Karnataka Neeravari Nigam Limited Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Karnataka Neeravari Nigam Limited - KNNL Tender

Works
Civil And Construction
Irrigation Work
Opening Date15 Nov 2024
Closing Soon26 Nov 2024
Tender Amount₹ 4,19,12,028.15 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Commn MI SR 2021-22 VOL3 Pg No18 It No1.20 - Providing impervious filling adjacent to masonry / concrete structure and filling trial pits with soil available in adjacent area in layers of 100 to 150 mm and compacting each layer to density control of not less than 95 percent using pneumatic tampers or by vibratory earth rammers including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as perspecificationFor BC Soil Blanke complete as per direction of Engineer incharge

9004

269

2429729.4

... More
Commn roadSR 2024 25 VOL III Page No 17 ItNo3.6 - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2complete as per direction of Engineer incharge

6820.49

517

3530626.6485

... More
Commn MI SR 2024 25 VOL4Page No 129 It No 1.6 - Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing etc., complete with all lead and lifts.complete as per direction of Engineer incharge

6649.2

771

5131520.1

... More
WRDSR VOL 4 PART-I Item No.3.26.1,pg no 51,2024-25 - Providing and laying insitu vibrated M-15 grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, labour,cleaning, batching, mixing, formwork, supports, placing in position, levelling, vibrating, finishing junction of bed and sides to required curvature, finishing side slopes, curing with all other ancillary operations complete. complete as per direction of Engineer incharge

310.19

8688

2695163.3625

... More
WRDSR VOL4 PART-I It No.3.2 pgno 139 2024-25 - Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specificationcomplete as per direction of Engineer incharge

1824

390

712454.4

... More
RoadSR VOL3 PARTI It No.8.18, pgno 67 2024-25 - Boundary pillar / Guard Stone Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting complete as per direction of Engineer incharge

518

785

406837.2

... More
WRDSR VOL4 PART-I ItNo.8.24.1,pgno 104,2023-24 - Excavation and removal of silt and silt mixed with sand from canal bed by manual means including disposing off the same in spoil bank or on the canal embankment in layers as directed with all other ancillary operations complete. in dry condition complete as per direction of Engineer incharge

293

299

87680.25

... More
CSR VOLI ItNo.1.5.1, pg no 6, 2023-24 - Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. In ordinary/soft rock without blasting upto 1.5 m depth.complete as per direction of Engineer incharge

6956.63

313

2184033.9885

... More
WRDSR VOL 4 PART-I ItNo.3.3,pgno 47,2023-24 - Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm ( before compaction ) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller and all other ancillary operations complete.complete as per direction of Engineer incharge

4425

660

2922491.25

... More
WRD SR 2024-25, Vol-IV,item No.3.20, P.No.50 - Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from borrow area including cost of all materials, labour, machinery, spreading soil in layers of thickness not more than 150 mm, breaking clods, levelling, watering, compacting to density control of not less than 95 percent or as stipulated, dressing to required profile and all other ancillary operations complete.complete as per direction of Engineer incharge

2153

761

1638971.25

... More
WRDSR VOL4 PART-I ItNo.3.26.1,pgno 51, 2023-24 - Providing and laying insitu vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.complete as per direction of Engineer incharge

180.02

6369

1146601.386

... More
WRDSR VOL4 PART-I ItNo.3.27, pgno 51, 2023-24 - Providing and laying insitu vibrated M-15 grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, labour,cleaning, batching, mixing, formwork, supports, placing in position, levelling, vibrating, finishing junction of bed and sides to required curvature, finishing side slopes, curing with all other ancillary operations complete.complete as per direction of Engineer incharge

351.8

8688

3056702.25

... More
WRDSR VOL4 PART-I ItNo.3.37.2, pgno 51, 2023-24 - Providing and fixing tarfelt expansion joint filler board for cement concrete lining of canal including cost of all materials, labour and all other ancillary operations complete. 20 mm thick 100 mm depth.complete as per direction of Engineer incharge

222

90

20046.6

... More
WRDSR VOL3 PART-I ItNo.8.16 (ii) pgno 67,2023-24 - Kilometre Stone: Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (Precast) complete as per direction of Engineer incharge

3

3073

9220.05

... More
Common SR VOL1 ItNo.1.6.1,pgno 6,2023-24 - Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. In all kinds of soils. Depth upto 1.50m complete as per direction of Engineer incharge

110

508

55902

... More
BWSSB SR VOL5 PART-I ItNo.16.3,pgno 188,2023-24 - Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey RCC NP3 Class pipe of 400 mm dia.complete as per direction of Engineer incharge

110

2137

235158

... More
Common SR Vol3 ItNo.2.8 II a of Pg 10 - Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and leadconcrete.By Mechanical Means Cement Concrete Grade M-15 & M-20 Cement Concrete Grade M-15 & M-20 complete as per direction of Engineer incharge

10

754

7549.5

... More
Common SR Vol I Item No.1.4 II a of Page 5 - Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work.In ordinary/soft rock without blasting upto 1.5 m depth and initial lift upto 1.5 m complete as per direction of Engineer incharge

19.09

254

4850.769

... More
Common SR Vol I ItNo.2.1.3,pgno 15, 2023-24 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates complete as per direction of Engineer incharge

6.47

6288

40686.2715

... More
Common SR Vol I ItNo.2.4.1,pgno 16,2023-24 - Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates complete as per direction of Engineer incharge

19.82

6724

133273.644

... More
Common SR Vol I ItNo.2.11.f, pgno 18,2023-24 - Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Canal & Allied Works complete as per direction of Engineer incharge

0.4

94510

37804.2

... More
Common SR Vol V ItNo.16.32 pgno 128,2023-24 - Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey RCC NP3 Class pipe of 300 mm dia.complete as per direction of Engineer incharge

30

1398

41958

... More
Common SR ItNo.4.15,pgno 61 of WRD Vol 4,2023-24 - Providing and filling murrum / gravelly soil ( CNS soil ) for foundation or around pipes including cost of all materials, labour, spreading soil in layers of 100 to 150 mm, breaking clods, watering, compaction by earth masters to achieve density control of not less than 90 percent and all other ancillary operations complete.complete as per direction of Engineer incharge

50.39

861

43385.79

... More
WRDSR VOL4 PART-I ItNo.6.27,pgno 83,2024-25 - Design, fabrication, supply, erection and commissioning of embedded parts ( with top seal seat ) consisting of sill beam, wheel tracks, seal seats, guide rails, groove lining upto top with all accessories for vertical lift roller gate for canal escape / regulator including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint complets as per specifications and approved drawings.Note:1. Wt of 1 set of embedded parts in tonnes equal to 0.1332 x (L2 x H x h)0.659 Where ( L ) is length equal to Clear vent width in m + 0.50 m.( H ) is height of gate in m equal to Clear vent height in m + 0.20 m ( h ) is head of water above sill of gate in m equal FSL Sill level 2. Quantity of structural steel equal to 95.4 percent of computed weight for 1 set. equal to 0.1332(L2 x H x h)0.659 L equal to Clear length + 0.5 equal to 0.95 H equal to Vent ht + 0.2 equal to 0.65 h equal to head equal to U/S FSL Sill level equal to 0.15 complete.complete as per direction of Engineer incharge

0.03

198450

5953.5

... More
WRDSR VOL4 PART-I ItNo.6.28, pgno 83,2024-25 - Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift gate ( with top seal ) consisting of skin plate, siffeners, horizontal and vertical girders, wheels, guide rollers, rubber seals with all accessories for canal escape / regulator vent including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings.Note:1. Weight of 1 gate in tonnes equal to 0.0888 ( L2 x H x h )0.659 Where ( L ) is length equal to Clear vent width in m + 0.50 m. ( H ) is height of gate in m equal to Clear vent height in m + 0.20 m ( h ) is head of water above sill of gate in m equal to FSL Sill level 2. Quantity of structural steel 92.1 percent of computed weight for 1 gate.equal to 0.0888(L2 x H x h)0.659 complete.complete as per direction of Engineer incharge

0.02

185325

3706.5

... More
WRDSR VOL4 PART-I ItNo.6.29,pg no 83,2024-25 - Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw type hoist consisting of supporting structure, platfom, railing, ladder with all accessories for operating canal escape / regulator gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, greasing, applying two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel paint and all other ancillary operations complete as per specifications and approved drawings.Note:1. Capacity of hoist in t with 25 percent reserve capacity equal to 2.50 x Wt of gate.( Hoist capacity shall be rounded off to next 1 tonne ) Weight of hoist with all accessories: 300 kg per tonne capacity of hoist 2. Quantity of structural steel equal to 61.2 percent of computed weight for 1 hoist.complete as per direction of Engineer incharge equal to 2.5 x weight of gate

1

50085

50085

... More
I.NO.2.5.ii.a PgNo 9,Common SR Vol3,2023-24 - Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness (ii) By Mechanical Means using Dozer ,(a) in area of light Jungle complete as per direction of Engineer incharge (Unit read as 100m2)

138.9

412

57317.085

... More
WRD Common SR 2023-24 Vol4 I.No.3.3 P.No.47 - Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm (before compaction ) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller and all other ancillary operations complete. complete as per direction of Engineer incharge

4743.75

660

3133009.6875

... More
Common SR 2023-24, Vol3 ItNo 3.3 Pg No.5 - Preparation of Foundation for Embankment. Scarifying Existing Granular Surface to a Depth of 50mm by Manual Means. Scarifying existing granular surface to a depth of 50mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.complete as per direction of Engineer incharge

22770

52

1195425

... More
Common SR 2023-24, Vol3 ItNo 4.13 A(c) Pg No.25 - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density i) Grading-I (63 mm to 45 mm). A.By Manual Means (c) Using Screening Type B (11.2mm agg) complete as per direction of Engineer incharge

1423.13

2959

4212393.6435

... More
Common SR 2023-24, Vol3 ItNo 4.13 (b)Pg No.26 - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density ii) A.By Manual Means. Grading-II (53 mm to 22.4 mm (b)Using Screening Type B (11.2mm agg) complete as per direction of Engineer incharge

1423.13

2886

4107793.5885



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.