Karnataka Residential Educational Institutions Society Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Karnataka Residential Educational Institutions Society - KREIS Tender

Civil And Construction
Civil Works Others
Opening Date27 Feb 2024
Closing Date12 Mar 2024
Tender Amount₹ 57,14,985.6 
Notes
Download

Costs

Summary

Construction Of Compound Wall To (st) Mdrs K Belthuru H D Kote Taluk,mysore District

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1.14.1 - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of Engineer in charge of the work.

223.4

102

22786.8

... More
2.1.3 - Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of Engineer in charge of the work.

37.41

5989

224048.49

... More
2.11(a) - Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of Engineer in charge of the work.

10.89

89457

974186.73

... More
6.33 - Providing and constructing load bearing wall with Solid Concrete blocks of size 400x150x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of Engineer in charge of the work.

877.88

1231

1080670.28

... More
8.8 - Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of Engineer in charge of the work.

2320

371

860720

... More
8.27 - Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of Engineer in charge of the work.

2320

53

122960

... More
8.28 - Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of Engineer in charge of the work.

2320

89

206480

... More
11.57.1 - Fencing with G.I. barbed wire Angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of Engineer in charge of the work.

5220

18

93960

... More
11.25.2 - Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of Engineer in charge of the work.

1860.3

136

253000.8

... More
8.80 - Forming groove of uniform size in the top layer of plaster as per approved pattern including repair to the edges of panels and finishing the groove complete as per specifications and direction of the Engineer-in-charge: 20 mm to 25 mm wide to required depth. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of Engineer in charge of the work.

2425.4

66

160076.4

... More
8.41 - Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of Engineer in charge of the work.

22.26

167

3717.42

... More
1.11 - Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of Engineer in charge of the work.

224.57

433

97238.81

... More
2.2.1 - Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of Engineer in charge of the work.

69.48

9430

655231.14

... More
2.2.1 - Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of Engineer in charge of the work.

27

6789

183328.92

... More
2.2.1 - Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of Engineer in charge of the work.

5.09

10687

54401.411

... More
2.5.1 - Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of Engineer in charge of the work.

22.9

11271

258105.9

... More
8.1.1 - Providing 12 mm thick plain cement mortar bands in cement mortar 1:4 (1 cement : 4 fine sand): Moulded Band including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all men and machinery and equipments required for successful completion of work etc., complete. The work shall be executed as per standard technical specifications and as per the directions of Engineer in charge of the work.

1160

255

295800



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.