Karnataka Power Transmission Corporation Limited

  • Tender Amount

    ₹ 8,044,950

  • EMD

    ₹ 81,000

  • Opening Date

    27 Feb 2019

  • Closing Date

    26 Mar 2019

Tender
Summary

Providing Additional 1x8 Mva 66/11kv Power Transformer With Necessary Switchgears At Chidravalli 66/11 Kv Sub-station In T.narasipura Taluk Mysuru District.

SECTION – I (VOLUME – IIB) GENERAL TECHNICAL CONDITIONS (GTC) VOLUME-IIB SECTION-I GENERAL TECHNICAL CONDITIONS 1.0 GENERAL 2.0 SCOPE 3.0 APPLICABLE STANDARDS 4.0 SERVICE CONDITIONS 5.0 DRAWING 6.0 BASIC TECHNICAL PARAMETERS OF THE LINES VOLUME – IIB SECTION–I GENERAL TECHNICAL CONDITIONS 1.00 GENERAL: This part covers technical conditions pursuant to the contract and will form an integral part of the contract. The following provisions shall supplement all the detailed technical specifications and requirements brought out in accompanying Technical Specifications. The Contractor’s proposal shall be based upon the use of equipment and materials complying fully with the requirements specified herein. It is recognized that the contractor may have standardized on the use of certain components, materials, processes or procedures different than those specified herein. Proposals offering similar equipment based on the manufacturer’s standard practice will be considered provided such equipments meet other authoritative standards and will be of an equal or higher quality than the standard specified. Such equipment will also to meet the performance requirements specified and be acceptable to the Owner. 1.01 Limit Of Contract: Equipment Furnished shall be complete in every respect with all mountings, fittings, fixtures and standard accessories normally provided with such equipment and/or needed for erection, completion and safe operation of the equipment as required by applicable codes, even though they may not have been specifically detailed in the technical specifications, unless included in the list of exclusions. All similar standard components/parts of similar standard equipments provided, shall be inter-changeable with one another. Similarly, all services as may be necessary for the execution of the Contract though they may not have been specifically detailed in the Technical Specifications, unless specifically excluded, shall be furnished by the Contractor. 1.02 Equipment Performance Guarantee: The performance guarantee of the equipment under the scope of the contract has been detailed in the Technical Specifications. These guarantees shall supplement the general performance guarantee provisions covered under General Conditions of Contract. Liquidated damages for not meeting performance guarantees during the performance and guarantee tests shall be assessed and recovered from the Contractor as detailed in Special conditions of Contract. Such liquidated damages shall be in addition to damages, if any, payable under any other clause of Conditions of Contract, Special Conditions of Contract. 1.03 Engineering Data: The furnishing of engineering data by the Contractor shall be in accordance with the schedule for each set of equipment and materials as specified in the Technical Specifications. The review of the data by the Engineer will cover only general conformance of the data to the specifications and documents, interfaces with the equipment and materials provided under the Specifications, external connections and of the dimensions which might affect plant layout. This review by the Engineer may not indicate a thorough review of all dimensions, quantities and details of the equipment and materials, any device or item indicated or the accuracy of the information submitted. This review and/or approval by the Engineer shall not be considered, by the Contractor, as limiting any of its responsibilities and liabilities for mistakes and deviations from the requirements, specified under these Specifications and Documents. All engineering data submitted by the Contractor after final process including review and approval by the Engineer shall form part of the Contract Documents and all the works performed shall be in strict conformity with these speci

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.