Karnataka Industrial Areas Development Board Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Karnataka Industrial Areas Development Board - KIADB Tender

Electrical and Electronics
Electrical Works
Opening Date14 Mar 2022
Closing Date23 Mar 2022
Tender Amount₹ 2,35,81,996 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
b) Supply and fixing suitable size minimum 200 mm dia HGC/ Ball foot valve of any Board approved make with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

127440

... More
Sluice valve: D.I. Resilient seated soft sealing Sluice Valve Dimension as per IS: 14846/ BS: 5163, PN-10 M.O.C.:- Body - Ductile Iron, Wedge-Ductile Iron , fully vulcanized with EPDM (Food grade quality), Stem-Stainless Steel AISI: 410, Stem Nut - G.M. IS: 318 LTB-2, Gasket - EPDM Rubber Grade W-270, Stem Sealing - O-rings of NBR, suitable Bolts & Nuts, Surface Protection-Electro Static epoxy powder coating/Epoxy liquid painting both inside & outside. a)Diameter of valve: 150mm, working pressure 10kg/cm2 for delivery side with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

110625

... More
b)—do--Diameter of valve: 200mm, working pressure 10kg/cm2 for suction side with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

168150

... More
Check valves with slanted seat metallic corrosion proof and wear resistant seal faces with nickel overlay micro finished with body and disc in DI shaft of stainless steel and bearing of zinc free bronze and surface protection with epoxy liquid suitable for Working pressure 10kg/cm2 Material of construction: Body & Disc : Ductile cast iron Body seat & Disc face: Nickel weld overlay (micro finished), Shaft : Stainless steel SS-410, Coating : Double coating of epoxy liquid layer inside and outside without Damper arrangement.Diameter of valve: 150mm, working pressure 10kg/cm2 for delivery side with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

192930

... More
Pressure Gauge: Supply and delivery at site Air master/ Gurusons/ Forbes Marshal make glycerine filled Stainless steel pressure gauge of 150mm dia suitable for the above pumpsets with nipple, stop cock & two way cock for cleaning & necessary length of tubing with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

15930

... More
CONTROL SWITCH GEAR PANEL - 100 HP :Supply and delivery at site brand new any Board approved make floor mounting, free standing, cubicle type control panel board unit suitable for operation on 3 phase 50 cycles 440 volts AC supply fitted with the following:400 Amps 4P ON Load change over switch for transformer 400KVA- No. 1 and 400KVA- No. 2, 400 Amps, MCCB with RHOM - 1 no,Phase indicating lamps with switches of any Board approved make- 1 sets, Panel mounting version digital Micro processor based type Multi function meter for measuring current, Voltage, P.F, energy etc., of any Board approved make or equivalent.- 1 Nos., Digital Ammeter 0- 400Amps : 1 No, Digital Voltmeter 0-600V : 1 No, Suitable capacity Earth leakage relay - 1 No, MS air insulated bus bar chamber with 4 Nos.400 Amps Air insulated bus bar made of high conductivity, high strength aluminium alloy complying with the requirements of grade E91 E of IS 5082, suitably braced with non-hygroscopic SMS supports. Provision shall be made in the bus bar chamber for 2 incoming and 6 outgoing feeders. The bus bar chamber should be of adequate capacity to handle the incoming and out-going cables and for fixing the switchgears as per requirement-1 No., Dual parameter panel mounting version digital type energy meter/power factor meter with built in selector switch of any Board approved make- 1 No.,100 Amps TPN switch fuse unit with rewireable fuses in sheet metal enclosure conforming to the latest ISS 4064 for Capacitor circuit of any Board approved make. 3 No., 32 Amps switch fuse unit with rewireable fuses in sheet metal enclosure conforming to the latest ISS 4064 for lighting circuit of any Board approved make. 1 No., Set of cable entries and terminals suitable for numbers, type and size of aluminium conductor power cables, etc. Note :1) The panel board shall be complete with all other required fittings, and shall be fabricated using 2mm thick sheet steel and wiring shall be done using suitable size copper cable/copper wire painted with two coats of a highly corrosion resistant primer applied wet on wet and a finishing coat of synthetic enamel paint of the ash greay shade.2) H.R.C. fuse link rated not less than 1.5 times the rated current of the capacitor bank shall be provided in the suitable Amps capacity switch fuse unit for capacitor circuit.3) The internal wiring shall be done using adequate size insulated electro tinned copper strip or cable of 1.1 KV grade.4) Any discrepancies are noticed apart from tender specification, suitable action as per tender condition will be taken against the tenderer including black listing of the tenderer.5) The Bus bar chamber should be of adequate size to accommodate all incoming, outgoing cables and required switchgears with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

1

-

305030

... More
FCMA softstarter - 100 HP:Supply & delivery of 100HP /75KW soft starter based on Flux compensated magnetic amplifier technology for smooth starting by torque control and reduction in starting current etc .The starter should have 1 No-225Amps 3P Contactor for Run and 1No-150Amps 3P contactor for Start. 'the entire status of operation & fault should be displayed on a 7 segment 5 digit Digital display with its meaning on the front panel door 'Resin cast dual core Current transformers of suitable ratio, burden and class of accuracy conforming to the latest IS 2705 with 15 VA burden for protection, class 5P10 and class 1, for metering - 3 nos. '0.5-60 Secs Electronic on and off delay timer for automatic change over from reduced voltage to full voltage, - 2 No. 'Start - Stop push buttons, conforming to the latest ISS 6875 - 1 Set 'Motor ON+OFF+Startmode+Run mode Indicating lamp - 1 No/Each. 'Panel mounting version digital type Ammeter of suitable CT ratio - 1 No. 'Panel mounting version digital type Voltmeter of suitable CT ratio - 1 No. 'C.T.operated thermal over load relay - 1 No. 'Single phase preventor -1 No. 'Under/over voltage relay.- 1 No. 'Indicating lamps, RED, YELLOW AND BLUE LAMP of rating 230 volts AC - 1 Set 'Alarm bell/Hooter Ninielec suitable for 230V, AC, 50 HZ- 1 No. 'Cable box with compression type cable glands for incoming cables- 1 No. 'Cable box with compression type cable glands for out going cables- 1 No. 'Aux relay for Hooter for acceptance and cancellation- 1 No. 'Control terminals and power terminals- 1 Set, 'NOTE: 1. The starter panel shall be fabricated using 16 SWG sheet,steel Square tubes and suitable size angle iron. '2. All copper joints shall be electro tinned. ' 3. The control wiring shall be done using 1100 volts grade adequate size multicore copper cable. ' 4. All the control wiring shall be properly ferruled. ' 5. The circuit shall be designed for close transition using KORNDOREER Principle and should ensure smooth change over from tap voltage to the full voltage without any momentary interruption in power supply to the motor. ' 6. The starter panel is required for installation at an altitude not exceeding 900 m above MSL and the maximum ambient air temperature of 45 degree C. ' 7. The starter panel shall be complete with all other required fitting and first fillings of oil. ' 8. The panel shall be designed to conform to the requirement of the latest IS , factory built assembly of switch gears and control gears. ' 9. The inter connections shall be done using adequate size insulated electrolytic copper strip and copper cable. '10. The Starter shall be suitable for Six starts per hour. '11. The Painting should be done using Seven tank process. 12.Paint shade should be Grey(RAL 7032) Doors should be powder coated and frame should be painted. 13. Ingress protection of IP55 with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

1107312

... More
Automatic Power factor control panel:-Supply, delivery, fixing and commissioning at site brand new Board approved make or any other make approved by the Board floor mounting, free standing, cubicle type APFC panel board unit suitable for operation on 3 phase 50 cycles 400/440 volts AC supply fitted with the following: 320 amps MCCB with fixed and moving contracts fitted with U/V release, shunt release and with suitable thermal release.- 1 No. Suitable capacity contactors with suitable capacity HRC fuses. 40 KVAR all polypropylene type capacitors for one 100HP pump out of 3 nos pumpsets. The capacitor banks shall be suitable for operating pumpsets in solo or parallel operation . The total KVAR required is 120 KVAR for 3 nos 100HP pumps working at a time., the banks shall be decided after finalisation of the pumpsets. Phase indicating lamps- 1 set. Suitable protection against overload, overcurrent, over and under voltage, single phasing etc., trip indication / fault indication . Digital type Ammeter with selector switches. Digital type Voltmeter with selector switches. suitable capacity current transformers. The panel shall be adequate to handle incoming and outgoing cables. Timers, automatic power factor controller unit of suitable capacity shall be provided with 6 taps (contactors) which can switch on the individual bank of capacitor such that the power factor shall not be less than 0.9 lag. The connection of the APF panel shall be such that when working on D.G set, the supply to this panel shall be switched off. Erection of APFC Panel: on CC foundation including formation of CC foundation in CC 1:2:4 prop. Using all the required materials such as cement, jelly etc., complete including erection of the panel board, on CC foundation using required materials such as MS channel bolts, nuts, washers etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

1

-

276120

... More
CHAIN LINKED WIRE FENCING : Supply & providing chain linked wire fencing for 11 KV transformer sub-station. The chain linked fencing should be with 2"x2"x8 SWG wire welded with angle iron frames of size 2.5mx2.5m using angle of using 50x50x6mm. The frame be fixed to be supporting channel spacing at 2.5 M size 100x50mm transportation and labour for fixing silver painting etc., complete with door with 2.5m size at suitable place as directed by EIC with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

60

-

545160

... More
Erection of Starters:Formation of suitable foundation CC 1:2:4 using all the required materials such as cement, sand, jelly etc., complete and erection of starters on the above foundation using the required materials such as bolts, nuts washers etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

17700

... More
Erection of Control Panel Board on CC foundation including formation of CC foundation in CC 1:2:4 prop. using all the required materials such as cement, jelly etc., complete including erection of the panel board, on CC foundation using required materials such as MS channel bolts, nuts, washers etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

1

-

9440

... More
Erection of pumpsets: Formation of suitable block machine foundation in CC 1:2:4 confirming to the latest ISS 2974 using all the required materials such as cement, sand, jelly etc., complete including necessary earth work refilling curing etc., complete. Erection of the pumpset mounted on the common baseplate on the above foundation using the required material such as foundation bolts, key locks, self interlocking bolts, washer etc., complete levelling, aligning of the pumpsets on the foundation grounding and dynamic balancing using all the required materials including excavation for foundation making pump pits, dewatering etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

94872

... More
Dismantling of Pumpsets, Control Panels and Starters: Dismantling of existing 100HP pumpset, Control panel and starters including dismantling the pump base bolts, motor base bolts, base plate, coupling, removing the suction & delivery flanges. Removing the rushed/damaged bolt nuts by using gas cutting, chipping wherever necessary & making the site suitable for erection of new pumpset etc as per direction of the Engineering chart of the work, dismantling the existing system without interrupting the water supply with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

70800

... More
Cable Terminations: Termination of cable using Aluminium lugs to the terminal end for solder less crimping to aluminium conductors by adopting crimping tool with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

1

-

10856

... More
Earthing: Providing earthing as per latest IS 3043, and the work shall include the following: Supply and providing, earthing electrodes comprising of GI pipe 40mm dia 2.9 mm thick 2.5 mtrs long, the pipe shall have 16 through holes of 12mm dia staggered along the length of the pipe as per ISS suitable length 19mm dia GI pipe provided with mesh covered funnel GI bolts, nuts washers, check nuts, at one end and coupled to main electrodes through a 40mmx19mm GI conduct at the other end Digging 300mm dia earthing pits to suitable depth for burring the main electrodes in the pit. The pit shall be filled with alternate layers of salt and charcoal 150mm thick around the pipe to the entire depth. An inspection chamber of 300x300x300mm size shall be constructed with CC 1:3:6 prop., 150mm thick for sides and 100mm thick at bottom. The chamber shall be provided with CI/MS cover hinged to the frame. The electrical equipment shall be connected to the earth pit through 25mmx11 mm size pure electrolytic copper strip or 25x6mm size GI strip for equipment earthing as directed by EIC.(approximate length 60 meters) with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

22

-

227150

... More
De silting :Removing/ Desilting of muddy soil accumulated in the Jackwell/ sump tank using necessary toos and plant using desilting pump and JCB etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

1

-

70800

... More
Servicing and commissioning: The pumpsets along with all other electrical equipments shall be serviced and commissioned in the presence of the Engineer-in-charge of The work shall include the followingProviding operating and maintenance manuals of the pumps and allied equipments to the operating personnel.Giving trail run of the pumpset and should train the Board Staff to operate the pumpsets.NOTE:1. The energy and water will be provided by the Board free of cost.2. The pumpsets along with all the electrical equipments shall be commissioned only when the performance of switch gears, relays in presence of the manufacturer with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

1

-

35400

... More
Supply of 11kV 400A D/B GOS with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

52635

... More
Fixing of 11kV 400A D/B GOS with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

2331

... More
Supply of H-Frame for mounting GOS with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

11172

... More
Fixing of H-Frame for mounting GOS with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

630

... More
Supplying of 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated, PVC extruded Inner sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness in average +5% and resistivity 14 Ohms/Kms (Max) as per IS-3975 with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 3.5 core 240sqmm

800

-

1012480

... More
Labour charges for laying of 1.1 KV class UG cable in existing trench GI pipe / stoneware pipe / on wall / on pole as required with all lead and lifts complete as per specifications and directions of engineer in charge of the work. In existing trench/duct. 185sqmm to 240 Sqmm

800

-

31360

... More
Digging of trench of 0.6m deep x 0.50 mtr wide refilling the trench to the required ground level and consolidating etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work. In soil (ordinary)

800

-

68096

... More
Supplying tinned copper lugs and crimping and wiring to terminal point for wire of size 240 sqmm Long Barrel with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

22

-

11408.32

... More
240HP WTP Pumps: Supply & delivery at site brand new, best efficient make approved by the Board horizontal multi stage centrifugal pump conforming to the latest IS 1520 & IS 5120 and the following descriptiona) Duty condition: Capable of delivering 69.44 LPS(250m3/Hr) of Treated water containing turbidity upto 10 ppm against a total head of 160 m in solo operation.b) Speed: Duty condition should be met at 1480 RPM.c) Shutt off head: Min 110 % & Max 130 % of the specified head.d) Material of construction:1) Casing- Cast Iron2)Impellor–Bronze/CF 8M 3) Shaft- Stainless steel shaft- SS 4104) Stuffing Box- Graphite Asbestos packing5) Gland- Cast Iron6) Shaft Sleeve & Nuts- SS 4107) Neck ring- Bronze8) No of stages – 5 , e) Coupling: Suitable size vibration proof flexible coupling with coupling guard, as recommended by the manufacturer of pump, for coupling to motor.f) Base plate: Heavy duty common CI/MS base plate for pump and motor wth suitable I section girders, channels, plates, bolts & nuts etc.NOTE: (1) The duty condition of the pump should be at BEP or to the left of the BEP.(2) The pump is required to work at an altitude of 800m. above MSL and at a max. ambient temperature of 45 degree C.(3) The Board reserves the right to select any stipulated make of pump with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

5239200

... More
Motor: 180Kw (240HP) or Suitable HP any make approved by the Board Horizontal Foot mounted SPDP/TEFC, squirrel cage induction 1480 RPM (syn)motor for continuous duty conforming to IS 4691 and IS 325 for operation on 3 ph, 50 Hz. 430 volts.a) Protection: IP 23/IP 55, b) Insulation: `F' class, c) Ambient temperature: Upto 45 Degree C, d) Cushion: 10 % more than maximum power required by the pump and capable of providing rated output upto + or - 10% voltage variation and/or + or - 3% frequency variation or combination of Both with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

2761200

... More
DOUBLE FLANGED PIPES & SPECIALS: a)Supply, delivery, Erection welding and fitting with bolt and nuts at site brand new best indegenous make double flanged Mild Steel 8.00 mm thick pipes & specials suitable for test pressure equivalent to twice the working pressure. The Welding should be done as per IS 2825-1969. The thickness of flanges should conform to IS 6392-1971. The specials should conform to ANSI 16.9. with 200mm or 150-mm dia MS Pipes with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

164610

... More
b) Supply and fixing suitable size minimum 200 mm dia HGC/ Ball foot valve of any Board approved make with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

127440

... More
c)Delivery Manifold :Supply, delivery, Erection welding and fitting with bolt and nuts at site brand new best indegenous make double flanged Mild Steel 8.00 mm thick pipes & specials suitable for test pressure equivalent to twice the working pressure. The Welding should be done as per IS 2825-1969. The thickness of flanges should conform to IS 6392-1971. The specials should conform to ANSI 16.9.M.S. pipe manifold of 8 mm wall thickness and 400 mm dia with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

1

-

76700

... More
Sluice valve: D.I. Resilient seated soft sealing Sluice Valve ,Face to Face Dimension as per IS: 14846/ BS: 5163, PN-16 M.O.C.:- Body - Ductile Iron, Wedge-Ductile Iron , fully vulcanized with EPDM (Food grade quality), Stem-Stainless Steel AISI: 410, Stem Nut - G.M. IS: 318 LTB-2, Gasket - EPDM Rubber Grade W-270, Stem Sealing - O-rings of NBR, suitable Bolts & Nuts, Surface Protection-Electro Static epoxy powder coating/Epoxy liquid painting both inside & outside. a) Diameter of valve: 150mm, working pressure 16kg/cm2 for delivery side with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

128325

... More
b)---do---Diameter of valve: 200mm, working pressure 16kg/cm2 for suction side with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

186487.2

... More
c) ---do---Diameter of valve: 400mm, working pressure 16kg/cm2 for manifold with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

1

-

460554

... More
Check valves with slanted seat metallic corrosion proof and wear resistant seal faces with nickel overlay micro finished with body and disc in DI shaft of stainless steel and bearing of zinc free bronze and surface protection with epoxy liquid suitable for Working pressure 16kg/cm2 Material of construction: Body & Disc : Ductile cast iron Body seat & Disc face: Nickel weld overlay (micro finished), Shaft : Stainless steel SS-410, Coating : Double coating of epoxy liquid layer inside and outside without Damper arrangement with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

192930

... More
Pressure Gauge: Supply and delivery at site Air master/Gurusons/Forbes/Delta Marshal make glycerene filled Stainless steel pressure gauge of 150mm dia suitable for the above pumpsets with nipple, stop cock & two way cock for cleaning & necessary length of tubing with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

15930

... More
CONTROL SWITCH GEAR ACB PANEL for 240HP:Supply and delivery at site brand new any Board approved make floor mounting, free standing, cubicle type control panel board unit suitable for operation on 3 phase 50 cycles 440 volts AC supply fitted with the following:1000 Amps 3P Fixed Type TM Air Circuit Breakerfor 630KVA transformer incoming - 1 no, 630 Amps 3P Fixed Type TM Air Circuit Breakerfor 400KVA transformer incoming - 1 no, Phase indicating lamps with switches of any Board approved make- 1 sets, Panel mounting version digital Micro processor based type Multi function meter for measuring current, Voltage, P.F, energy etc., of any Board approved make or equivalent.- 1 Nos. Digital Ammeter 0-1000 Amps - I No, 0-600 Amps -1 No, Digital Voltmeter 0-600V - 2 Nos, Suitable capacity Earth Leakage relay - 2 Nos, MS air insulated bus bar chamber with 4 Nos.1000 Amps Air insulated bus bar made of high conductivity, high strength aluminium alloy complying with the requirements of grade E91 E of IS 5082, suitably braced with non-hygroscopic SMS supports. Provision shall be made in the bus bar chamber for 2 incoming and 9 outgoing feeders. The bus bar chamber should be of adequate capacity to handle the incoming and out-going cables and for fixing the switchgears as per requirement-1 No, Dual parameter panel mounting version digital type energy meter/power factor meter with built in selector switch of any Board approved make- 1 No, 200 Amps TPN switch fuse unit with rewireable fuses in sheet metal enclosure conforming to the latest ISS 4064 for Capacitor circuit of any Board approved make. 3 No, 63 Amps ON Load change over switch fuse unit with rewireable fuses in sheet metal enclosure conforming to the latest ISS 4064 for lighting circuit of any Board approved make. 1 No, Set of cable entries and terminals suitable for numbers, type and size of aluminium conductor power cables, etc. Note :1) The panel board shall be complete with all other required fittings, and shall be fabricated using 2mm thick sheet steel and wiring shalll be done using suitable size copper cable/copperwire painted with two coats of a highly corrosion resistant primer applied wet on wet and a finishing coat of synthetic enamel paint of the ash greay shade. 2) H.R.C. fuse link rated not less than 1.5 times the rated current of the capacitor bank shall be provided in the suitable Amps capacity switch fuse unit for capacitor circuit. 3) The internal wiring shall be done using adequate size insulated electro tinned copper strip or cable of 1.1 KV grade. 4) Any discrepancies are noticed apart from tender specification, suitable action as per tender condition will be taken against the tenderer including black listing of the tenderer. 5) The Bus bar chamber should be of adequate size to accommodate all incoming, outgoing cables and required switchgears with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

1

-

858597.5

... More
FCMA softstarter - 240 Supply & delivery of 240HP /180KW soft starter based on Flux compensated magnetic amplifier technology for smooth starting by torque control and reduction in starting current etc .The starter should have 1 No-500Amps 3P Contactor for Run and 1No-265Amps 3P contactor for Start. 'the entire status of operation & fault should be displayed on a 7 segment 5 digit Digital display with its meaning on the front panel door 'Resin cast dualcore Current transformers of suitable ratio, burden and class of accuracy conforming to the latest IS 2705 with 15 VA burden for protection, class 5P10 and class 1, for metering - 3 nos. '0.5-60 Secs Electronic on and off delay timer for automatic change over from reduced voltage to full voltage, - 2 No. 'Start - Stop push buttons, conforming to the latest ISS 6875 - 1 Set 'Motor ON+OFF+Startmode+Run mode Indicating lamp - 1 No/Each. 'Panel mounting version digital type Ammeter of suitable CT ratio - 1 No. 'Panel mounting version digital type Voltmeter of suitable CT ratio - 1 No. 'C.T.operated thermal over load relay - 1 No. 'Single phase preventor -1 No. 'Under/over voltage relay.- 1 No. 'Indicating lamps, RED, YELLOW AND BLUE LAMP of rating 230 volts AC - 1 Set 'Alarm bell/Hooter Ninielec suitable for 230V, AC, 50 HZ- 1 No. 'Cable box with compression type cable glands for incoming cables- 1 No. 'Cable box with compression type cable glands for out going cables- 1 No. 'Aux relay for Hooter for acceptance and cancellation- 1 No. 'Control terminals and power terminals- 1 Set 'NOTE: 1. The starter panel shall be fabricated using 16 SWG sheet,steel Square tubes and suitable size angle iron. '2. All copper joints shall be electro tinned. ' 3. The control wiring shall be done using 1100 volts grade adequate size multicore copper cable. ' 4. All the control wiring shall be properly ferruled. ' 5. The circuit shall be designed for close transition using KORNDOREER Principle and should ensure smooth change over from tap voltage to the full voltage without any momentory interruption in power supply to the motor. ' 6. The starter panel is required for installation at an altitude not exeeding 900 m above MSL and the maximum ambient air temperature of 45 degree C. ' 7. The starter panel shall be complete with all other required fitting and first fillings of oil. ' 8. The panel shall be designed to conform to the requirement of the latest IS , factory built assembly of switch gears and control gears. ' 9. The inter connections shall be done using adequate size insulated electrolytic copper strip and copper cable. '10. The Starter shall be suitable for Six starts per hour. '11. The Painting should be done using Seven tank process. 12.Paint shade should be Grey(RAL 7032) Doors should be powder coated and frame should be painted. 13. Ingress protection of IP55 with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

1653180

... More
Automatic Power factor control panel:-Supply, delivery, fixing and commissioning at site brand new Board approved make or any other make approved by the Board floor mounting, free standing, cubicle type APFC panel board unit suitable for operation on 3 phase 50 cycles 400/440 volts AC supply fitted with the following: 320 amps MCCB with fixed and moving contracts fitted with U/V release, shunt release and with suitable thermal release.- 1 No. Suitable capacity contactors with suitable capacity HRC fuses. 100 KVAR all polypropelene type capacitors for one 240HP pump out of 3 nospumpsets. The capacitor banks shall be suitable for operating pumpsets in solo or parallel operation . The total KVAR required is 300 KVAR for 3 nos240 HP pumps working at a time., the banks shall be decided after finalisation of the pumpsets. Phase indicating lamps- 1 set. Suitable protection against overload, overcurrent, over and under voltage, single phasing etc., trip indication / fault indication . Digital type Ammeter with selector switches. Digital type Voltmeter with selector switches. suitable capacity current transformers. The panel shall be adequate to handle incoming and outgoing cables.Timers, automatic powerfactor controller unit of suitable capacity shall be provided with 6 taps (contactors) which can switch on the individual bank of capacitor such that the powerfactor shall not be less than 0.9 lag. The connection of the APF panel shall be such that when working on D.G set, the supply to this panel shall be switched off.Erection of APFC Panel: on CC foundation including formation of CC foundation in CC 1:2:4 prop. Using all the required materials such as cement, jelly etc., complete including errection of the panel board, on CC foundation using required materials such as MS channel bolts, nuts, washers etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

1

-

554600

... More
CHAIN LINKED WIRE FENCING : Supply & providing chain linked wire fencing for 11 KV transformer sub-station. The chain linked fencing should be with 2"x2"x8 SWG wire welded with angle iron frames of size 2.5mx2.5m using angle of using 50x50x6mm. The frame be fixed to be supporting channel spacing at 2.5 M size 100x50mm rails transportation and labour for fixing silver painting etc., complete with door with 2.5m size at suitable place as directed by EIC with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

60

-

545160

... More
Erection of Starters:Formation of suitable foundation CC 1:2:4 using all the required materials such as cement, sand, jelly etc., complete and erection of starters on the above foundation using the required materials such as bolts, nuts washers etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

17700

... More
Erection of Control Panel Board on CC foundation including formation of CC foundation in CC 1:2:4Erection of Control Panel Board on CC foundation including formation of CC foundation in CC 1:2:4 prop. using all the required materials such as cement, jelly etc., complete including erection of the panel board, on CC foundation using reqired materials such as MS channel bolts, nuts, washers etc.,with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

1

-

9440

... More
Erection of pumpsets: Erection of pumpsets: Formation of suitable block machine foundation in CC 1:2:4 confirming to the latest ISS 2974 using all the required materials such as cement, sand, jelly etc., complete including necessary earth work refilling curing etc., complete. Erection of the pumpset mounted on the common baseplate on the above foundation using the required material such as foundation bolts, key locks, self interlocking bolts, washer etc., complete levelling, aligning of the pumpsets on the foundation grounding and dynamic balancing using all the required materials including excavation for foundation making pump pits, dewatering etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

123900

... More
Dismantling of Pumpsets, Control panels and starters: Dismantling of exsisting 240HP pumpset, Control panel and starters including dismantling the pump base bolts, motor base bolts, base plate, coupling, removing the suction & delivery flanges. Removing the rushed/damaged bolt nuts by using gas cutting, chipping wherever necessary & making the site suitable for erection of new oumpsetetc as per direction of the Engineering chart of the work, dismantling the exsisting system without interrupting the water supply with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

53100

... More
Cable Terminations: Termination of cable using Aluminium lugs to the terminal end for solderless crimping to aluminimum conductors by adopting crimping tool with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

1

-

17110

... More
Earthing: Providing earthing as per latest IS 3043, and the work shall include the following: Supply and providing, earthing electrodes comprising of GI pipe 40mm dia 2.9 mm thick 2.5 mtrs long, the pipe shall have 16 through holes of 12mm dia staggered along the length of the pipe as per ISS suitable length 19mm dia GI pipe provided with mesh covered funnel GI bolts, nuts washers, check nuts, at one end and coupled to main electrodes through a 40mmx19mm GI conduct at the other endDigging 300mm diaearthing pits to suitable depth for buring the main electrodes in the pit. The pit shall be filled with alternate layers of salt and charcoal 150mm thick around the pipe to the entire depth. An inspection chamber of 300x300x300mm size shall be constructed with CC 1:3:6 prop., 150mm thick for sides and 100mm thick at bottom. The chamber shall be provided with CI/MS cover hinged to the frame.The electrical equipment shall be connected to the earth pit through 25mmx11 mm size pure electrolytic copper strip or 25x6mm size GI strip for equipment earthing as directed by EIC.(approximate length 60 meters)

22

-

227150

... More
Desilting :Removing/ Desilting of muddy soil accumulated in the Jackwell/ sump tank using necessary toos and plant using desilting pump and JCB etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

1

-

70800

... More
Servicing and commissioning: The pumpsets along with all other elecricalequipments shall be serviced and commissioned in the presence of the Engineer-in-charge of The work shall include the followingProviding operating and maintenance manuals of the pumps and allied equipments to the operating personnel.Giving trail run of the pumpset and should train the Board Staff to operate the pumpsets.NOTE:1. The energy and water will be provided by the Board free of cost.2. The pumpsets along with all the electrical equipments shall be commissioned only when the performance of switch gears, relays in presence of the manufacturer with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

1

-

35400

... More
Supply of 11kV 400A D/B GOS with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

52635

... More
Fixing of 11kV 400A D/B GOS with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

2331

... More
Supply of H-Frame for mounting GOS with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

11172

... More
Fixing of H-Frame for mounting GOS with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

3

-

630

... More
Supplying of 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated, PVC extruded Inner sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness in average +5% and resistivity 14 Ohms/Kms (Max) as per IS-3975 with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 3.5 core 240sqmm

800

-

1012480

... More
Labour charges for laying of 1.1 KV class UG cable in existing trench GI pipe / stoneware pipe / on wall / on pole as required with all lead and lifts complete as per specifications and directions of engineer in charge of the work. In existing trench/duct. 185sqmm to 240 Sqmm

800

-

31360

... More
Digging of trench of 0.6m deep x 0.50 mtr wide refilling the trench to the required ground level and consolidating etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work. In soil (ordinary)

800

-

68096

... More
Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the size 240 sqmm Long Barrel with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

22

-

11408.32

... More
Supplying and fixing of heavy duty cable glands suitable for UG cable of 1.1 KV class (metal only) 100mm dia with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

10

-

10808

... More
WTP & Gorur Pumphouses & security room Wiring : Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 2.5 Sqmm

800

-

28672

... More
Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure with all lead and lifts complete as per specifications and directions of engineer in charge of the work. Single Door 8Way SP &N

6

-

6451.2

... More
Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' type curve, indicator ON/OFF, energy cross-3 with short circuit breaking capacity of 10K and complete wiring as required confirming toIEC 60898 with all lead and lifts complete as per specification and direction of Engineer-in-charge of the work. 6-32Amps SP

12

-

5832.96

... More
Supplying of 2x 4'feet - PVC Batten with integrated LED tube 20 /22 W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI > 80. Power Input: 220-240V @ 50/60Hz & Power factor >0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition with all lead and lifts complete as per specifications and directions of engineer in charge of the work. LED light fighting 2x 4' - 20 /22 w

48

-

33600

... More
Supplying heavy gauge PVC conduit pipe 19/20mm dia2 mm thick confirming to IS 2509 with suitable size bends, metal/PVC junction boxes, adhesive paste etc., and runningmbefore concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 19/20mm dia2 mm thick with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

500

-

22400

... More
Supplying heavy gauge PVC conduit pipe 25mm dia 2 mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc., and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using yheavy guage saddles at an interval of 700mm using NF screws with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

200

-

14560

... More
Supplying PVC/GI flexible conduit pipe 25mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300mm using NF screws and on either end of the pipe terminated with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 25 mm dia

200

-

6272

... More
Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block complete for each outlet with all lead and lifts complete as per specifications and directions of engineer in charge of the work. Three outlet in a row, above 6Mts upto 10Mtr from tapping point to out let via switches

6

-

5040

... More
Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block complete for each outlet with all lead and lifts complete as per specifications and directions of engineer in charge of the work. Two outlet in a row, above 3Mtr upto 6Mtr from tapping point to out let via switches.

6

-

3528

... More
Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block complete for each outlet. Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch PWD ele Pg.5 It 2.1.2

12

-

3696

... More
Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block complete for each outlet with all lead and lifts complete as per specifications and directions of engineer in charge of the work. Long point above 6Mtr upto 10Mtr from tapping point to out let via switch box.

6

-

2688

... More
Supplying 6A flush type socket and 6 amps flush type SP switch either surface/flush mounting in existing gang box or in 4mm thick plastic sheet and fixing over a flush mounted wooden box and wiring using necessary capacity wires as required as per IS 1293 and IS 3654 with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 6Amps 3/5 Way

6

-

887.04

... More
EARTHINGS FOR PUMPSET, LT PANEL, STARTERS & PUMPHOUSE: Supplying fixing and wiring earth electrode for grounding of lifts, transformers, DG sets etc. using 40mm dia 2.9mmn thick 2.5 mtr long GI pipe with GI funnel with mesh and suitable size reducer fixed on the top of the earth electrode. The funnel should be enclosed in a CC chamber of 400x400x400mm with a cast iron cover. The earth electrode shall have staggered holes of 12mm dia and the electrode should be covered 150mm all-round with alternate layers of salt and charcoal from the bottom of the CC chamber. The connection from the electrode is to be established through GI strip using GI bolts and nuts with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

4

-

18592

... More
Supplying and running of GI strips for grounding connections, using necessary fixing materials as required 50 x 6mm GI Strip with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

40

-

8736

... More
Digging of pit.For providing GI pipe type earthing with all lead and lifts complete as per specifications and directions of engineer in charge of the work. Ordinary Soil

4

-

2253.44

... More
Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293 with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 32Amps DP switch

12

-

2446.08

... More
Supplying and fixing 6Amps backelite ceiling rose & electrical accessories on existing switch board with all lead and lifts complete as per specification and direction of Engineer-in-charge of the work. 6Amps backelite ceiling rose

20

-

1299.2

... More
Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 48" Sweep (1200mm) Regular model

8

-

18726.4

... More
Supplying and replacing ceiling fan regulator 900mm to 1500mm with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

8

-

1541.12

... More
Supplying and fixing "S" hook made out of 14mm dia M.S rod with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

8

-

304.64

... More
Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293 with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 6Amps one way Switch

40

-

3136

... More
Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293 with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 6/16Amps universal socket.

12

-

2177.28

... More
Providing Streetlights to WTP & Gorur Pumphouses : Supplying: of 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated, PVC extruded Inner sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness in average +5% and resistivity 14 Ohms/Kms (Max)as per IS-3975 with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 3.5 core 25 sqmm

725

-

146160

... More
Labour charges for laying of 1.1 KV Class UG cable in existing trench GI pipe/stone ware pipe/on wall/on pole as required with all lead and lifts complete as per specifications and directions of engineer in charge of the work. In existing trench /duct 25sqmm – 75 Sqmm

675

-

11718

... More
Labour charges for laying of 1.1 KV Class UG cable in existing trench GI pipe/stone ware pipe/on wall/on pole as required with all lead and lifts complete as per specifications and directions of engineer in charge of the work. On wall/ Structure 25sqmm – 75 Sqmm

50

-

1960

... More
Digging of trench of 0.6m deep x 0.50 mtr wide refilling the trench to the required ground level and consolidating etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work. In Soil (Ordinary)

675

-

57456

... More
Digging of trench of 0.6m deep x 0.50 mtr wide refilling the trench to the required ground level and consolidating etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work. In Asphalt cutting

50

-

6328

... More
Supplying & fixing L.T. cast Iron pot heads suitable for 1.1 KV class UG cable filled with necessary bitumen/insulating compound complete with terminals, clmaps, bolts, nuts and washers etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 25 sq.mm

2

-

784

... More
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694: confirming to latest amendments with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 2.5 Sqmm

500

-

17920

... More
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694: confirming to latest amendments with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 6 Sqmm.

50

-

3920

... More
Supply and fixing polished wood board made of not less than 15 mm thick plank on both sides of not more than 2 pieces and fixing the same to the wall using tapered inverted wooden plugs screws etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work. (20” X 20” X 2.5”)

2

-

654.08

... More
Supplying and fixing of porcelain fuse channel with cutout on existing wooden/ panel using necessary nuts, bolts, & washers etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 63 Amps.

12

-

3050.88

... More
Supplying and fixing of class ‘A’ (Medium duty) GI pipe of wall thickness not less than 3.25 mm on pole/wall/drain crossing with necessary clamping arrangements for UG cable of 1.1 KV with all lead and lifts complete as per specifications and directions of engineer in charge of the work. class 50 mm dia.

40

-

17024

... More
Fabricating, supplying and erection of 9 mtrs long hot dip galvanized octagonal pole with BSEN 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangements, including suitable boards, Bakelite sheet and MCBs as per IS Specifications suitable to withstand the wind speed of 47m/sec for 9 Mtrs pole in single sectin and single joint welded as per IS 9595/ IS 10178AWS having dimensions bottom dia 155mm top dia 70mm with 3 mm thick suitable base plate of size 260mm x 260 x 16mm and 4 Nos of M 24 x 750 mm long J bolts and nuts along with template and the pole shall be hot dip galvanized in single dipping with not less than 65 micron as per ASTM-A123 and 153 etc., (Excluding foundation) as per drawing with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 9mtrs Top 70mm dia and bottom 155mm dia

15

-

253075.2

... More
Supplying and fixing hot dip galvanized M.S. bracket suitable for outdoor luminaries and mounted on octogonal pole using necessary bolts, nuts etc.,.with all lead and lifts complete as per specifications and directions of engineer in charge of the work. Single arm bracket with 1500mm standard 40/50mm dia.

15

-

35481.6

... More
Supply of LED Streetlight luminaire with pressure die castaluminium housing body for optimal thermal dissipation.Lamp compartment comprising of anti glare clear diffuserwith Injection moulded polycarbonate material, deliveringsuperior light output. Rated life Burning Hrs 50000 hr @Lumen Maintenance of 70%, maximum light intensity shouldbe between 60 degrees to 70 degrees. CCT > 5500K, IP66 optical and electrical compartment & impact resistanceof complete luminaire > IK08. Power Factor >0.9 withmains, Surge Protection- Min 5KV along with Over voltage/Overload, short circuit/ miss-wiring protection. Compatiblefor pole mouting with outer dia of 40mm to 50mm. UniversalVoltage driver to operate wide voltage range from 100V to270V 50/60Hz application. Compliance to IS 10322/IEC60598, LM 79 & LM 80 Adherence with RoHS. UL approvedMCPCB. Top access street light with single screw to ensureease of maintenance at the sight site location with minimizedminimal tools. LED Light fixture with 120.W System Powerconsumption. LED Efficiency>130lm/w, nominal CRI >75.Luminaire manufacturer should have in-house facilityaccredited by NABL/CPRI & any Government certifiedagency & Design & Development facility certified by ISO9001:2008 . Housing with supplier word mark /name shallbe Engraved / Embossing on the die cast housing/ Bodypart. Warranty of 2 Years against any manufacturing defectworking under standard electrical conditions as mentionedabove should be given by LED manufacturer & Cree /Nichia /Lumiled /Osram make LED Source with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 120 W

15

-

154560

... More
Fabricating supplying and mounting MS box made out 18 SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 18 SWG

50000

-

17000

... More
Supplying, fixing, wiring, earth electrode for grounding conduits IC cutouts and other equipment on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5 mts long buried in a pit. The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per ISI specification 7.3.3 of IS 732 using 12mm dia bolts, nuts washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

4

-

13438.64

... More
Supplying and fixing miniature circuit breakers/Isolators on existing MCB distribution boards using necessary fixing materials and 'C' type curve, indicator ON/OFF, energy cross-3 with short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898 with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 40A TPN

4

-

10635.52

... More
Supplying and fixing 4 pole power contactor with NO/NC contracts on existing wood/panel board using necessary bolts, nuts, washers and wiring etc., complete with AC-3 rating and as per IS-13947 with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 40 Amps

4

-

8243.2

... More
Supplying and fixing microprocessor based electronic timer (without contactor, Din mounting using necessary bots, nuts, and washer etc.,) 3-120 Sec settingwith all lead and lifts complete as per specifications and directions of engineer in charge of the work.

4

-

8624

... More
Supplying 100 amps rated 3 phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeves, mounted on phenolic /FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specifications with necessary bolts, nuts and washers etc., with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 100Amps 4x30x6mm aluminium strips.

4

-

9184

... More
Supplying and fixing angle frame work fabricated out of M.S. Angle iron and M.S. flat with bolts, washers ec., and painted with 2 coats of red oxide and then 2 coats of approved paint with all lead and lifts complete as per specifications and directions of engineer in charge of the work. 40 x 40 x 6 mm.

4

-

1142.4

... More
KSRB 4-1.3 : Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180kgs,with 40mm and down size graded granite metal coarse aggregates @0.85cum and fine aggregates @ 0.57cum machine mixed,machine mixed, concrete laid in layers not exceeding 15cms. Thick, well compacted, in foundation,including cost of all materials, labour, HOM curing with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

1

-

5901.28

... More
KSRB 4-1:6: Providing and laying in position plain cement concrete of mix 1:2:4 at OPC 240kgs, using 40mm & down size graded granite metal coarse aggregates at 0.878 cum and fine aggregate at 0.459cum, machine mixed concrete laid in layers not exceeding 15cms., thick, well compacted, in foundation including cost of all materials, labour, HOM curing with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

10

-

61040

... More
KSRB 4.9.2 : Providing T.M.T. Steel reinforcement Fe 500 for R.C.C. work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour HOM of machinery with all lead and lifts complete as per specifications and directions of engineer in charge of the work. TMT bars Fe 500

0.25

-

20180.16

... More
Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the size 25 Sqmm Long Barrel with all lead and lifts complete as per specifications and directions of engineer in charge of the work.

150

-

3360



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.