Karnataka Rural Road Development Agency Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Karnataka Rural Road Development Agency - KRRDA Tender

Civil And Construction
Road Construction
Opening Date20 Mar 2023
Closing Date1 Apr 2023
Tender Amount₹ 6,09,34,194 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
SCARIFYING EXISTING GRANULAR SURFACE to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

7511

25

189277.2

... More
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

16298

6

102677.4

... More
LOOSENING, LEVELLING AND COMPACTING ORIGINAL GROUND supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

4618.12

13

63037.34

... More
CONSTRUCTION OF EMBANKMENT with approved materials DEPOSITED AT SITE from roady way cutting and excavation from Drain and foundation of other structures graded and compacted to meet requirement of Table 300.1 and 300.2 as per Technical Specification Clause 301.5 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

3459.09

38

134385.65

... More
Construction of Embankment with approved materials obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

7457.86

358

2670286.77

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

8007.34

351

2816581.84

... More
Providing, laying, spreading and compacting available stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.with all lead, lifts,loading & unloding charges, cost and conveyance of all materials, labour,equipments etc., complete. WBM Grade II as per the directions of the Engineer incharge of the work.

597.04

918

548082.72

... More
Providing, laying, Stabilized Sub-base / Base: Providing, Laying, Spreading and Compacting in-situ/borrow area soil of CBR >5% mixed with 30% crushed aggregate / muruum / GSB Grade 2 as per mix design. Application: (1) Rip and loosen soil with excavator / tractor operated ripper and scarify with tractor operated rotavator to achieve desired thickness of 250 mm. Mix aggregates as per mix design with rotavator. (2) Spread Cement 3% by weight of soil aggregate mix and mix with tractor operated rotavator. (3) Prepare and apply 1 kg /cum Terrasil organosilane Nanotechnology and 1 kg/cum Zycobond Acrylic Nano copolymer mixed in OMC water (<1000 ppm TDS) on loose mix . Scarify the treated mix with rotavator. (4) Compact partially the surface with vibratory roller. (4) Spread 26.5 and down size aggregates on the graded soil surface to form 20-25 mm thick soil-aggregate-cement layer. (5).Compact the stabilized soil-aggregate-cement base with 8 to 10 tonne vibratory roller to achieve stone embedded layer with the desired density and thickness..with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

692.55

1831

1268322.22

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming ,Crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. By Mechanical Means as per the directions of the Engineer incharge of the work.

1537.65

1964

3020790.31

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. By Mechanical Means as per the directions of the Engineer incharge of the work

2703.86

2278

6160745.01

... More
Providing and applying primer coat with bitumen emulsion (SS-1) of low porosity on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per Techinical Specification Clause 502 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

33112.5

54

1807942.5

... More
Providing and laying surface dressing as wearing course consisting of a layer of bituminous binder laid on the prepared surface, followed by a cover of crushed stone aggregates of specified size and rolling with three wheel 80-100 kN static roller including cleaning the road surface as per Technical Specification Clause 507. by MECHANICAL means, TYPE B-Case II Nominal chipping size 13.2 mm-Bitumen (S-65) with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

33112.5

65

2155623.75

... More
Providing and laying surface dressing as wearing course consisting of a layer of bituminous binder laid on the prepared surface, followed by a cover of crushed stone aggregates of specified size and rolling with three wheel 80-100 kN static roller including cleaning the road surface as per Technical Specification Clause 507. by MECHANICAL means,TYPE B-Case II Nominal chipping size 9.5 mm-Bitumen (S-65) with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

33112.5

56

1877478.75

... More
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work.

162.48

7067

1148335.52

... More
Providing and constructing Panel Concrete of Panel/Grove cutti ng size is mx1 m thickness per design, over prepared sub base, with plai n cement concrete pavement with approved grade @420 kg/m3 and AS RC-SP-76, Coarse and fine aggregate confirming lS-383:2016 maximum of flne aggregate not exceeding 20mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design and Plasticizer 0.4 % by weight of cement,laid in approved fixed side formwork (steel channel laying and of 125 fixing micron th ick polythene film, wedges, steel plates including level ling the formwork AS per drawing), spreading the concrete with shovels, rakes, compacted using scred and plate vibrators and nished in continuous operation including provision of contraction and expansion, construction joints, primer sealant curing concrete slabs for '14-days, and water fin ishing to lines and grade per drawing and technical specificatlon clause 1501

521.46

7077

3690372.42

... More
Providing and constructing Cell Filled Cement Concrete pavement rate analysis :M-30. Construction of plastic cell filled cement concrete pavement, with M30 gradeconcrete, thickness as per design, over a prepared sub base, with 53 grade Ordinary Portland Cement (OPC) or any other type as per Clause 1501.2.4 M30 (Grade). Coarse and fine aggregates 2386, maximum in a concrete mixer of not less then 0.2 cum capacity and appropeiate weigh batcher using approved mix design(As perconforming to IS :IRC 44-2088, laid in approved fixed side formwork (steel channe, wedges, steel plates including levelling the fomwork as per drawing),spreading the concrete with sholvels, rakes, conpacted using screed and plate vibrators and finished in continuous operation,Concrete should have a slump of 30-50MM with use of approved plasticizer if required Formwork of plastic cells should be made of High Density Polyethylene (HDPE), sheets having thickness ranging from 0.20-0.22MM with sides 150MMx150MM and height as fixed by engineer in charge. To be laid in full widfth of the carriageway.Iron spikes of about 200MM long are to be used to keep the cell walls taut. Nylon thread or rope may be used to prevent collase of cells during placement of concrete. Iron spikes to be taken out for use in other place as soon as the concrete is in place.The subbase should be provided with concrete/stone block or brick on edge on either side of the carriageway protecting the subbase with full thickness of the concrete poavement for its confinement and protection. curing of concrete slabs for 14 - days, curing compound ( where specified) and water finishing to lines and grade as per drawing and Technical Specification of cell filled Concrete Pavement Published by NRRDA. as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

562.5

705

396900

... More
Providing and laying revetment / pitching on slops laid over prepared filter media as perdrawing and technical specifications clause 1302 Stone/Boulder with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

658.32

1150

757594.66

... More
Providing and fixing Reinforced cement concrete M15 grade 5th kilometre stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work 5th Kilometre stone(precast)

1

3944

3944.85

... More
Providing and fixing Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work Ordinary Kilometre stone(precast)

10

2362

23625

... More
Providing and fixing Reinforced cement concrete M15 grade of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work 200 Mtr stone (precast)

38

647

24618.3

... More
Providing and fixing Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work.

685

590

404218.5

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over Aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing complete as per specifications. 600 MM Equivelateral –Type XI with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, etc., complete as per the directions of the Engineer incharge of the work

24

2598

62370

... More
Providing and erecting direction and place identifications of semi reflective sign boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. Supported and welded on 47 mm x 47mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701

7.2

2417

17403.12

... More
Providing and Fixing 'Logo Board ' of PMGSY at Starting Point: Providing and fixing of typical Logo board as per specifications and drawing. Two ACP Sheet of 3mm thick, top and Bottom plate duly welded/bolted with MS Square angle 25mm x25mmx 5mm size on back and on the edges. The Top and Bottom plate will be welded/ bolted to 1 nos75x75x6 mm square Hallow section duly embedded in cement concrete M15 Grade of 600*600*600 mm, 450 mm below ground level.Retro-Reflecting Sheet as per IRC:67 Clause 1701.3.8.1 fixed over aluminium sheeting.All sections of steel tube will be painted with primer and two coats of epoxy paint as per drawing. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

2

7781

15563.1

... More
Providing and Fixing 'Logo Board ' of PMGSY at Intermediate Point: Providing and fixing of typical Logo board as per specifications and drawing. Two ACP Sheet of 3mm thick, top and Bottom plate duly welded/bolted with MS Square angle 25mm x25mmx 5mm size on back and on the edges. The Top and Bottom plate will be welded/ bolted to 1 nos75x75x6 mm square Hallow section duly embedded in cement concrete M15 Grade of 600*600*600 mm, 450 mm below ground level.Retro-Reflecting Sheet as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting.All sections of steel tube will be painted with primer and two coats of epoxy paint as per drawing.Retro Reflective Sign as per IRC 67 Clause 1701.3.8.1 Class A Type 1 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

2

7409

14819.7

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. i)The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in diamond shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, PMGSY logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

4

13150

52601.4

... More
Providing and Fixing 'Citizen Information Board A". Providing and fixing of typical 'Citizen Information Board A" as per specifications and drawing. Two ACP Sheet of 4mm thick having minimum 0.25mm thick aluminum skin both sides and fixed over a back support of Ms plate of 5mm thick. Supported on frame post of 2 no's of MS Suare hallow section 75mmx75mmx6mm which is duly embedded in cement concrete M20 Grade of 600x600x750mm,600mm below ground level.All MS will be stove enameled on both the sides.All sections of framed posts,MS sheet and Stell tubes will be painted with primer and two coats of epoxy paint as per drawing etc..Retro-Reflective Sheet as per IRC 67 fixted over a two no's of Aluminum composite material(ACP) sheeting of size 900x750mm of 4mm thick duly bolted/reveted with MS plate of 5mm thick on backside of ACP Sheet.Including cost and conveyance of all materials,equipment,machinery and labour with all leads and lifts,loading charges charges necessary for satisfactory completion of work as per directed by engineer incharge. (i) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (ii) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7. Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type-1

2

15843

31686.9

... More
Providing and fixing of typical Maintenance information board as per specifications and drawing. ACP Sheet of 3 mm thick having minimum 0.25mm thick aluminum skin both sides and fixed over a back support of Ms plate of 5mm thick. Supported on frame post of 2 no's of MS Suare hallow section 75mmx75mmx6mm which is duly embedded in cement concrete M20 Grade of 600x600x750mm,600mm below ground level.All MS will be stove enameled on both the sides.All sections of framed posts,MS sheet and Stell tubes will be painted with primer and two coats of epoxy paint as per drawing etc..Retro-Reflective Sheet as per IRC 67 fixted over a Aluminum composite material(ACP) sheeting of size 900x1500mm of 3mm thick duly bolted/reveted with MS plate of 5mm thick on backside of ACP Sheet.Including cost and conveyance of all materials,equipment,machinery and labour with all leads and lifts,loading charges charges necessary for satisfactory completion of work as per directed by engineer incharge. (i) For warranty and durability the clause 1701.5 and for mainte`nance the clause 1911 shall be applicable. (ii) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7 .Retro Reflective Sign as per IRC 67 Clause 1701.3.8.1 Class A Type 1 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

2

15588

31176.6

... More
Providing road humps for the entire formation width, using bituminous premix materials and heavy duty cobble stones 60 mm thick, having road hump dimension of 1.00 mtr (width) X 0.15 mtr (height) rectangular sections and ramp on either side of road hump of 0.85 mtr (wide), including providing WBM (2 layers) for shoulder portion 1.7mts in length on either side, completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC SP 67-2010 (for details refer IRC 99-1988). For single lane for formation width of 7.50 mtr using SDBC mix material. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

25

33846

846168.75

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectrising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes complete as per specifications. MORTH Specification No. 803

2024

450

911710.8

... More
Providing and erecting a “W” metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 800.10 complete as per specifications.Excluding cost of earth work wxcavation & PCC for fixing. A. Type - A, “W” With all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

100

2056

205695

... More
Providing and fixing of road stud 100 x 100 mm die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling holes 30 mm upto a depth of 600 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS:873 (Part 4) 1973. With all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

250

331

82950

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work as per Technical Specification Clause 202.Cement concrete

6.4

567

3628.8

... More
DISMANTLING EXISTING STRUCTURES like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material as per Technical Specification Clause 202. RUBBLE STONE MASONRY IN CEMENT MORTAR With all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

33.66

367

12370.05

... More
REMOVING all types of HUME PIPES and stacking including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. UPTO 600 MM DIA. With all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

67.5

259

17506.12

... More
Earthwork in excavation for structures as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal dressing of sides and bottom and backfilling in trenches with excavated suitable material. In ordinary Soil. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

2896.82

403

1167997.82

... More
FILLING IN FOUNDATION trenches as per drawing and technical specification Clause 305.3.9 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work SAND FILLING

110.06

2062

226965.73

... More
Providing and constructing plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.P.C.C. grade M-10, Nominal mix 1:3:6 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

396.25

4930

1953829.5

... More
Providing & Laying concrete cradle bedding with M15 Grade Cement Concrete as per Clause 1105(i) with all lead and lifts, loading and unloading charges, cost of all materials & conveyance, labour, equipments etc., complete as per detailed specification and direction of the Engineer-in-charge.

4.15

5244

21765.71

... More
Providing concrete for plain/reinforced concrete in OPEN FOUNDATIONS complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC grade M15 NOMINAL MIX 1:2.5:5 with all lead and lifts, loading and unloading charges, cost of all materials & conveyance, labour, equipments etc., complete as per detailed specification and direction of the Engineer-in-charge.

86.07

4845

417073.7

... More
Providing and constructing Plain/reinforced cement concrete PCC M-15 nominal mix (1:2.5:5) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

786.65

5125

4031620.58

... More
Providing and constructing Plain / reinforced CEMENT CONCRETE IN SUBSTRUCTURE complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 PCC GRADE M20 NOMINAL MIX 1:2:4 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

448.95

5622

2524333.61

... More
Supplying, fitting and placing TMT BAR REINFORCEMENT (Fe 415) in SUBSTRUCTURE complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work

30.75

61197

1881812.36

... More
Providing and laying reinforced CEMENT CONCRETE IN SUPERSTRUCTURE as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 RCC grade M-20 For nominal mix 1:2:4 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work

11.78

6372

75067.46

... More
Providing and laying reinforced CEMENT CONCRETE IN SUPERSTRUCTURE as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 R.C.C M 25 with all lead, lifts, loading & unloading charges, cost and conveyance of al

6.98

6721

46912.93

... More
Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

1.58

62616

98934.47

... More
Providing and laying reinforced CEMENT CONCRETE PIPE NP3 600MM DIA for culverts including pointing ends, and fixing collars with cement mortar 1:2 including cost of all materials, labour, curing complete as per specifications. Specifications. No. KSRB 1000, 2300 MORT & H Specification No.1000 / 2300 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work 1000 mm dia single row

172.5

3349

577788.75

... More
Providing and laying reinforced cement concrete pipe NP3 class for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets clause 1106. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work 1000 mm dia single row

180

5918

1065393

... More
Providing and Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.7 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

624.59

1032

644670.57

... More
Providing and laying BOULDER APRON for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

289.48

1150

333133.58

... More
Providing and laying reinforced CEMENT CONCRETE PIPE NP2 450MM DIA for culverts including pointing ends, and fixing collars with cement mortar 1:2 including cost of all materials, labour, curing complete as per specifications. Specifications. No. KSRB 1000, 2300 MORT & H Specification No.1000 / 2300 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

175

1509

264232.5

... More
Routine maintenance after completion of construction work For 1st Year

8.89

76000

675640

... More
Routine maintenance after completion of construction work For 2nd Year

8.89

90500

804545

... More
Routine maintenance after completion of construction work For 3rd Year

8.89

112200

997458

... More
Routine maintenance after completion of construction work For 4th Year

8.89

135400

1203706

... More
Routine maintenance after completion of construction work For 5th Year

8.89

160000

1422400

... More
Routine maintenance after completion of construction work For 1st Year (rigid)

1.23

65000

79950

... More
Routine maintenance after completion of construction work For 2nd Year (rigid)

1.23

72000

88560

... More
Routine maintenance after completion of construction work For 3rd Year (rigid)

1.23

82000

100860

... More
Routine maintenance after completion of construction work For 4th Year (rigid)

1.23

92600

113898

... More
Routine maintenance after completion of construction work For 5th Year (rigid)

1.23

103800

127674

... More
6th Year Renewal after maintenance: Clearing & grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings & trees of girth upto 300mm, removal of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable material to be used or auctioned, including removal & disposal of top organic soil not exceeding 150mm in thickness as per technical specification clause 201.with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work In area of non thorny jungle. By mechanical means.

3.34

24361

81368.14

... More
6th Year Renewal after maintenance: Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

780.56

436

340456.86

... More
6th Year Renewal after maintenance: Surface Drains in Soil : Construction of unline surface dressing of average cross sectional area 0.40 Sqm in soil to specified lines,grades level and dimension. Excavated material to be used in embkmant as per technical specification clause 307 . Mechnical Means .with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

17780

22

393471.4

... More
6th Year Renewal after maintenance: Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. With all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

33112.5

11

388078.5

... More
6th Year Renewal after maintenance: Mix Seal Surfacing (For 6th Year Renewal) Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or13.2 mm to 0.9 mm (Type - B) aggregates with with addition of processed waste plastic 8% by weight of bitumen using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in suitable plant, laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Mechanical means,(II) Bitumen (S-65) , Provision for 6th Year Recarpet as Adhoc increase of 24% From Present SR. With all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

33112.5

169

5604621.75

... More
6th Year Renewal after maintenance: Road Marking with Hot Applied Thermoplastic Compound with Reflectrising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes complete as per specifications. MORTH Specification No. 803 With all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

1778

558

993119.68

... More
6th Year Renewal after maintenance: Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair,repair stocracks, parapet wall and protection work as per drawing and technical specification Clause 1908. With all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

11

1801

19821.67

... More
6th Year Renewal after maintenance: Maintenance of Culverts Slab type Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repair stocracks, parapet walls and Protection works as perdrawing and technical specification Clasue 1908. With all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

2

3840

7681.8

... More
6th Year Renewal after maintenance: Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909. With all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

90

87

7850.7

... More
6th Year Renewal after maintenance: Maintenance of Road Signs : Maintenance of road signs by way of cleaning and repainting of mandatory/requlatory/cautionary/informatory and place identifications sign board as per drawings and technical specification Clause 1910. With all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

8.89

1762

15672.27

... More
6th Year Renewal after maintenance: Boundary Pillars Reinforced cement concrete M 15 grade boundary pillars/local stone of standard design as per IRC : 25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704. With all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer incharge of the work

194

731

141953.68



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.