Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

SECTION – IV (VOLUME-I) ERECTION CONDITIONS OF CONTRACT (ECC) SECTION-IV - ECC ERECTION CONDITIONS OF CONTRACT 1.0 General 2.0 Regulation of local Authorised and Statutes 3.0 Owner’s Lien on Equipment 4.0 Inspection, Testing and Inspection Certificates 5.0 Access to Site and Works on Site 6.0 Contractors Site Office Establishment 7.0 Co-Operation with other Contractors 8.0 Discipline of Workmen 9.0 Contractor’s Field Operation 10.0 Photographs and Progress Report 11.0 Man-power Report 12.0 Protection Of Works 13.0 Employment of Labour 14.0 Facilities to be provided by the Owner 15.0 Facilities to be provided by the Contractor 16.0 Lines and Grades 17.0 Fire Protection 18.0 Security 19.0 Contractor’s Area Limits 20.0 Contractor’s Co-Operation with the Owner 21.0 Pre-Commissioning Trails and Initial Operations 22.0 Materials Handling an Storage 23.0 Construction Management 24.0 Field Office records 25.0 Contractor’s Materials brought on to Site 26.0 Protection of property and Contractors liability 27.0 Painting 28.0 Insurance 29.0 Unfavourable Working conditions 30.0 Protection of monuments and reference points 31.0 Work and safety Regulations 32.0 Code requirements 33.0 Foundation dressing and Grouting 34.0 Commissioning Spares SECTION-IV - ECC ERECTION CONDITIONS OF CONTRACT 1.0 GENERAL: 1.1 The following shall supplement the condition, already contained in the other parts of these specifications and document and shall govern the, portion of the work of this contract to be performed at Site. 1.2 The Contractor upon signing of the contract shall, in addition to a project coordinator, nominate another responsible officer as his representative at site, suitably designated for the purpose of overall responsibility and coordination of the works to be performed at site. Such persons shall function from the site office of the Contractor during the pendency of contract. 2.0 REGULATION OF LOCAL AUTHORITIES AND STATUTES: 2.1 The Contractor shall comply with all the rules and regulations of local authorities during the performance of his field activities. He shall also comply with all labour laws including the Minimum Wages Act, 1948, the Payment of Wages Act and the rules made there under in respect of any employee or workman employed or engaged by him or his Sub-Contractor. 2.2 All registration and statutory inspection fees, if any in respect of his work pursuant to this contract, shall be to the account of the Contractor. However any registration/statutory inspection fees lawfully payable under any statutory laws and its amendments from time to time during erection in respect of the equipment, ultimately to be owned by the Owner, shall be to the account of the Owner. Should any such inspection or registration need to be rearranged due to the fault of the Contractor or his Sub-Contractors, the additional fees to such inspection and/or registration shall be borne by the Contractor. 3.0 OWNER’S LIEN ON EQUIPMENT: The Owner shall have lien on all equipment including those of the contractor brought to the site for the purpose of erection, testing and commissioning of the equipment to be supplied(either Owner Supplied or Contractor Supplied) and erected under the contract. The Owner shall continue to hold the lien on all such equipment throughout the period of contract. no material bought to the site shall be removed from the site by the contractor and or is Sub-Contractor without the prior written approval of the Engineer 4.0 INSPECTION, TESTING & INSPECTION CERTIFICATES: The provision of the clause entitled inspection; testing and inspection certificates under technical specification shall also be applicable to the erection portion of the works. The Engineer shall have the right to re-inspect any equipment though previo

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.