Indian Oil Adani Gas Private Limited Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Indian Oil Adani Gas Private Limited - IOAGPL Tender

Services
Civil And Construction
Pipe Line Project
Eprocure
Opening Date23 Jul 2024
Closing Date1 Aug 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Route survey of allotted areas and Preparation /Submission of detailed route plan for approval by EIC in AutoCAD format. Receiving, handling, loading, transportation and unloading of owner supplied MDPE pipes & fittings and other free issue items from IOAGPL designated stock yards to Contractor's own stock-yards/ work-sites. Proper storing, stacking, identification, providing security and insurance cover for the materials. Proper storing, stacking, identification, providing security and insurance cover for the materials. Making trial pits to determine the underground utilities/ services etc., restoration of the abandoned excavation/ trial pits (excavated to depth of 1.00 m or more as per satisfaction to EIC) to original condition, barricading the work area as per the procedures & drawings provided in the tender and as per the directions of EIC / Site-in-charge; uncoiling / stringing of pipes, jointing of the pipe ends/ fittings / Transition fittings/ valves by qualified personnel, using approved electro fusion techniques as per specification.. Entire work shall be executed as per scope of work, specification, PNGRB T4S and/or any other specification as per requirement of statutory authorities.

-

-

-

... More
Installation of Gl sleeves, 2.5" NB x 300 mm length pipe sleeve/ half round concrete sleeves for domestic connections, 3" NB x 300 mm length Gl sleeve for commercial and industrial installations, excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, fixing of the sleeves/RCC Half Round Guard with concrete mix, preparation of pedestal & restoration of excavated pits within the size of pedestal & the same pit with the laying of 20/32 mm dia MDPE pipe as defined in scope of work, technical specification and instruction of ElC/ SIC.

-

-

-

... More
Carrying out GIS Data Collection & Entry at every 12 meters, Pipe fittings / Cut Points /Joints/Crossings/Valves/SR etc. (Latitude / Longitude) With attributes as per satisfaction of Owner and / Or as directed by Engineer I/C. Submission of Data in the GIs format of. Shp,. Kml. Accuracy of the collection of assets / Cut points/ Joints to be in accuracy to be maintained 30cm -60cm. Using Hardware Components like - GNSS Receiver’s - Arrow 100 GNSS Receiver / Spectra Precision Sp20 Receiver / Trimble R2 / Trimble R1 Receiver having Capability to get submeter accuracy 30cm -50cm or better with Indian SBAS-GAGAN Satellite or RTK in Real-time along with Field replaceable Battery in the device. Software Components - Data collection via Mobile application: To digitize the collection of data during construction and provide real-time data in the field.

-

-

-

... More
Flushing, cleaning, pneumatic testing, purging with nitrogen and commissioning as per scope of work, specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per instructions of the EIC/ SIC. Maintaining the completed pipelines/ installation for any defect, failures during defect liability period.

-

-

-

... More
Handing over the completed works to owner for their operation/ use, returning of all surplus material to owner stores, reconciliation of free issue material area wise and obtaining no objection certificate.

-

-

-

... More
On completion of gas charging of pipelines, preparation and submission of as-built drawings, crossings details, termination, utility graphs and deviation statements. Submission of all documents required for contract closure in numbers as mentioned in contract.

-

-

-

... More
In case more than 1 MDPE pipelines are laid in a common trench, SOR rate of higher dia plus 1/3rd SOR rate of lower dia will be paid.

-

-

-

... More
MDPE pipeline laying in normal soil with all type of surface by open trench methodology

-

-

-

... More
MDPE pipeline laying in normal soil with all type of surface by open trench methodology by maintaining clear top cover of minimum 1.0 m from the pipeline.

-

-

-

... More
20 mm Dia(Project area)

2000

-

-

... More
32 mm Dia(Project area)

5000

-

-

... More
63 mm Dia(Project area)

8000

-

-

... More
125 mm Dia(Project area)

2000

-

-

... More
MDPE pipeline laying in normal soil with all type of surface by moling methodology without HDPE casing pipe

-

-

-

... More
MDPE pipeline laying in normal soil with all type of surface by moling methodology without HDPE casing pipe by maintaining clear top cover of minimum 1.0 m from the pipeline.

-

-

-

... More
63 mm Dia(Project area)

800

-

-

... More
Restoration of trenches

-

-

-

... More
Restoration to original conditions surface like bituminous/ asphalted road, concrete pavement, RCC pavements, tiles/ slabs/ blocks/ curb stones/ Agra/ Kota stones (chequered/ interlocking etc.), brick lining/ channels pavement as per the scope of work, technical specifications after laying of pipeline in built-up surface, as per the directions of EIC/SIC. Scope includes providing of the approved quality material, testing of materials by third party agencies as per scope of work, technical specification/ CPWD/ IRC standards, submission of the restoration reports, obtaining no objection certificates from the concern local authorities/ statutory authorities/ land owners/ third party inspection agencies designated by land owing agencies and owner.

-

-

-

... More
Interlocking Tiles up to 125 mm thickness(Project area)

400

-

-

... More
Concrete Surface up to 200 mm thickness(Project area)

400

-

-

... More
Fabrication & installation of pipeline markers

-

-

-

... More
Fabrication and installation of pipeline RCC route markers/ steel pole markers/ steel plate markers as per the scope of work, specification & PNGRB T4S along the route/ boundary wall, lamp posts including all associated civil works such as excavation and construction in all types of soils, construction of pedestals and grouting with concrete, cleaning, application of approved color and quality of primer and paint, stencil letter cutting of numbers, direction, chainage etc., restoration of area to original condition and performing all works as per scope of work, specification, PNGRB T4S and instructions of EIC/ SIC.

-

-

-

... More
RCC route markers(Project area)

150

-

-

... More
Steel Plate Markers(Project area)

1500

-

-

... More
Liasioning with Land Agencies for permission (Optional) bidder will not have any right to claim this amount unless it has been approved in advance by the HO.This line item is optional and IOAGPL’s right. This line item is entirely up to IOAGPL's discretion.

-

-

-

... More
Submission of applications as per approved drawings provided by owner (Initial route survey, preperation of drawings, measuring and providing details of surface type shall be in scope of contractor with approval from owner), obtaining & submission of demand note, coordination, liaisoning, obtaining written permissions from land owing agencies like municipal corporation, PWD, development authority, NHAI, railways and any other government agencies who maintains the public lands. These rates are not applicable for private lands i.e. apartments/ institutions etc.(Project area)

-

-

-

... More
MDPE pipeline of all sizes

15000

-

-

... More
GI SECTION

-

-

-

... More
Installation of GI service pipe & fittings

-

-

-

... More
Survey of designated area and survey drawings of societies / colonies/ localities shall be provided by the contractor. installation of GI fittings like elbows, tees, unions, sockets, reducers, GI plugs,any other GI fittings, adopter for appliance valves & Anaconda, Domestic Adoptor, GI Sleeves, RCC Crimping Guard, Meter clamp & Pipe clamps etc. as required to complete the job including supply of all consumables like Teflon tape, soldering consumables, flux application and all other required material to complete the job. Excluding only Supply of GI pipes of all dia.,GI fittings, Isolation valve, appliance valve,brass adopter Anaconda, Meters,Regulators,Suraksha hose pipe with clamps,GI sleeves, & GI fittings which shall be issued by Owner as FIM.

-

-

-

... More
Receiving and taking-over as defined in the scope of work & specifications, handling, loading, transportation and unloading of owner supplied GI pipes of all dia.,GI fittings, Isolation valve, appliance valve,brass adopter Anaconda, Meters,Regulators,Suraksha hose pipe with clamps,GI sleeves, GI fittings and other free issue items from owner's designated place(s) of issue to contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including proper storing, stacking, identification, providing security & insurance cover, including installation of GI line (alongwith installation of required accessories as mentioned above) of following sizes, including fabrication, consumables, labour and other incidental works and handing over the same after return of the surplus pipes, fittings, valves & other accessories to the owner's designated store; carrying out all temporary, ancillary, auxiliary works required to make the GI line ready for commissioning as per drawings, specifications, scope of work and other provisions of contract document and instructions of EIC/ SIC, including but not limited to carrying out the following:

-

-

-

... More
Preparation and approval of schedules, execution procedures, sketches

-

-

-

... More
Finalization of optimum route with consent of customer, from transition fitting to cooking oven/ appliance. A tentative sketch shall be prepared and shall be signed by customer, contractor & SIC/ TPIA

-

-

-

... More
Making temporary but stable platforms/ scaffolding / rope ladders and all other safety devices

-

-

-

... More
Installation of Powder Coated GI Pipes & Fittings, Isolation & Appliance Valves including NPT/BSPT threading, Anaconda, Suraksha Hose etc.. painting as specified including installation of regulators and meters.

-

-

-

... More
Supply & Fixing of approved clamps, Dowell Plugs with screws, grout material, suitable thread sealant i.e. Teflon Tape/ lock tight, drilling of holes through wall /tiles / wood/ marble/ Granite etc jointing of PE to aboveground service GI pipes, testing, purging and commissioning of the complete installation.

-

-

-

... More
Touchup/ Painting of entire length of pipe along with fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to original by cleaning/ touching of corresponding paint to original as per instructions & to satisfaction of the owner. Preparation of laying records, meter reading etc. Reconciliation of free issue material.

-

-

-

... More
Drilling of holes through walls with proper heavy duty hammer drill Machine, tools & tackles, using proper sealant/ grout material & colours to match original, replacement of damages during drilling, restoring the area to original condition to the satisfaction of Owner/ EIC & as per specification for 1/2" & 1" NB in brick wall and RCC wall. PVC sleeve with proper sealant to be provided in the drilled section to protect GI pipe.

-

-

-

... More
All above activities to be carried out as per scope of work, specifications and to the complete satisfaction of consumer & EIC/ SIC.

-

-

-

... More
Handing over the completed works to owner for their operation/ use, returning of all free issue surplus material to owner stores, reconciliation of free issue material area wise and obtaining "no objection certificate" from owner/ EIC/ SIC/ TPIA

-

-

-

... More
Any other activity not mentioned/ covered, explicitly above, but otherwise required for satisfactory completion/ safety/ statutory/ maintenance of works shall also be covered under scope of work and has to be completed by contractor within specified schedule at no extra cost to owner

-

-

-

... More
Arrangement of all tools, tackles and consumables required to execute the work in an efficient manner.

-

-

-

... More
In case of independent house with single connection, Riser isolation valve can be considered as lateral isolation valve.

-

-

-

... More
NON LMC

-

-

-

... More
Installation, testing & commissioning of powder coated GI riser of 1” & ½” from TF to Riser Isolation Valve, from Riser Isolation Valve upto lateral Isolation Valve by providing plug at all levels upto all floors including supply and fixing of all type of pipe supports/ clamps/ brackets.

-

-

-

... More
Installation of Welded powder coated GI/ MS riser at all length in buidlings above 8 floors and confined spaces like basements by using forged fittings confirming to IS 1239 - Part 2, duly polyester powder coated with 70 micron thickness. GI pipe & required fittings shall be first coupled with threaded joint. Teflon/PTFE tape should not be used in threaded joint for welded riser. Alternatively, plain ended pipes and fittings can also be used for welding in welded riser.The entire riser shall be constructed with SOCKET weld only, threaded joints are permitted only on the laterals on account of workability & for future maintenance only. The electrodes (Welding Rods) used for welding on risers shall be of E 6013 grade & 2.5mm thickness of reputed make used for industrial application. The Vendor is required to provide the Batch Test Certificate (TC) for the electrodes. The Weld joint shall be thoroughly cleaned with wire brush and examined visually for its quality. Welding shall be free from defects like porosity, crack, undercut, incomplete fusion etc. Spatter, slag must be removed from pipe.

-

-

-

... More
Installation of Common Ring/ Header of Powder coated GI Pipe/MS Pipe in Basement/ Terrace of the High Rise Building.

-

-

-

... More
Installation of powder coated GI pipe/MS Pipe (Horizontal/ Vertical) in Flats & Bulidings.

-

-

-

... More
Installation of 1/2" powder coated GI pipe(Threaded)(Project area)

3000

-

-

... More
Installation of 1" powder coated Gl pipe (Threaded),O&M Area(Existing charged area)

500

-

-

-

-

-

... More
Installation, testing & commissioning of 1/2" Powder Coated GI pipe & Fittings with Installation of lateral isolation valve (included) at all length after lateral isolation valve along with installation of regulator, meter with associated inlet & outlet connections/ fittings/ anaconda, supply and fixing of approved meter brackets and other supports upto Appliance Valve (excluded). Installation of Appliance Valve is covered in Conversion of Domestic Appliances.

-

-

-

... More
Installation of 1/2" Powder Coated GI pipe & Fittings at all length from lateral isolation valve up to appliance valve/gas tap along with meter & regulator installation at domestic household for connecting PNG connection with GI Riser network with end Blind/cap/plug/ (included). Note:- SOR can only be claimed if the complete work is done from LIV(RIV incase of single connection) to appliance valve including installation of meter and regulator)(Project area)

1500

-

-

... More
Conversion of Domestic Appliance

-

-

-

... More
Conversion of all types of LPG kitchen appliances to NG based appliances by installing appliance valve, suraksha hose of 1 meter, changing/ converting nozzles, jets and associated controls for domestic & imported appliances with proper tools & tackles.

-

-

-

... More
Cleaning and performing minor maintenance, greasing etc of appliance, testing/ showing performance to the customer, signing of joint meter records (JMR) and instructing customer on use & safety norms, complete as per scope of work, specifications & to the satisfaction of owner/ EIC/ SIC.

-

-

-

... More
2 Burner Stove(Project area)

1500

-

-

... More
3/4 Burner Stove(Project area)

500

-

-

... More
INSTALLATION WORKS

-

-

-

... More
Construction of Foundation & Installation of DRS/ MRS/ Metering Skid/ Service Regulator

-

-

-

... More
Receiving and taking over, handling, loading, transportation and unloading of DRS/ Service Regulator/MRS/ Metering Skid from owner's designated stockyards to site, installation and hooking up with Steel & MDPE pipe.

-

-

-

... More
Installation of DRS with RCC pedestal, foundation and Structural Works. Providing and laying reinforced cement concrete of grade M-20 with 20 mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals, pedestal bases, pipe supports, sleepers, columns, equipment, foundation, etc. including providing fencing with gate wherever required.

-

-

-

... More
Hook up from the existing steel tapping to DRS inlet and installation of all the items like pipe, fittings, valves, etc. supplied as FIM by owner as per the directions of the EIC/ SIC.

-

-

-

... More
Supply of all materials, fabrication and erection of chain link fencing 2.5 m high with mesh upto 2 m height providing proper bracing & supprots at safe intervals and barbed wire fencing complete in all respect including painting as per technical specification on all steel items, all works as per specification including foundations and RCC beams. The fence shall be suitably earthed as per the IS 3043.The Earthing pit also to be constructed as per the required specification.

-

-

-

... More
Supply fabrication and erection of all types of pipe supports like clamps, saddle, guide, stops, cradles, neoprene sheet, turn buckles, anchors, T-posts, stockade/ trestle and pipe bridge for overhead piping, frames for canopy, approach ladders and platforms, crossover, cable tray supports etc, including painting suitable for highly corrosive area as per specification, labour and supervision & complete work as per drawing, specifications and instructions of EIC/ SIC.

-

-

-

... More
All handling and transport charges of raw materials and fabricated structures including double handling, as required, for completion of work in accordance with time schedule, are deemed to be included in the quoted rates.

-

-

-

... More
The DRS/ MRS shall be suitably earthed as per the IS 3043.The Earthing pit also to be constructed as per the required specification.

-

-

-

... More
Bolts, nuts, washer, U-clamps, gaskets etc. if required during installation shall be procured and supplied by the contractor within the rate quoted.

-

-

-

... More
Rate quoted in SOR shall include cost of all labour, tools, tackles, equipment, hire charged etc. This is a lump sum item rate and shall not be measured & paid separately

-

-

-

... More
Service Regulator installation, Foundation Size approx. (800 mm x 500 mm x 600 mm)(Project area)

4

-

-

... More
MRS / Metering Skid installation with Foundation Size as per Skid(Project area)

4

-

-

... More
Transportation of MRS from owner designated stock yard to Site(Project area)

4

-

-

... More
CIVIL & STRUCTURAL WORKS

-

-

-

... More
Installation of brick/ RCC valve chambers/ pits

-

-

-

... More
All civil works including excavation of pit, piping supports including best grade bricks used for all walls, PCC and RCC works required for valves pit base & top cover, internal surface plaster, primer & paint coatings on walls, cat ladders & pedestals with insert plates as required sealing of pipe at valve pits, providing metal cover with locking arrangement etc and finishing, clean up and restoration of site, filling and grading of area around the valve station to avoid any local water/ sewage flooding of that area, with provision of separate metal handle to operate valves from above ground as per the approved for construction drawings and specifications as per instruction of EIC/ SIC.

-

-

-

... More
Earth work in excavation and filling to the grades and levels shown in the approved drawings in all kinds of soil including for road embankments, using approved quality good earth from designated borrow area, for all heights and depths including clearing and stripping (Min. 150 mm) of the area marked for filling, taking spot levels, consolidating the exposed natural soil surface, excavating the earth from borrow area loading, transporting & unloading, spreading in layers not exceeding 150 mm thickness, breaking clods, watering (if reqd.), ramming and compacting by manual/ mechanical means to give minimum 95% of modified Proctor's density of earth, testing & dressing including disposal of all unserviceable material all complete as per specifications and directions of EIC/ SIC. Rate to include cost of labour, tools, tackles, equipment, hire charges, cost of borrow earth by way of realities, right of way, cess etc., as applicable with all by works and sundry works.

-

-

-

... More
Supplying and laying plain cement concrete (including shuttering of required) in all types of concrete works including levelling courses below foundation, substructure, superstructure, chambers, cable trench, under floors and any other locations, at all levels as per drawings, specifications and directions of EIC/ SIC.

-

-

-

... More
Providing and laying reinforced cement concrete of grade M-20 with 20 mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals, pedestal bases, pipe supports, sleepers cable trench including construction joints, bitumen painting on surface in contact with soil, providing and fixing reinforcing steel, shuttering, inserts, finishes etc. at all depths and heights complete as per drawings, specifications and direction of the EIC/ SIC.

-

-

-

... More
Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, such as minimum 43 grade cement including sulphate resistant cement for sub structures, R/F steel, Inserts, bolts, conduits, bitumen, other minor construction materials, shuttering tanging, earth work in excavation and backfilling using serviceable earth in all conditions shorting bailing and pumping out water, testing of concrete, curing etc. will all bye works and sundry works.

-

-

-

... More
Providing and laying reinforced cement concrete (M20 Grade) with 20 mm and down grade crushed stone aggregate in pavement, including preparation of base (i.e. compacted sub grade, 200 thk sand and 50 thk PCC M-10 grade), leaving pockets if necessary, making recess, projections fixing inserts conduit pipes (GI, PVC, HDPE etc.) laying in alternate panels, filling the gaps between the panels with bitumen etc., making slopes, finishing edge, leaving bars for pedestals & sleepers, including providing sand fill isolation, shuttering providing and fixing reinforcing steel, curing, chipping and modification works etc. as specified in any shape, thickness, position and finishing the top surface smooth as per requirement etc. all complete as per drawings, specifications and directions of the EIC/ SIC.

-

-

-

... More
Providing brick work with brick class designation M 5.0 of IS:1077 in cm 1:5 (1 cement 5 sand) in steps, walls, retaining walls and load bearing structures drains, or any shape with all lead, depths & height including curing scaffolding etc., as per specifications and drawings with all bye-woks and direction of the EIC/ SIC.

-

-

-

... More
RCC valve chamber - Size (L x W) - 1m x 1m(Project area)

4

-

-

... More
Civil & Structural Works

-

-

-

... More
This item is for miscellaneous jobs including supply of Brick, Cement, Sand, Aggregate, Steel etc.

-

-

-

... More
Supply and installation of half-round RCC crimp guard as per approved drawing(Project area)

1500

-

-

... More
MDPE & GI/COPPER SECTION IN ONLINE CHARGED AREAS

-

-

-

... More
MDPE SECTION

-

-

-

... More
Includes Laying of Pipeline in all type of surface i.e all kinds including kutcha, metal, concrete (PCC/RCC), bituminous, tiled,brick lined etc. after raking up of hard surface of any type. Roads, Pavement, Footpaths etc. shall be made motorable once the pipeline is laid irrespective of any laying methodology adopted. It includes survey of the under ground utilities, execution of the work as per the specification, including excavation of pits, moling with hole size not exceeding 20% of pipe dia., Jointing and insertion of carrier pipe in casing pipe (on case to case basis) and subsequnt backfilling, compaction, testing, purging and commissioning of the complete laid installation,submission of as-built drawing, as graphs as per attached specification and the instruction of EIC/ Site Engineer of owner.

-

-

-

... More
a) Laying of Service line 20/32 mm dia. only for ground connection(GC) up to 5 meters,O&M Area(Existing charged area)

2000

-

-

... More
b) Laying of Service line 20/32 mm dia. only for ground connection(GC) beyond 5 meters (Length up to 5 meter shall be claimed in line item 179 and additional quantity over 5 meter shall be claimed in line item 180 O&M Area(Existing charged area)

12000

-

-

... More
GI/COPPER SECTION

-

-

-

... More
Installation of Owner's supplied item i.e. Isolation & Appliance Valve, Meter,Regulators, 1/2" Powder Coated GI pipe and Fittings with Installation of lateral isolation valve (included) at all length after lateral isolation valve and up to appliance valve along with installation of regulator, meter with associated inlet & outlet connections/ fittings/ anaconda, supply and fixing of approved meter brackets and other supports upto Appliance Valve, Supply & Fixing of approved clamps, end cap/plug, Dowell Plugs with screws, grout material, suitable thread sealant i.e. Teflon Tape/ lock tight, drilling of holes through wall /tiles / wood/ marble/ Granite etc jointing of PE to aboveground service GI pipes, testing, purging and commissioning of the complete installation.

-

-

-

... More
a) 1/2" GI Pipe- all floors upto 5 metersO&M Area(Existing charged area)

1500

-

-

... More
b) 1/2" GI Pipe- all floors above more than 5 meters (Length upto 5 meter shall be claimed in line item 183 and additional quantity over 5 meter shall be claimed in 184,O&M Area(Existing charged area)

15000

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.