Near Nandi Village To Join Andra Border Sh Road Via Vijayapur Shidlagatta Dibborahali E.thimmasandra Palyakere And Chelur Road
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MoRTH_827134_1Bid Award Id
ViewTender No
NIT-5/2024-25 Dated 06.09.2024Tender Authority
Ministry Of Road Transport And Highways ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material, including all labour, material, usage charges of machinery, lead, lifts, loading, unloading transporting etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.
1944
-
-
... More
Case I Compacting original ground supporting sub grade Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for sub grade construction including all lead, lift, loading, unloading all labour, usage charges of all machinery etc., complete. and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.
1944
-
-
... More
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 laid in layers not exceeding 250 mm thick and compacting it by mechanical means after adding water to its OMC, so as to achieve 97% compaction of maximum dry density and finish the surface to the required camber, grade and cross section etc., speading, grading by motor grador, consolidation by roller including all lead, lifts, loading, unloading, all labour, usage charges of machinery etc., complete. (New road formation) and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.
4972.6
-
-
... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 including protection of edges of GSB layer, cost of all materials, labour, usage charges of all machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading all lead, lifts etc., complete with lead of mixed material (Compacted thickness 100-150mm ) Grading II Material (Close graded)and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.As per job mix.
3693.63
-
-
... More
Providing, laying, spreading and compacting graded stone aggregate as per table 400-12 & 400-13, to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density of 98% including protection of edges of WMM layer, cost of all materials, labour, usage charges of all machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading all lead, lifts etc., complete, with lead of mixed material (Compacted thickness 250mm). (B) Laying using grader and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.As per job mix.
5494.06
-
-
... More
Providing and applying primer coat with SS1 bitumen emulsion complying IS-8887 on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. as per table-500-3, including cost of all materials, labour, usage charges of all machinery, loading & unloading etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.As per job mix.
21976.25
-
-
... More
Providing and applying tack coat with bitumen emulsion (RS1) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surface cleaned with mechanical broom & dusting by air compressor and spraying including cost of all materials, labour, usage charges of all machinery, loading & unloading etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.As per job mix.
21976.25
-
-
... More
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates as per table 500-7 of specified grading premixed with bituminous binder VG-30 paving bitumen as per clause 504.3.1 complying with IS-73-2013 of specified grading, premixed with bituminous binder at 4.5 percent by weight of total mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects including cost of all materials all labour, usage charges of all machinery all lead, lifts, loading, unloading stacking transporting etc., complete, tack coat.50mm compacted thickness. complete and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.As per job mix.
NOTE: Protection of Dense Graded Bituminous Macadam layer is as per Clause 504.5 of MoRT&H specfification for roads and Bridge work Vth revision.
1098.81
-
-
... More
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates as per table 500-7 of specified grading premixed with bituminous binder VG-30 grade paving bitumen as per clause 504.3.1 complying with IS-73-2013 of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler @2% by weight of agregate, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects including cost of all materials all labour, usage charges of all machinery all lead, lifts, loading, unloading stacking transporting etc., complete, tack coat 30 mm compacted thickness and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.As per job mix.
659.29
-
-
... More
Removing all type of Hume Pipes and Stacking, including Earthwork and Dismantling of Masonry Works complete.and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.
22.5
-
-
... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead including all labour, usage charges of all machinery etc., complete. Removing all type of Hume Pipes and Stacking within including Earthwork and Dismantling of Masonry Works. and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.
14.51
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material, including all labour, material, usage charges of machinery, lead, lifts, loading, unloading transporting etc., complete and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.
468.85
-
-
... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including formwork, curing, cost of all labour, materials, usage charges of machinery, lead, lifts, loading, unloading, transportation stacking charges, finished exposed faces etc., complete. and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.As per job mix.
30.93
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. including formwork, centering, vibrating, compacting, cost of all labour, materials, usage charges of machinery, curing, lead, lifts, loading, unloading, transportation stacking finishing the exposed faces neatly, etc., complete. with all lead (excluding cost steel & fabrication charges) RCC Grade M25 using batching plant transit mixer & manual placing and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.As per job mix.
83.03
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. including formwork, centering, vibrating, compacting, cost of all labour, materials, usage charges of machinery, curing, lead, lifts, loading, unloading, transportation stacking finishing the exposed faces neatly, etc., complete. with all lead RCC Grade M30 using batching plant transit mixer & manual placing and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.As per job mix.
24.92
-
-
... More
Supplying, fitting and placing un-coated TMT Fe 500 grade bar reinforcement in Foundation complete as per Drawing and Technical Specification including straightening bar, cutting, bending, hooking, binding with approved quality of binding wire, after placing in position, tying, lapping and/or welding whereever required (wastages for laps, hooks shall not be measured & paid) including cost of all material, fabrication charges, labour, material, usage charges of machinery lead, lifts, loading, unloading, transporting, stacking neatly, etc., and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.
9.13
-
-
... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition, including cost of all labour, material, usage charges of machinery, lead, lifts, loading, unloading, transporting,, etc., complete. and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.
49.61
-
-
... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, 110 mm dia at 4 kg/sqcm fixing with glue extending through the full width of the structure with slope of 1V :20H towards drawing foce, including cost of all materials curing all labour, material, usage charges of machinery, lead, lifts, loading, unloading, transporting, etc., complete. as per drawing and Technical Specifications and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.
48
-
-
... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes, including, barricading, traffic diversion as per IRC-35, cleaning the surface of dirt, dust and other foriegn matter, demarcation at site, traffic control,cost of all materials all labour, lead, lifts, loading, unloading transporting etc., complete. and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.
993.3
-
-
... More
Supplying of Solar Raised Pavement Markers made of polycarbonate molded body with circular shape, solar powered,LED self illumination in active mode, 360 degree illumination and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face in passive mode. The marker shall support a load of 20000 kg tested in accordance to ASTM D 4280. The marker should be resistant to dust and water ingress according to IP 65 standards and should withstand temperatures in the range of 0 C to 70 C. Color of lighting could be provided in red or yellow (amber) as per requirement and typical frequency of blinking is 1 Hz. There should be current losses of less than 20 microamperes at 2.4 V in sleepcharging mode to enhance the life of the marker and a full charge should provide for a minimum autonomy of 50 hours. The height, width and length of the marker shall not be less than 10 mm x 100 mm x 100 mm. Also, the surface diameter of the marker shall not be less than 100 mm respectively. The weight of the marker shall not exceed 0.5 Kilograms. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive and complete as directed by the engineer, including cost of all materials all labour, lead, lifts, loading, unloading transporting etc., complete. and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.
1126
-
-
... More
Providing and erecting direction and place identification retro-reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminum composite material sheet with overall thickness of 4mm with area not exceeding 0.9 sqm fixed over back support frame of min 35 x 35 x 3mm Angle mounted on a mild steel circular pipe 65 NB 3.20 mm thick, 3.60mtrs hight, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing, including curing, cost of all materials all labour, lead, lifts, loading, unloading transporting etc., complete. Direction and place identification retro-reflectorised signs up to 0.9Sqm Size Board. and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.
10.8
-
-
... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of Class-B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 4mm thick Aluminium composite material sheet including lettering depending on the size of the sign fixed over back support frame of min 25 x 25 x 3mm Angle mounted on a mild steel circular pipe 65 NB 3.60mtrs high (min effective height 1.30 mtrs), 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. The sign shall be maintained as per section 12 of IRC 67, as per clauses including curing, cost of all materials all labour, lead, lifts, loading, unloading transporting etc., and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges. Cautionary Boards 90 cm equilateral triangle
12
-
-
... More
Hazard Boards 60 cm x 45 cm rectangular
12
-
-
... More
Mandatory Boards 60 cm Circular
12
-
-
... More
Providing and erecting Project Display Board of size 1.80 verticalx1.60M Horizontal made of Cold Rolled Coil Sheet 16 Guage (1.6mm thickness) sheeting sthrenghtened by welding to MS angle of size 35x35x5mm iron framework on all sides, extra cross vertical angle fixed using nuts and bolts, base of the board shall be cleaned, applying red oxide and black paint by sprayer on both sides of the board and all MS iron frameworks, background of the facing side of the board painted in traffic yellow, project information written in English/Kannada/Hindi, painting letters and numerals in black, fixed on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level and the board 2.8M from ground level as per approved drawing including cost of all materials all labour, lead, lifts, loading, unloading transporting etc., complete. and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.
2
-
-
... More
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces, including cost of all materials all labour, lead, lifts, loading, unloading transporting etc., complete.Painting two coats on new plastered concrete surfaces and as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges.
123.84
-
-