Indian Navy Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Indian Navy Tender

Services
Electrical and Electronics
Electrical Works
Eprocure
Opening Date2 Sep 2024
Closing Date23 Sep 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
03 YEAR RRC FOR UNDERTAKING REPAIR/ ROUTINES OF HE/ ATUS, COOLERS, CONDENSERS AND AC CHILLERS FITTED ONBOARD IN SHIPS, SUBMARINE AND YARD CRAFTS BASED AT NSRY (KARWAR)
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Chemical Cleaning - Water Side (provided by firm)

88

-

-

... More
Mechanical Cleaning - Gas Side

88

-

-

... More
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard

88

-

-

... More
Drilling and Tapping

88

-

-

... More
Repair by welding and brazing of condenser end cover

88

-

-

... More
Plugging of tube including manufacturing of plug (provided by firm)

88

-

-

... More
Cold repair by putty (DEVCON/BELZONA)(Provided by firm)

88

-

-

... More
Painting of Condenser/Chillers (with Red Oxide and Enamel Paint) (provided by firm)

88

-

-

... More
Transportation from Ship to work shop and back

88

-

-

... More
Condenser/Chillers - Capacity from 0.025 to 0.05

-

-

-

... More
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)

102

-

-

... More
Mechanical Cleaning - Water Side

102

-

-

... More
Chemical Cleaning - Water Side (provided by firm)

102

-

-

... More
Mechanical Cleaning - Gas Side

102

-

-

... More
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard

102

-

-

... More
Drilling and Tapping

102

-

-

... More
Repair by welding and brazing of condenser end cover

102

-

-

... More
Plugging of tube including manufacturing of plug (provided by firm)

102

-

-

... More
Cold repair by putty (DEVCON/BELZONA)(Provided by firm)

102

-

-

... More
Painting of Condenser/Chillers (with Red Oxide and Enamel Paint) (provided by firm)

102

-

-

... More
Transportation from Ship to work shop and back

102

-

-

... More
Condenser/Chillers - Capacity from 0.05 to 0.1

-

-

-

... More
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)

27

-

-

... More
Mechanical Cleaning - Water Side

27

-

-

... More
Chemical Cleaning - Water Side (provided by firm)

27

-

-

... More
Mechanical Cleaning - Gas Side

27

-

-

... More
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard

27

-

-

... More
Drilling and Tapping

27

-

-

... More
Repair by welding and brazing of condenser end cover

27

-

-

... More
Plugging of tube including manufacturing of plug (provided by firm)

27

-

-

... More
Cold repair by putty (DEVCON/BELZONA)(Provided by firm)

27

-

-

... More
Painting of Condenser/Chillers (with Red Oxide and Enamel Paint) (provided by firm)

27

-

-

... More
Transportation from Ship to work shop and back

27

-

-

... More
Condenser/Chillers - Capacity from 0.1 to 0.3

-

-

-

... More
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)

20

-

-

... More
Mechanical Cleaning - Water Side

20

-

-

... More
Chemical Cleaning - Water Side (provided by firm)

20

-

-

... More
Mechanical Cleaning - Gas Side

20

-

-

... More
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard

20

-

-

... More
Drilling and Tapping

20

-

-

... More
Repair by welding and brazing of condenser end cover

20

-

-

... More
Plugging of tube including manufacturing of plug (provided by firm)

20

-

-

... More
Cold repair by putty (DEVCON/BELZONA)(Provided by firm)

20

-

-

... More
Painting of Condenser/Chillers (with Red Oxide and Enamel Paint) (provided by firm)

20

-

-

... More
Transportation from Ship to work shop and back

20

-

-

... More
Condenser/Chillers - Capacity from 0.3 to 0.5

-

-

-

... More
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)

20

-

-

... More
Mechanical Cleaning - Water Side

20

-

-

... More
Chemical Cleaning - Water Side (provided by firm)

20

-

-

... More
Mechanical Cleaning - Gas Side

20

-

-

... More
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard

20

-

-

... More
Drilling and Tapping

20

-

-

... More
Repair by welding and brazing of condenser end cover

20

-

-

... More
Plugging of tube including manufacturing of plug (provided by firm)

20

-

-

... More
Cold repair by putty (DEVCON/BELZONA)(Provided by firm)

20

-

-

... More
Painting of Condenser/Chillers (with Red Oxide and Enamel Paint) (provided by firm)

20

-

-

... More
Transportation from Ship to work shop and back

20

-

-

... More
Condenser/Chillers - Capacity from 0.5 and Above

-

-

-

... More
Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers)

20

-

-

... More
Mechanical Cleaning - Water Side

20

-

-

... More
Chemical Cleaning - Water Side (provided by firm)

20

-

-

... More
Mechanical Cleaning - Gas Side

20

-

-

... More
Fitment of condenser end cover including associated chillers pipeline and proving the system onboard

20

-

-

... More
Drilling and Tapping

20

-

-

... More
Repair by welding and brazing of condenser end cover

20

-

-

... More
Plugging of tube including manufacturing of plug (provided by firm)

20

-

-

... More
Cold repair by putty (DEVCON/BELZONA)(Provided by firm)

20

-

-

... More
Painting of Condenser/Chillers (with Red Oxide and Enamel Paint) (provided by firm)

20

-

-

... More
Transportation from Ship to work shop and back

20

-

-

... More
Coolers - Capacity upto 0.025

-

-

-

... More
Removal of Cooler including associated system pipelines

15

-

-

... More
F/W Cooler -Chemical cleaning (provided by firm)

15

-

-

... More
F/W Cooler - Mechanical cleaning

15

-

-

... More
Lub oil Cooler - Chemical cleaning (provided by firm)

15

-

-

... More
Radiator mechanical cleaning

15

-

-

... More
Radiator chemical cleaning (provided by firm)

15

-

-

... More
CPP cooler - Chemical cleaning (provided by firm)

15

-

-

... More
General Cooler - Mechanical cleaning

15

-

-

... More
General cooler - Chemical cleaning (provided by firm)

15

-

-

... More
Hydraulic cooler - Chemical cleaning (provided by firm)

15

-

-

... More
Gear Box Cooler - Chemical cleaning (provided by firm)

15

-

-

... More
Air Compressor / Cooling Coil chemical cleaning (provided by firm)

15

-

-

... More
Fitment of cooler including associated chillers pipeline and proving the system onboard

15

-

-

... More
Drilling and Tapping

15

-

-

... More
Plugging of tube including manufacturing of plug (provided by firm)

15

-

-

... More
Repair by welding and brazing of condenser end cover

15

-

-

... More
Cold repair by putty (DEVCON/ BELZONA)(provided by firm)

15

-

-

... More
Removal of associated system pipeline for INSITU cleaning of fresh water cooler

15

-

-

... More
Chemical cleaning of cooler (provided by firm)

15

-

-

... More
Mechanical cleaning of cooler

15

-

-

... More
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler

15

-

-

... More
Chemical cleaning of cooler (provided by firm)

15

-

-

... More
Mechanical cleaning of cooler

15

-

-

... More
Pressure Testing of cooler INSITU

15

-

-

... More
Pressure testing of cooler at shop floor

15

-

-

... More
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler

15

-

-

... More
Paintaing of ATU/HE (with red oxide and enamel paints)(provided by firm)

15

-

-

... More
Transportation from Ship to work shop and back

15

-

-

... More
Coolers - Capacity from 0.025 to 0.05

-

-

-

... More
Removal of Cooler including associated system pipelines

33

-

-

... More
F/W Cooler -Chemical cleaning (provided by firm)

33

-

-

... More
F/W Cooler - Mechanical cleaning

33

-

-

... More
Lub oil Cooler - Chemical cleaning (provided by firm)

33

-

-

... More
Radiator mechanical cleaning

33

-

-

... More
Radiator chemical cleaning (provided by firm)

33

-

-

... More
CPP cooler - Chemical cleaning (provided by firm)

33

-

-

... More
General Cooler - Mechanical cleaning

33

-

-

... More
General cooler - Chemical cleaning (provided by firm)

33

-

-

... More
Hydraulic cooler - Chemical cleaning (provided by firm)

33

-

-

... More
Gear Box Cooler - Chemical cleaning (provided by firm)

33

-

-

... More
Air Compressor / Cooling Coil chemical cleaning (provided by firm)

33

-

-

... More
Fitment of cooler including associated chillers pipeline and proving the system onboard

33

-

-

... More
Drilling and Tapping

33

-

-

... More
Plugging of tube including manufacturing of plug (provided by firm)

33

-

-

... More
Repair by welding and brazing of condenser end cover

33

-

-

... More
Cold repair by putty (DEVCON/ BELZONA)(provided by firm)

33

-

-

... More
Removal of associated system pipeline for INSITU cleaning of fresh water cooler

33

-

-

... More
Chemical cleaning of cooler (provided by firm)

33

-

-

... More
Mechanical cleaning of cooler

33

-

-

... More
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler

33

-

-

... More
Chemical cleaning of cooler (provided by firm)

33

-

-

... More
Mechanical cleaning of cooler

33

-

-

... More
Pressure Testing of cooler INSITU

33

-

-

... More
Pressure testing of cooler at shop floor

33

-

-

... More
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler

33

-

-

... More
Paintaing of ATU/HE (with red oxide and enamel paints)(provided by firm)

33

-

-

... More
Transportation from Ship to work shop and back

33

-

-

... More
Coolers - Capacity from 0.5 to 0.1

-

-

-

... More
Removal of Cooler including associated system pipelines

12

-

-

... More
F/W Cooler -Chemical cleaning (provided by firm)

12

-

-

... More
F/W Cooler - Mechanical cleaning

12

-

-

... More
Lub oil Cooler - Chemical cleaning (provided by firm)

12

-

-

... More
Radiator mechanical cleaning

12

-

-

... More
Radiator chemical cleaning (provided by firm)

12

-

-

... More
CPP cooler - Chemical cleaning (provided by firm)

12

-

-

... More
General Cooler - Mechanical cleaning

12

-

-

... More
General cooler - Chemical cleaning (provided by firm)

12

-

-

... More
Hydraulic cooler - Chemical cleaning (provided by firm)

12

-

-

... More
Gear Box Cooler - Chemical cleaning (provided by firm)

12

-

-

... More
Air Compressor / Cooling Coil chemical cleaning (provided by firm)

12

-

-

... More
Fitment of cooler including associated chillers pipeline and proving the system onboard

12

-

-

... More
Drilling and Tapping

12

-

-

... More
Plugging of tube including manufacturing of plug (provided by firm)

12

-

-

... More
Repair by welding and brazing of condenser end cover

12

-

-

... More
Cold repair by putty (DEVCON/ BELZONA)(provided by firm)

12

-

-

... More
Removal of associated system pipeline for INSITU cleaning of fresh water cooler

12

-

-

... More
Chemical cleaning of cooler (provided by firm)

12

-

-

... More
Mechanical cleaning of cooler

12

-

-

... More
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler

12

-

-

... More
Chemical cleaning of cooler (provided by firm)

12

-

-

... More
Mechanical cleaning of cooler

12

-

-

... More
Pressure Testing of cooler INSITU

12

-

-

... More
Pressure testing of cooler at shop floor

12

-

-

... More
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler

12

-

-

... More
Paintaing of ATU/HE (with red oxide and enamel paints)(provided by firm)

12

-

-

... More
Transportation from Ship to work shop and back

12

-

-

... More
Coolers - Capacity from 0.1 to 0.3

-

-

-

... More
Removal of Cooler including associated system pipelines

2

-

-

... More
F/W Cooler -Chemical cleaning (provided by firm)

2

-

-

... More
F/W Cooler - Mechanical cleaning

2

-

-

... More
Lub oil Cooler - Chemical cleaning (provided by firm)

2

-

-

... More
Radiator mechanical cleaning

2

-

-

... More
Radiator chemical cleaning (provided by firm)

2

-

-

... More
CPP cooler - Chemical cleaning (provided by firm)

2

-

-

... More
General Cooler - Mechanical cleaning

2

-

-

... More
General cooler - Chemical cleaning (provided by firm)

2

-

-

... More
Hydraulic cooler - Chemical cleaning (provided by firm)

2

-

-

... More
Gear Box Cooler - Chemical cleaning (provided by firm)

2

-

-

... More
Air Compressor / Cooling Coil chemical cleaning (provided by firm)

2

-

-

... More
Fitment of cooler including associated chillers pipeline and proving the system onboard

2

-

-

... More
Drilling and Tapping

2

-

-

... More
Plugging of tube including manufacturing of plug (provided by firm)

2

-

-

... More
Repair by welding and brazing of condenser end cover

2

-

-

... More
Cold repair by putty (DEVCON/ BELZONA)(provided by firm)

2

-

-

... More
Removal of associated system pipeline for INSITU cleaning of fresh water cooler

2

-

-

... More
Chemical cleaning of cooler (provided by firm)

2

-

-

... More
Mechanical cleaning of cooler

2

-

-

... More
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler

2

-

-

... More
Chemical cleaning of cooler (provided by firm)

2

-

-

... More
Mechanical cleaning of cooler

2

-

-

... More
Pressure Testing of cooler INSITU

2

-

-

... More
Pressure testing of cooler at shop floor

2

-

-

... More
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler

2

-

-

... More
Paintaing of ATU/HE (with red oxide and enamel paints)(provided by firm)

2

-

-

... More
Transportation from Ship to work shop and back

2

-

-

... More
Coolers - Capacity from 0.3 and 0.5

-

-

-

... More
Removal of Cooler including associated system pipelines

2

-

-

... More
F/W Cooler -Chemical cleaning (provided by firm)

2

-

-

... More
F/W Cooler - Mechanical cleaning

2

-

-

... More
Lub oil Cooler - Chemical cleaning (provided by firm)

2

-

-

... More
Radiator mechanical cleaning

2

-

-

... More
Radiator chemical cleaning (provided by firm)

2

-

-

... More
CPP cooler - Chemical cleaning (provided by firm)

2

-

-

... More
General Cooler - Mechanical cleaning

2

-

-

... More
General cooler - Chemical cleaning (provided by firm)

2

-

-

... More
Hydraulic cooler - Chemical cleaning (provided by firm)

2

-

-

... More
Gear Box Cooler - Chemical cleaning (provided by firm)

2

-

-

... More
Air Compressor / Cooling Coil chemical cleaning (provided by firm)

2

-

-

... More
Fitment of cooler including associated chillers pipeline and proving the system onboard

2

-

-

... More
Drilling and Tapping

2

-

-

... More
Plugging of tube including manufacturing of plug (provided by firm)

2

-

-

... More
Repair by welding and brazing of condenser end cover

2

-

-

... More
Cold repair by putty (DEVCON/ BELZONA)(provided by firm)

2

-

-

... More
Removal of associated system pipeline for INSITU cleaning of fresh water cooler

2

-

-

... More
Chemical cleaning of cooler (provided by firm)

2

-

-

... More
Mechanical cleaning of cooler

2

-

-

... More
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler

2

-

-

... More
Chemical cleaning of cooler (provided by firm)

2

-

-

... More
Mechanical cleaning of cooler

2

-

-

... More
Pressure Testing of cooler INSITU

2

-

-

... More
Pressure testing of cooler at shop floor

2

-

-

... More
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler

2

-

-

... More
Paintaing of ATU/HE (with red oxide and enamel paints)(provided by firm)

2

-

-

... More
Transportation from Ship to work shop and back

2

-

-

... More
Coolers - Capacity from 0.5 and Above

-

-

-

... More
Removal of Cooler including associated system pipelines

2

-

-

... More
F/W Cooler -Chemical cleaning (provided by firm)

2

-

-

... More
F/W Cooler - Mechanical cleaning

2

-

-

... More
Lub oil Cooler - Chemical cleaning (provided by firm)

2

-

-

... More
Radiator mechanical cleaning

2

-

-

... More
Radiator chemical cleaning (provided by firm)

2

-

-

... More
CPP cooler - Chemical cleaning (provided by firm)

2

-

-

... More
General Cooler - Mechanical cleaning

2

-

-

... More
General cooler - Chemical cleaning (provided by firm)

2

-

-

... More
Hydraulic cooler - Chemical cleaning (provided by firm)

2

-

-

... More
Gear Box Cooler - Chemical cleaning (provided by firm)

2

-

-

... More
Air Compressor / Cooling Coil chemical cleaning (provided by firm)

2

-

-

... More
Fitment of cooler including associated chillers pipeline and proving the system onboard

2

-

-

... More
Drilling and Tapping

2

-

-

... More
Plugging of tube including manufacturing of plug (provided by firm)

2

-

-

... More
Repair by welding and brazing of condenser end cover

2

-

-

... More
Cold repair by putty (DEVCON/ BELZONA)(provided by firm)

2

-

-

... More
Removal of associated system pipeline for INSITU cleaning of fresh water cooler

2

-

-

... More
Chemical cleaning of cooler (provided by firm)

2

-

-

... More
Mechanical cleaning of cooler

2

-

-

... More
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler

2

-

-

... More
Chemical cleaning of cooler (provided by firm)

2

-

-

... More
Mechanical cleaning of cooler

2

-

-

... More
Pressure Testing of cooler INSITU

2

-

-

... More
Pressure testing of cooler at shop floor

2

-

-

... More
Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler

2

-

-

... More
Paintaing of ATU/HE (with red oxide and enamel paints)(provided by firm)

2

-

-

... More
Transportation from Ship to work shop and back

2

-

-

... More
Renewal &Fitment of zinc protector with adaptor - Capacity from 0.3 to 0.5

-

-

-

... More
HE's and ATUs

76

-

-

... More
AC Condenser and Chillers

120

-

-

... More
Renewal & Fitment of zinc protector with adaptor - Capacity from 0.5 and above

-

-

-

... More
HE's and ATUs

24

-

-

... More
AC Condenser and Chillers

120

-

-

... More
HE's and ATU's - Capacity up to 0.025

-

-

-

... More
Removal of ATU/HE including de-lagging, disconnecting associated pipelines

316

-

-

... More
Mechanical cleaning - Air Side

316

-

-

... More
Chemical cleaning - Air Side (Chemical provided by firm)

316

-

-

... More
Chemical cleaning - Water Side (Chemical provided by firm)

316

-

-

... More
Pressure Testing

316

-

-

... More
Fitment of ATU/HE including associated system pipelines and proving of system onboard

316

-

-

... More
Drilling and Tapping

316

-

-

... More
Manufacturing of Flange

316

-

-

... More
Repair by Welding and Brazing of ATU/HE end cover

316

-

-

... More
Plugging of tube including manufacturing of Plug (Provided by firm)

316

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

316

-

-

... More
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning

316

-

-

... More
INSITU mechanical cleaning - Air Side

316

-

-

... More
INSITU Chemical cleaning - Air Side (Provided by firm)

316

-

-

... More
INSITU Chemical cleaning - Water side

316

-

-

... More
Fitment of ATU/HE including associated system onboard

316

-

-

... More
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)

316

-

-

... More
Transportation from Ship to work shop and back)

316

-

-

... More
Neutralizing of ATU/HE after chemical cleaning

316

-

-

... More
Blanking of system pipeline

316

-

-

... More
HE's and ATU's - Capacity from 0.025 to 0.05

-

-

-

... More
Removal of ATU/HE including de-lagging, disconnecting associated pipelines

300

-

-

... More
Mechanical cleaning - Air Side

300

-

-

... More
Chemical cleaning - Air Side (Chemical provided by firm)

300

-

-

... More
Chemical cleaning - Water Side (Chemical provided by firm)

300

-

-

... More
Pressure Testing

300

-

-

... More
Fitment of ATU/HE including associated system pipelines and proving of system onboard

300

-

-

... More
Drilling and Tapping

300

-

-

... More
Manufacturing of Flange

300

-

-

... More
Repair by Welding and Brazing of ATU/HE end cover

300

-

-

... More
Plugging of tube including manufacturing of Plug (Provided by firm)

300

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

300

-

-

... More
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning

300

-

-

... More
INSITU mechanical cleaning - Air Side

300

-

-

... More
INSITU Chemical cleaning - Air Side (Provided by firm)

300

-

-

... More
INSITU Chemical cleaning - Water

300

-

-

... More
Fitment of ATU/HE including associated system onboard

300

-

-

... More
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)

300

-

-

... More
Transportation from Ship to work shop and back)

300

-

-

... More
Neutralizing of ATU/HE after chemical cleaning

300

-

-

... More
Blanking of system pipeline

300

-

-

... More
HE's and ATU's - Capacity from 0.05 and 0.1

-

-

-

... More
Removal of ATU/HE including de-lagging, disconnecting associated pipelines

84

-

-

... More
Mechanical cleaning - Air Side

84

-

-

... More
Chemical cleaning - Air Side (Chemical provided by firm)

84

-

-

... More
Chemical cleaning - Water Side (Chemical provided by firm)

84

-

-

... More
Pressure Testing

84

-

-

... More
Fitment of ATU/HE including associated system pipelines and proving of system onboard

84

-

-

... More
Drilling and Tapping

84

-

-

... More
Manufacturing of Flange

84

-

-

... More
Repair by Welding and Brazing of ATU/HE end cover

84

-

-

... More
Plugging of tube including manufacturing of Plug (Provided by firm)

84

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

84

-

-

... More
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning

84

-

-

... More
INSITU mechanical cleaning - Air Side

84

-

-

... More
INSITU Chemical cleaning - Air Side (Provided by firm)

84

-

-

... More
INSITU Chemical cleaning - Water

84

-

-

... More
Fitment of ATU/HE including associated system onboard

84

-

-

... More
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)

84

-

-

... More
Transportation from Ship to work shop and back)

84

-

-

... More
Neutralizing of ATU/HE after chemical cleaning

84

-

-

... More
Blanking of system pipeline

84

-

-

... More
HE's and ATU's - Capacity from 0.1 and 0.3

-

-

-

... More
Removal of ATU/HE including de-lagging, disconnecting associated pipelines

37

-

-

... More
Mechanical cleaning - Air Side

37

-

-

... More
Chemical cleaning - Air Side (Chemical provided by firm)

37

-

-

... More
Chemical cleaning - Water Side (Chemical provided by firm)

37

-

-

... More
Pressure Testing

37

-

-

... More
Fitment of ATU/HE including associated system pipelines and proving of system onboard

37

-

-

... More
Drilling and Tapping

37

-

-

... More
Manufacturing of Flange

37

-

-

... More
Repair by Welding and Brazing of ATU/HE end cover

37

-

-

... More
Plugging of tube including manufacturing of Plug (Provided by firm)

37

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

37

-

-

... More
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning

37

-

-

... More
INSITU mechanical cleaning - Air Side

37

-

-

... More
INSITU Chemical cleaning - Air Side (Provided by firm)

37

-

-

... More
INSITU Chemical cleaning - Water

37

-

-

... More
Fitment of ATU/HE including associated system onboard

37

-

-

... More
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)

37

-

-

... More
Transportation from Ship to work shop and back)

37

-

-

... More
Neutralizing of ATU/HE after chemical cleaning

37

-

-

... More
Blanking of system pipeline

37

-

-

... More
HE's and ATU's - Capacity from 0.3 and 0.5

-

-

-

... More
Removal of ATU/HE including de-lagging, disconnecting associated pipelines

19

-

-

... More
Mechanical cleaning - Air Side

19

-

-

... More
Chemical cleaning - Air Side (Chemical provided by firm)

19

-

-

... More
Chemical cleaning - Water Side (Chemical provided by firm)

19

-

-

... More
Pressure Testing

19

-

-

... More
Fitment of ATU/HE including associated system pipelines and proving of system onboard

19

-

-

... More
Drilling and Tapping

19

-

-

... More
Manufacturing of Flange

19

-

-

... More
Repair by Welding and Brazing of ATU/HE end cover

19

-

-

... More
Plugging of tube including manufacturing of Plug (Provided by firm)

19

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

19

-

-

... More
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning

19

-

-

... More
INSITU mechanical cleaning - Air Side

19

-

-

... More
INSITU Chemical cleaning - Air Side (Provided by firm)

19

-

-

... More
INSITU Chemical cleaning - Water

19

-

-

... More
Fitment of ATU/HE including associated system onboard

19

-

-

... More
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)

19

-

-

... More
Transportation from Ship to work shop and back)

19

-

-

... More
Neutralizing of ATU/HE after chemical cleaning

19

-

-

... More
Blanking of system pipeline

19

-

-

... More
HE's and ATU's - Capacity from 0.5 and above

-

-

-

... More
Removal of ATU/HE including de-lagging, disconnecting associated pipelines

6

-

-

... More
Mechanical cleaning - Air Side

6

-

-

... More
Chemical cleaning - Air Side (Chemical provided by firm)

6

-

-

... More
Chemical cleaning - Water Side (Chemical provided by firm)

6

-

-

... More
Pressure Testing

6

-

-

... More
Fitment of ATU/HE including associated system pipelines and proving of system onboard

6

-

-

... More
Drilling and Tapping

6

-

-

... More
Manufacturing of Flange

6

-

-

... More
Repair by Welding and Brazing of ATU/HE end cover

6

-

-

... More
Plugging of tube including manufacturing of Plug (Provided by firm)

6

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

6

-

-

... More
Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning

6

-

-

... More
INSITU mechanical cleaning - Air Side

6

-

-

... More
INSITU Chemical cleaning - Air Side (Provided by firm)

6

-

-

... More
INSITU Chemical cleaning - Water

6

-

-

... More
Fitment of ATU/HE including associated system onboard

6

-

-

... More
Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm)

6

-

-

... More
Transportation from Ship to work shop and back)

6

-

-

... More
Neutralizing of ATU/HE after chemical cleaning

6

-

-

... More
Blanking of system pipeline

6

-

-

... More
Exhaust Trunking:- 0-25 CM De-gutting of trunking. Dismantle complete trunking for cleaning (chemical, mechanical & water jet) Repair/renewal of Flanges/Silencer/trunking by metal build up/welding/brazing& cold repair. Pressure testing of trunking. Re-gutting at on board and trials.

130

-

-

... More
Exhaust Trunking:- 26-50 CM De-gutting of trunking. Dismantle complete trunking for cleaning (chemical, mechanical & water jet) Repair/renewal of Flanges/Silencer/trunking by metal build up/welding/brazing& cold repair. Pressure testing of trunking. Re-gutting at on board and trials.

67

-

-

... More
Repair/Renewal of Exhaust Trunking:- 51-100 CM De-gutting of trunking. Dismantle complete trunking for cleaning (chemical, mechanical & water jet) Repair/renewal of Flanges/Silencer/trunking by metal build up/welding/brazing& cold repair. Pressure testing of trunking. Re-gutting at on board and trials.

67

-

-

... More
Sub marine Coolers (EN Coolers). 1. Dismandling a.Cleaning and degreasing of collar-stud threads b. Remove both shells, c. Carry out visual inspection for cleaning of plates and tube bundle. d. Under take cleaning inside shells & tubes with a nylon brush. e. Undertake cleaning with jet cleaner with a pressure of 4-7 Bar and nylon brush for bundle tubes. f. Carry out visual inspection of corrosion on plates, shells and visible end of tubes. shall be. g.In case of doubt, an endoscopic examination to be carried out. 2.Reassembly: a.Check condition of threads and cleaning of threads of collar-studs and nuts. b.Ensure No Scores & impact marks on contact face, if so re-face. c.Check condition & dimension of new gaskets before fitting. c.Greasing of collar-studs with Ti 2000 Molykote. d.Re assemble cooler with atmost care e.Fitting of new washers and hand torquing of nuts. f.Staggered torquing and application of 20 m.daN tightening torque in two runs minimum. 3.Leak tests: Seawater side. a.Test the seawater system at 42 bar leak test pressure for 15 minutes. b.Check for any leak or pressure drop. 4. Spares a.Plain washer zinc plated steel dn20(e25514a200pfazu). b.Lock nut m20 (galvanized steel)(602002-32) c.Nut hhm20 (steel class 10)(en24033m20-10. d.Shell partition gasket u-shaped separation seal (neoprene)(mu859rep1) e.Shell o-ring for closing plate ø330x5(u5331091001)

120

-

-

... More
Submarine coolers EM Coolers. 1. Dismandling a.Cleaning and degreasing of collar-stud threads b. Remove both shells, c. Carry out visual inspection for cleaning of plates and tube bundle. d. Under take cleaning inside shells & tubes with a nylon brush. e. Undertake cleaning with jet cleaner with a pressure of 4-7 Bar and nylon brush for bundle tubes. f. Carry out visual inspection of corrosion on plates, shells and visible end of tubes. shall be. g.In case of doubt, an endoscopic examination to be carried out. 2.Reassembly: a.Check condition of threads and cleaning of threads of collar-studs and nuts. b.Ensure No Scores & impact marks on contact face, if so re-face. c.Check condition & dimension of new gaskets before fitting. c.Greasing of collar-studs with Ti 2000 Molykote. d.Re assemble cooler with atmost care e.Fitting of new washers and hand torquing of nuts. f.Staggered torquing and application of 20 m.daN tightening torque in two runs minimum. 3.Leak tests: Seawater side. a.Test the seawater system at 42 bar leak test pressure for 15 minutes. b.Check for any leak or pressure drop. 4. Spares a.Plain washer zinc plated steel dn20(e25514a200pfazu). b.Lock nut m20 (galvanized steel)(602002-32) c.Nut hhm20 (steel class 10)(en24033m20-10. d.Shell partition gasket u-shaped separation seal (neoprene)(mu859rep1) e.Shell o-ring for closing plate ø330x5(u5331091001)

120

-

-

... More
Spares Condenser/Chillers - Capacity upto 0.025

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

88

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

88

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

88

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

88

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

88

-

-

... More
Condenser/Chillers - Capacity from 0.025 to 0.05

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

102

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

102

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

102

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

102

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

102

-

-

... More
Condenser/Chillers - Capacity from 0.05 to 0.1

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

27

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

27

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

27

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

27

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

27

-

-

... More
Condenser/Chillers - Capacity from 0.1 to 0.3

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

20

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

20

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

20

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

20

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

20

-

-

... More
Condenser/Chillers - Capacity from 0.3 to 0.5

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

20

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

20

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

20

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

20

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

20

-

-

... More
Condenser/Chillers - Capacity from 0.5 and above

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

20

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

20

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

20

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

20

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

20

-

-

... More
Coolers - Capacity upto 0.025

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

15

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

15

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

15

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

15

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

15

-

-

... More
Coolers - Capacity from 0.025 to 0.05

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

33

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

33

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

33

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

33

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

33

-

-

... More
Coolers - Capacity from 0.05 to 0.1

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

12

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

12

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

12

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

12

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

12

-

-

... More
Coolers - Capacity from 0.1 to 0.3

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

2

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

2

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

2

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

2

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

2

-

-

... More
Coolers - Capacity from 0.3 to 0.5

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

2

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

2

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

2

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

2

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

2

-

-

... More
Coolers - Capacity from 0.5 and above

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

2

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

2

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

2

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

2

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

2

-

-

... More
HE's and ATU's - Capacity up to 0.025

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

316

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

316

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

316

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

316

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

316

-

-

... More
HE's and ATU's - Capacity from 0.025 to 0.05

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

300

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

300

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

300

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

300

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

300

-

-

... More
HE's and ATU's - Capacity from 0.05 to 0.1

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

84

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

84

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

84

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

84

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

84

-

-

... More
HE's and ATU's - Capacity from 0.1 to 0.3

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

37

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

37

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

37

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

37

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

37

-

-

... More
HE's and ATU's - Capacity from 0.3 to 0.5

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

19

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

19

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

19

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

19

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

19

-

-

... More
HE's and ATU's - Capacity from 0.5 and above

-

-

-

... More
Renewal of Joint/Gasket (Provided by firm)

6

-

-

... More
Renewal of fasteners as required (Brass) (Provided by firm)

6

-

-

... More
Renewal of Fasteners as required (SS) (Provided by firm)

6

-

-

... More
Renewal of Fasteners as required (MS) (Provided by firm)

6

-

-

... More
Cold repair by putty (DEVCON/BELZONA) (Provided by firm)

6

-

-

... More
Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.3 to 0.5

-

-

-

... More
HE's and ATUs

76

-

-

... More
AC Condenser and Chillers

120

-

-

... More
Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.5 and above

-

-

-

... More
HE's and ATUs

24

-

-

... More
AC Condenser and Chillers

120

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.