Ministry Of Road Transport And Highways Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Ministry Of Road Transport And Highways - MORTH Tender

Works
Eprocure
Opening Date8 Jan 2019
Closing Date25 Jan 2019
Tender Amount₹ 33,53,72,332 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork excavation for roadwork in soil by mechanical means with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location, including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Main Road : 16254 (1) Link Road - 363 (2) Link Road - 1602 (3) Link Road - 3468 (4) Link Road - 5397 (5) Link Road - 2178 (6) Link Road - 1998 (7) Link Road - 6200.76

37460.76

-

38.95

... More
Compaction of original ground with maximum of 6 passes of 8 to 10 tonnes power roller including filling in depression occuring during rolling including cost of all labour, HOM of machinery complete as per specifications. MORTH/ Chapter -3 including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Main Road : 46632.67 (1) Link Road - 605 (2) Link Road - 4110 (3) Link Road - 9540 (4) Link Road - 9230 (5) Link Road - 3630

73747.67

-

4.5

... More
Construction of Granular sub-base by providing laying, spreading and compacting of close graded Material , mixing in a Wet mix plant of 75 tonne capacity at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller 8-10 tonne to achieve the desired density of 98% including protection of edges of GSB layer, cost of all materials, labour, hire charges of machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading, (Compacted Thickness) and including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Main Road :6930 (1) Link Road - 121 (2) Link Road - 822 (3) Link Road - 1182 (4) Link Road - 1846 (5) Link Road - 726 (6) Link Road - 1044 (7) Link Road - 2052.06

14723.06

-

1678

... More
Providing and Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate 25 mm & 12.5 mm Granite/Basalt/Trap metal & clean seived approved sand, after blending to be as per table 600-1, cement content at 150 kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, loading materials to batch mix plant by F.E. Loader, mixed in a batching plant at 75 Cum/hr transported to site in tipper to paver, laid with paver finisher with electronic sensor, to the required grade, level and alignment, compacting with 8-10 tonnes vibratory roller, finishing and curing including cost of all materials, labour, lead and lift, hire charges of machineries etc., complete.(Compacted thickness) including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Main Road :4923.45 (1) Link Road - 90.75 (2) Link Road - 616.50 (3) Link Road - 886.50 (4) Link Road - 1384.50 (5) Link Road - 544.50

8446.2

-

3339

... More
Providing and Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, coarse aggregate 25 mm & 12.5 mm Granite/Basalt/Trap metal & clean seived approved sand,. loading materials to batch mix plant by F.E. Loader, mixed in a cement conrete batch mix plant 175 Cum/hour as per approved mix design, transported to site in transit truck agitator 5 Cum capacity, laid with a slip form paver with electronic sensor, compacted and finished in a continuous operation including provision of contraction,expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures curing compound as approved, finishing to the required grade, level and alignment, textured with texturing machine, finishing and curing including cost of all materials, labour, lead and lift, hire charges of machineries etc., complete witha (Compacted thickness) and as per the directions of Engineer-in-charge of work including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Main Road : 7875 (1) Link Road - 151.25 (2) Link Road - 1027.50 (3) Link Road - 1477.50 (4) Link Road - 2018.75 (5) Link Road - 907.50

13457.5

-

7940.01

... More
Providing and laying in position interlocking paver blocks 75 mm thick using cement and coarse sand for manufacturing of blocks of approved size, shape and colour with a minimum compressive strength of 281 kgs/sqm over 50 mm thick sand bed and compacting with plate vibrator having 3 ton compacting coarse. including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Link Road - 3

270

-

763

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work including all lead, lifts, labour etc., complete. Mechanical Means using Hydraulic excavator including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Main Road-31388.77 (1) Link Road-412.50

31801.27

-

37.27

... More
Providing & laying Plain / Reinforced Cement Concrete M 15 in Open foundation using granite/trap/basalt aggregates using 20mm and downsize and clean sieved approved sand including mixing mechanically in Concrete Mixer laid in layers not exceeding 15cms thick layers, as per Drawing including cost of all materials, formwork, centring, vibrating , compacting, hire charges of machinery, lead, lift, loading, unloading, transporting, stacking, curing, finishing the exposed faces etc., complete including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Main Road-680.45 (1) Link Road-54.45

734.9

-

5469

... More
Providing & laying Plain / Reinforced Cement Concrete M 20 in substructure for Drain Bottom Slab & Side Walls using granite/trap/basalt aggregates using 20mm and downsize and clean sieved approved sand including mixing mechanically in Concrete Mixer laid in layers not exceeding 15cms thick layers, as per Drawing including cost of all materials, formwork, centring, vibrating , compacting, hire charges of machinery, lead, lift, loading, unloading, transporting, stacking, curing, finishing the exposed faces etc., complete including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Main Road : 731.40 (1) Link Road - 112.20 (2) Link Road - 28.56 (3) Link Road - 172.80 (4) Link Road - 202.56 (5) Link Road - 93.84

1341.36

-

6399

... More
Providing & laying Reinforced Cement Concrete M 20 for Drain Cover Slab using granite / trap / basalt aggregates using 20mm and downsize and clean sieved approved sand including mixing mechanically in Concrete Mixer laid in layers not exceeding 15cms thick layers, as per Drawing including cost of all materials, formwork, centring, vibrating , compacting, hire charges of machinery, lead, lift, loading, unloading, transporting, stacking, curing, finishing the exposed faces etc., including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Main Road-358.800 (1) Link Road-24.75

383.55

-

6919

... More
Providing and Construction of Cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, using 20mm Granite/Basalt/Trap metal & clean seived approved sand, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 as per including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Main Road-8400.00 (1) Link Road-220.00

8620

-

607

... More
Providing T.M.T. Steel bar reinforcement conforming to FE-500 Grade designation as per table 1000-3 including straightening bars, cutting, bending, hooking, binding with approved quality binding wire after placing in position, tying, lapping and or welding wherever required and anchoring to the adjoining members wherever necessary as per drawing including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Main Road-66.308 (1) Link Road-7.72

74.02

-

56910

... More
Construction of footpath/Seperator by providing 150mm compacted granular sub base course graded material grading 1 as per clause 401 and 25mm thick cement concrete grade M15, overlaid with precast concrete tiles of size 300x300mm in C.M 1:3,including provisions of all drainage arrangements with 200mm dia RCC pipes but excluding kerb channel to propper lines, levels and dimensions as per drawing. i including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work

12307.2

-

763

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 - 2001 made of high intensity grade micro prismatic HIP type IV sheeting, fixed over aluminium sheeting, 2 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 3.50 mtrs long firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The item includes earthwork excavation, Cement Concrete M-15 grade, 2 coats of approved colour synthetic enamel painting to the steel surface, as per clauses, including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Main Road + Link Road 1 to 7

106

-

4945

... More
---- Do---- Main Road + Link Road 1 to 7

67

-

4540

... More
------Do----- Main Road + Link Road 1 to 7

59

-

6893

... More
Painting the road surface using approved quality Thermo Plastic material (homogneiously composed of aggregates, pigment, resings and glass reflcetorising beeds) confirming to Clause-803.4.2.2 applied hot either by screeding or extension process at the rate of 5kg/sqmtr of painted surface using suitable machine capable of controlled preparation and laying with surface applicator of glass beads at 250gms/sqmtr allowing cooling to ambient pavement temperatutre, that shall produce an adherent pavement marking of minimum specified thickness of 2.5mm including barricading for traffic diversion as per IRC:35 cleaning the surface of dirt, dust and other foreign matter, demarcation at site, barricading for traffic diversion, traffic control i including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Main Road :1991.300 (1) Link Road - 49.767 (2) Link Road - 163.100 (3) Link Road - 353.100 (4) Link Road - 381.100 (5) Link Road - 233.100 (6) Link Road - 313.100 (7) Link Road - 469.100

3953.67

-

726

... More
Providing and fixing Project Display Board of size 1.80 vertical x 1.60 mtrs. Horizontal made of cold rolled coil 16 Guage (1.6mm thickness) sheeting strenghtened by welding to MS angle of size 35x35x5mm iron framework on all sides, extra cross vertical angle fixed using nuts and bolts, base of the board shall be cleaned, applying red oxide and black paint by sprayer on both sides of the board and all MS iron framworks, background of the facing side of the board painted in traffic yellow, project information written in English / Kannada / Hindi, painting letters and numerals in black, fixed on a mild steel angle iron post 75 mm x 75 mm x 6 mm , 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 x 45x 60cm, 60cm below ground level and the board 2.8m from ground level as per approved drawing including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work

2

-

12323

... More
Providing and fixing of Road stud 100x 100 mm, die-cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973 including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Main Road :3318 (1) Link Road - 63 (2) Link Road - 187 (3) Link Road - 467 (4) Link Road - 387 (5) Link Road - 283 (6) Link Road - 219 (7) Link Road - 627

5551

-

405

... More
Providing & laying Plain / Reinforced Cement Concrete M 20 in substructure for Utility Duct using granite/trap/basalt aggregates using 20mm and downsize and clean sieved approved sand including mixing mechanically in Concrete Mixer laid in layers not exceeding 15cms thick layers, as per Drawing including cost of all materials, formwork, centring, vibrating , compacting, hire charges of machinery, lead, lift, loading, unloading, transporting, stacking, curing, finishing the exposed faces etc., including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Main Road :796.688 (1) Link Road - 20.40

817.09

-

6399

... More
Construction of Median and Island above road level with approved material deposited at site from roadway cutting and excavation for drain and foundation of other structures, spread, sloped, graded and compacted by plate compactor, including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work

1214.95

-

126

... More
Refilling pipeline trenches and foundation with selected available earth from trench excavation and foundation including watering, consolidation in layers of 15cm., thick including disposing off the surplus earth with including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work

6853.2

-

59

... More
Providing and laying reinforced cement concrete pipe NP4/NP3 Prestressed concrete Pipe for culverts culverts on first class bedding of granular maerial in single row, fixing Collar with CLean seived approved sand cement mortar 1:2 including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work

4200

-

11403

... More
Supplying S&S RCC spun pipes NP-3 class confirming to IS 458:1988 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials (excluding cost of specials) including perfect linking of joints with jack to correct position including cost of jointing materials i.e., rubber rings conforming to IS for S&S RCC Pipes with all lead and lifts and as directed and giving necessary hydualic test to the required pressure as per ISS and testing and commissioning (Contractor will make his own arrangements for procuring water for testing)300 mm. including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work

4200

-

2687

... More
Supplying HDPE pipes conforming to IS 4984:1995 with latest amendments and conveying to worksite including loading and unloading at both destination and rolling, lowering into trenches, laying true to line and jointing of pipes and specials including encasing the pipe around to a depth of not less than 15cms with soft gravel or selected earth available from the excavation etc.,Complete giving hydraulic test as per relevant ISS with all lead and lifts including testing and commisioning. The rate is exclusive of required specials & fittings etc., complete ( contractor will make his own arrangements for procuring water for testing)PE- 100, PN-6.0 class of outer dia 110 mm including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work

21000

-

362

... More
Manufacturing,providing,transporting,rolling,lowering,laying & Jointing,testing, commissioning of ERW(Electric Resistance Wilded)/SAW(Sub merged Arc Welded) MS pipe (Fe410 grade)conforming to IS 3589-2001 with latest amendments including perfect linking and welding of joints to correct position including cost and conveyance of pipe and materials with all lead and lift,cost of labour and giving satisfactory hydraauilic test as per IS 3589-2001 with latest amendments for test pressure and working pressure both as factory and site etc complete as per detailed specifications with inside CM 1:1.5 lining of minimum 10 mm thick upto 610mm OD & minimum 12mm thick beyond 610mm OD and outside minimum 25mm thick coating in CM 1:3 over 50x50 mm weld mesh of 13 gauge, including loading &unloading of pipe for the following diameters and specified thickness of plate as noted below,including bailing out of water wherever necessary.(Contractor will make his own arrangement for procuring water for testing) and including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work

4200

-

4546

... More
Providing and constructing of Manhole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15 Mtr.alround the chamber and brick masonry in CM.1:4 plaster with brick of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20mm thick ,with 1 to 6 slope in the concrete towards the central drain,finfshed smooth and fixing of pipes in CC 1:2:4 with graded metal of 20mm down size including supplying and fixing SFRC manhole frame and cover conforming to IS 12592(part-1):1988 & IS 12592(part-2):1991 with latest amendments in CC 1:2:4 suppling and fixing of plastic steps staggered at 30 cms apart as directed,watering,curing,barricading,danger lighting,pouring tar over M.H.frame and cover,cost of tar,shoring, strutting,dewatering,engraving Manhole No.on the inner conical surface etc.as per the drawing with all lead and lift for various diameters and depth noted below and including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work

140

-

38224.6

... More
Providing & laying Plain / Reinforced Cement Concrete M 25 for Superstructure using granite/trap/basalt aggregates using 20mm and downsize and clean sieved approved sand including mixing mechanically in Concrete Mixer laid in layers not exceeding 15cms thick layers, as per Drawing including cost of all materials, formwork, centring, vibrating , compacting, hire charges of machinery, lead, lift, loading, unloading, transporting, stacking, curing, finishing the exposed faces etc., including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work

334.85

-

5469

... More
Providing & laying Plain / Reinforced Cement Concrete M-20 for Superstructure using granite/trap/basalt aggregates using 20mm and downsize and clean sieved approved sand including mixing mechanically in Concrete Mixer laid in layers not exceeding 15cms thick layers, as per Drawing including cost of all materials, formwork, centring, vibrating , compacting, hire charges of machinery, lead, lift, loading, unloading, transporting, stacking, curing, finishing the exposed faces etc., including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work

710.66

-

6399

... More
Providing T.M.T. Steel bar reinforcement conforming to FE-500 Grade designation as per table 1000-3 including straightening bars, cutting, bending, hooking, binding with approved quality binding wire after placing in position, tying, lapping and or welding wherever required and anchoring to the adjoining members wherever necessary as per drawing including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work

83.64

-

56910

... More
supply delivery to work site loading unloading stacking and fixing of resilient seated soft sealing sluice valves with body, bonnet of ductille iron of minimum grade GGG40, wedge fully rubber lined with EPDM and seals of NBR and the valves should be of vacuum type and 100% leak proof with fact dimensions as per VS 5163-89\IS 14846 - 2000\ din3202F4\ F5.The steam sealing should be with torridal sealing rings (minimum 2 'O' rings).All the valves should be with elastostatic powder coating both inside and out side with pocketless body passage.The valves shall be supplied with suitable size galvanized bolts and nuts of required no's., -100mm dia including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work

80

-

16143

... More
MS Grating for top slab of storm water slab and including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work

4945.5

-

160

... More
Providing Weep Holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 110 mm outer dia PVC pipe, at 2Kg / Sqm , fixing in position with collar and clamp extending through the full width of the structure with slope of 1V :20H towards drawing force as per drawing including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Link Road - 1

8.8

-

329

... More
Construction of earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transportating to site, spreading, grading to required slope and compacted to meet requirement of table No.300-2 in layers not exceeding 250mm thick and complacting it by mechanical means after adding water to its OMC, so as to achieve 97% compaction of maximum dry density and finish the surface to the required by dozer, grading by motor grader, consolidation by vibratory road roller and carriage by tipper including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work (1) Link Road - 6 - 1185.30 (2) Link Road - 7 - 7691.32

8876.62

-

542

... More
Construction of Wet Mix Macadum by providing laying, spreading and compacting of graded stone aggregates as per Table 400-13, mixing in a Wet mix plant of 75 tonne capacity at OMC, carriage of mixed material to work site in tipper to paver, laid over a previously prepared surface to the required grade, level and alignment, compacting with vibratory roller 8-10 tonne to achieve the desired density of 98% including protection of edges of WMM layer, cost of all materials, labour, hire charges of machinary, laghting, guarding, barricading, maintanance of diversion road, including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work (1) Link Road - 6 - 843.75 (2) Link Road - 7 - 1881.00

2724.75

-

1729

... More
Providing and applying Primer coat with slow setting bitumen emulsion (SS1) complying with IS 8887 of approved quality and make on prepared surface of granular surface by mechanical Broom and dusting by Air compressor, and spraying using Bitumen Presure Distributor, uniformly at the rate of 0.80kg/sqm as per Table 500-3, including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work (1) Link Road - 6 - 3750 (2) Link Road - 7 - 8360

12110

-

64.28

... More
Providing and applying Tack coat as per Table 500-2 on prepared surface using Rapid Setting Bituminous Emulsion (RS1) complying with IS 8887 of approved quality and make including cleaning of road surface by Mechanical Broom & dusting by Air compressor, and spraying by bitumen Pressure Distributor, including cost of all materials, labour, hire charges of machinary, loading, unloading stacking, etc complete, emulsion. (I) (A) On black topped surface at min. 2.0kg/10Sqm. including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work (1) Link Road - 6 - 3750 (2) Link Road - 7 - 8360

12110

-

13.1

... More
Providing and laying Dense Graded Bituminous Macadam using crushed aggregates as per table 500-10 of specified graded aggregates and filler (Cement) @ 2% by weight of aggregates, premixed with bituminous binder 60/70 Grade in hot mix plant, loading of aggregates with F.E. loader, transported to site in tipper to paver, laid over a previously prepared surface with paver finisher to the required grade, level, alignment, rolling with Smooth wheeled roller 8-10 tonnes, vibratory roller 8 tonnes, smooth wheeled tandem roller 6-8 tonnes as per clauses 501.6 and 501.7 to achieve the desired compaction, including cost of all materials, labour, hire charges of machinery, lead, lifts, loading, unloading, stacking, transporting etc complete, except lead for Bitumen, cost of primer/tack coat. (Compacted thickness) (B), (i) 80-100mm compacted thickness (Grading-1) with 4.00% Bitumen. including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work (1) Link Road - 6 - 187.50 (2) Link Road - 7 - 418

605.5

-

8509.4

... More
Providing and laying Bituminous Concrete using crushed stone aggregates as per table 500-18 of specified graded aggregates and filler (Cement) @ 2% by weight of aggregates premixed with bituminous binder in hot mix plant, loading of aggregates with F.E. loader, transported to site in tipper to paver, laid over a previously prepared surface with Hydraustatic Paver Finisher with sensor control to the required grade, level, alignment, rolling with Smooth wheeled roller 8-10 tonnes, vibratory roller 8 tonnes, smooth wheeled tandem roller 6-8 tonnes as per clauses 501.6 and 501.7 to achieve the desired compaction, including cost of all materials, labour, hire charges of machinery, lead, lifts, loading, unloading, stacking, transporting etc complete, Using 40-60 TPH Hot mix plant Grading 2 with 5.50% Bitumen (30 - 45 mm compacted thickness) Using 60/70 Grade Bitumen. including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work (1) Link Road-6 - 112.50 (2) Link Road - 7 - 250.80

363.3

-

8509.4

... More
STRUCTURES : Dismatling of existing structures likeculverts,bridges, retaining walls and other structure compromising of masnory, cement concrete,wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable materials with all lifts and lead of 1000 meters including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Pipe Culverts (1) At Km 1.555-1.80 (2) At Km 2.125-1.80 (3) At Km 3.600-1.80

5.4

-

229

... More
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Culverts (1) At Km 1.555-0.02 (2) At Km 2.125-0.01 (3) At Km 3.600-0.01

0.04

-

37300

... More
Earth work in excavation for foundation of structures as per drawing including setting out, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved excavated material including labour, disposal of the excavated stuff within 100 mtrs radius etc., including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Culverts (1) At Km 1.555-71.02 (2) At Km 2.125-148.42 (3) At Km 3.600-47.59

267.03

-

51.3

... More
Back filling behind abutment, wing wall, return wall and foundation trenches as per drawing in layers not exceeding 20cms in depth, compacting deposited material by plate compactor/power rammer after duly watering to achieve the desired degree of compaction, including cost of materials, labour, hire charge of machineries, transportation, lead, lift, loading, unloading etc complete. A. Granular material including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Pipe Culverts (1) At Km 1.555-75.28 (2) At Km 2.125-85.25 (3) At Km 3.600- 19.57

180.1

-

768

... More
Providing & laying Plain / Reinforced Cement Concrete in Open foundation using granite/trap/basalt aggregates and clean sieved approved sand including mixing mechanically, laid in layers not exceeding 15cms thick layers, as per Drawing including cost of all materials, formwork, centring, vibrating , compacting, hire charges of machinery, lead, lift, loading, unloading, transporting, stacking, curing, finishing the exposed faces etc., (i) Using Concrete Mixer (A) PCC M15 using 40mm and downsize and including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Pipe Culverts (1) At Km 1.555-11.57 (2) At Km 2.125-4.45 (3) At Km 3.600- 3.02

19.04

-

5799

... More
Providing, furnishing and Placing Reinforced/ Prestressed cement concrete in superstructure udownsize granite/trap/ basalt coarse aggregates and clean seived approved sand, mixing mechanically, laid in layers not exceeding 15cms thick layers, compacting, formwork, centring, finishing exposed faces nicely, curing as per drawing C. RCC M 20 and including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Pipe Culverts (1) At Km 1.555-28.98 (2) At Km 2.125-52.50 (3) At Km 3.600- 28.983

110.46

-

6600

... More
Providing, laying and jointing RCC NP- 4 Pipe (as per IS: 458-2000) for culverts including testing complete as per drawings and Tec. Spec. Cl. 2900 and including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Pipe Culverts (1) At Km 1.555-20.00 (2) At Km 2.125-22.50

42.5

-

7107

... More
----Do----- At Km 3.600 900 mm Dia

5

-

7778

... More
Providing TMT bar reinforcement conforming to FE-500 Grade designation as per table 1000-3 in Substructure including straightening bars, cutting, bending, hooking, binding with approved quality binding wire after placing in position, tying, lapping and or welding wherever required and anchoring to the adjoining members wherever necessary as per drawing including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Pipe Culverts (1) At Km 1.555-1.388 (2) At Km 2.125-1.388 (3) At Km 3.600 - 1.388

4.16

-

62226

... More
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces, including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Pipe Culverts (1) At Km 1.555-8.40 (2) At Km 2.125-16.00 (3) At Km 3.600 - 8.40

32.8

-

62.7

... More
Painting of Culvert no and span arrangement as per IRC-7: 1971 drawings and direction of the engineer. Tech Spec Cl. 800 including all lead & lift labour charges, loading unloadin, cost all materials hiring charges & transportation charges of machinerie, curing & inclusive all incidential charges etc complete as per the specifications & as directions of Engineer-in-charge of work Pipe Culverts (1) At Km 1.555-2.00 (2) At Km 2.125-2.00 (3) At Km 3.600 - 2.00

6

-

150



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.