Gauribidanur Taluk Agricultural Producers Cooperative Marketing Society Limited Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Gauribidanur Taluk Agricultural Producers Cooperative Marketing Society Limited Tender

Civil And Construction
Opening Date18 Sep 2024
Closing Date26 Sep 2024
Tender Amount₹ 38,15,513.3 
Notes
Download

Costs

Summary

Repairs And New Construction Of Agricultural Producer Co-operative Marketing Society Ltd Gowdown And Office Building At Gowribidnur Town, Chikkaballapur District.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item No.4 - Removing of Old Door ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

7.56

100

756

... More
Item No.5 - Refixing of Old Door ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

3.78

100

378

... More
Item No.6 - Removing and refixing stone slabs of drains and pointing in CM (1:3)(P.No.25, I.No. 5.33 of PWD SR 2018-19) ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

26.28

105

2759.4

... More
Item No.7 - Earth work excavation for Foundation by manual means for all Buildings, Bridges, Retaining walls, Abutment Piers and such similar works as per drawing and technical Specifications, including setting out, providing shoring & strutting,barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work.In all kinds of soils Depth upto 1.5 mCommon SR Volume (1) (P-6,It No 1.15.1 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

12.35

363

4483.05

... More
Item No.8 - Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:4:8( M5) Using 40 mm and down size graded crushed coarse aggregates Common SR Volume (1) (P-15,It No 2.1.2 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

2.47

5664

13990.08

... More
Item No.9 - Providing and Constructing Laterite size stone Masonry including Cost and Conveince of all metirials curing etc Complete as specification IS 3620/1979 having compressive strenght not less than 3.5 N/MM Sqm for Satulated Dry Samples - For Foundation In CM 1:6 Common SR Volume (2) (P-3,It No 6.35 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

7.9

6374

50354.6

... More
Item No.10 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Common SR Volume (1) (P-16,It No 2.5.1 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

1.98

6630

13127.4

... More
Item No.11 - Add Centring Charges for Plinth Add for 50% Common SR Volume (1) (P-115,Slno8 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

1.98

3315

6563.7

... More
Item No.12 - Providing Brick work with common burnt clay modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. Common SR Volume (2) (P-13,It No 6.4 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

16.8

8661

145504.8

... More
Item No.13 - Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates Common SR Volume (1) (P-16,It No 2.5.2 ) 2023-24 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

22.93

6843

156909.99

... More
Item No.14 - Add Centring Charges for Roof Add for 60% Common SR Volume (1) (P-115,Slno8 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

22.93

4105

94145.994

... More
Item No.15 - Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates Common SR Volume (1) (P-16,It No 2.5.2 ) 2023-24 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

59.8

6843

409211.4

... More
Item No.16 - Add Centring Charges for Roof Add for 50% Common SR Volume (1) (P-115,Slno8 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

59.8

3421

204605.7

... More
Item No.17 - Providing Brick work with common burnt clay modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. Common SR Volume (2) (P-13,It No 6.4 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

34.78

8661

301229.58

... More
Item No.18 - Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (Thelaps and wastages shall not be measured separately)Common SR Volume (2) (P-84,Slno11.32 ) 2022-23 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

9.36

89457

837317.52

... More
Item No.19 - Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Common SR Volume (2) (P-41, It No 8.2.1) ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

483.81

295

142723.95

... More
Item No.20 - Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Common SR Volume (2) (P-41,It No 8.4.2) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

449.36

213

95713.68

... More
Item No.21 - Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Common SR Volume (2) (P-41, It No 8.3.1 ) 2023-24 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

327.57

354

115959.78

... More
Item No.22 - Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications.(P-60, Item No : 9.12) Vol - 2 PWD SR of 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

5

1449

7245

... More
Item No.23 - Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. Common SR Volume (2) (P-60, It No 9.11) ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

27.3

889

24269.7

... More
Item No.24 - SOLID PANEL PVC DOOR SHUTTER Providing & fixing 30mm thick factory made rigid foam Panelled Door Shutters made from M.S. tube of 19 gauge thickness, size 19x19mm fro styles and 15x15mm for top & bottom rails, covered with heat moulded PVC channel of 5mm thick sheet & 30 x 50mm wide to form styles & 5mm thick & 75mm wide PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick 20mm wide PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet fitted in the M.S. Frame, Sealed to the styles & rails with 5x30mm PVC sheet beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75 m.m Aluminium hinges.Common SR Volume (2) (P-106,It No 12.55.2 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

3.15

2040

6426

... More
Item No.25 - Providing and fixing of 2 track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2 (Titanium Dioxide) at 6PHR with TPE (Thermo Plastic Elastomer) and lead free gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows and shall be provided with 5mm plain float glass, standard hardware single point locking system with touch lock. Wall thickness of frame and sash shall be of 2-2.5 mm. Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T and P s shall not be made) Common SR Volume (2) (P-123, It No 12.55) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

18

5390

97020

... More
Item No.26 - Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600x600 mm .Common SR Volume (2) (P-60, It No 9.12.2) ) 2023-24 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

132.5

1145

151712.5

... More
Item No.27 - Providing Mathi / Nandi wood wrought and putup for purlins, common rafters and similar work including cost of materials, labour, usage charges complete as per specifications.Common SR Volume (2) (P-99,It No 12.3 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

0.3

122399

36719.7

... More
Item No.28 - Providing and fixing in position fully panelled Teak wood shutters for doors with , stiles and rails of 35mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures)Common SR Volume (2) (P-100,It No 12.16 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

2.52

9479

23887.08

... More
Item No.29 - Polishing in high gloss/matt finish melamine clear polish on wood work in required color/wooden shade texture with following process in the sequence as detailed below:1. The surface to be polished is rubbed with sand paper 80/120 no. and then with sand paper of 160/180 no. 2. Applying two coats of sealer with spray gun and allowing sufficient drying time for 1st coat and 2nd coat is allowed to dry for 8 to 12 hrs.3. On drying of sealer coat, wet rubbing with emery cloth of finer grading with ample water to remove excess sealer layer and make the surface further smooth after this wet rubbing, then surface is applied with special grade melamine fillers to fill all the small and big holes/grooves etc. Filler coat to be allowed to dry for 4 to 6 hrs on which again a light wet rubbing is done this surface isfurther allowed to dry for 12 hrs.Common SR Volume (2) (P-54,It No 8.82 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

5.04

677

3412.08

... More
Item No.30 - Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge.Common SR Volume (2) (P-50,It No 8.51 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

933.17

100

93317

... More
Item No.31 - Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as perdirections of Engineer-in-charge Common SR Volume (2) (P-48,It No 8.39 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

933.17

127

118512.59

... More
Item No.32 - Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Common SR Volume (2) (P-45,Itno8.30 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

481.17

174

83723.58

... More
Item No.33 - Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge.Common SR Volume(2) ( P.No 44 item 8.19.1)2022-23 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

36.4

255

9282

... More
Item No.34 - Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding Common SR Volume (2) (P-85, It No 11.34(A) ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

378

168

63504

... More
Item No.35 - Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. G.I. pipes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin- Charge. Common SR Volume (2) (P-84,It No 11.26.3 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

250

183

45750

... More
Item No.36 - KSRB 7.3 : Providing and fixing 1mm thick M.S. sheet garage door with frame and diagonal braces of size 40x40x6 mm angle Iron, 3.15mm thick M.S. Gusset plates at the junctions and corners, with handles, stoppers and locking arrangements etc., including applying a priming coat of red lead paint cost of materials, labour, HOM of machinery complete as per specifications. Double leaf door of size 2.4x2.4m. Specification No. KBS 7.9 / 7.12. (P.No. 31, I.No. 7.3 of CSR 2018-19) ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

5.04

2729

13754.16

... More
Item No.37 - Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Common SR Volume (2) (P-48,Itno8.41 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

38

167

6346

... More
Item No.38 - Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. Common SR Volume (2) (P 63,Itno9.30 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

11.27

2852

32142.04

... More
Item No.39 - Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Common SR Volume (2) (P-41, It No 8.3.1 ) 2023-24 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

156

354

55224

... More
Item No.40 - Providing and fixing flush door shutter made out of solid core black board type, well seasoned chemically treated hard wood battens and internal frame with minimum 45 mm wide wooden frame all-round door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door using liquid phenol formaldehyde resin as per IS specification 2202 (Part-I) 1991. From manufacturer (Factory) complete as per specification. - 35mm thick both side teak ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

6.3

3800

23940

... More
Item No.41 - Providing and fixing white vitercous china type pedestal type water closet(Europian type WC Pan Common SR Volume (2) (P-123, It No 14.2.1 ) 2023-24 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

1

4026

4026

... More
Item No.42 - Providing and fixing wash basin with C.I. brackets, 15 mm dia CP Brass single hole basin mixer of approved quality and make, including painting of fittings and brackets, cutting and making good the walls wherever required: using White Vitreous China Wash basin size 550x400 mm with a 15 mm CP Brass single hole basin mixer Common SR Volume (2) (P-125, It No 14.7(A)) ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

1

3599

3599

... More
Item No.43 - Providing and fixing unplasticised PVC connection pipe with brass unions : 15 mm nominal bore Common SR Volume (2) (P-116, It No 13.8.1.1) ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

1

83

83

... More
Item No.44 - Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete. 40 mm dia Common SR Volume (2) (P-136, It No 4.28.2.2) ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

1

92

92

... More
Item No.45 - Providing and fixing white vitreous china flat back or wall corner type lipped fronturinal basin of 430x260x350 mm or 340x410x265 mm sizes respectively.Common SR Volume (2) (P-135, It No 14.23) ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

1

1154

1154

... More
Item No.46 - Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Common SR Volume (2) (P-41, It No 8.3.1 ) 2023-24 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

195.91

174

34088.34

... More
Item No.47 - Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Common SR Volume (2) (P-48,Itno8.41 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

73.04

167

12197.68

... More
Item No.48 - Polishing in high gloss/matt finish melamine clear polish on wood work in required color/wooden shade texture with following process in the sequence as detailed below:1. The surface to be polished is rubbed with sand paper 80/120 no. and then with sand paper of 160/180 no. 2. Applying two coats of sealer with spray gun and allowing sufficient drying time for 1st coat and 2nd coat is allowed to dry for 8 to 12 hrs.3. On drying of sealer coat, wet rubbing with emery cloth of finer grading with ample water to remove excess sealer layer and make the surface further smooth after this wet rubbing, then surface is applied with special grade melamine fillers to fill all the small and big holes/grooves etc. Filler coat to be allowed to dry for 4 to 6 hrs on which again a light wet rubbing is done this surface isfurther allowed to dry for 12 hrs.Common SR Volume (2) (P-54,It No 8.82 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

36.96

677

25021.92

... More
Item No.49 - Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge Common SR Volume (2) (P-48, It No 8.39 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

771.7

95

73311.5

... More
Item No.50 - Extra for removing white wash or colour wash by steel brushing and / or scraping, sand papering the ceiling and / or sloping roof surface smooth including repairs to scraches, cost of material, labour, complete as per specifications.Common SR Volume (2) (P-85, It No 11.34(A) ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

1006.85

10

10068.5

... More
Item No.51 - KSRB 8.6-8 : Providing and fixing on wall surface. 40 kg / sq.cm H.D.P.E. rain down water pipes 110mm outer dia. approved make and brand with necessary specials like shoes, bends and offsets fixed with iron clamps, wall plugs, screws, including cost of materials, labour, complete as per specifications. (P.No. 47/ I.No. 8.19 of CSR 2015-16) ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.

33

426

14058



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.