Rural Water Supply And Sanitation Department Tender
... More
The RWSS has issued a formal invitation for competitive bids for the Rural Water Supply And Sanitation Department project, for Providing Htc To Fhtc 429 Households In Mattiwad Village Of Hukkeri Taluka In Belagavi District. Through Svs Village. in Belagavi, Karnataka, with an estimated contract value of Rs. 39,59,839. The bid opening date for this tender is 28-01-2021 and the last date for bid submission is 05-02-2021. Interested bidders for Rural Water Supply And Sanitation Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 43,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
RWSSD/2020-21/WS/WORK_INDENT28285Bid Award Id
ViewTender No
RWSSD/2020-21/WS/WORK_INDENT28285Tender Authority
Rural Water Supply And Sanitation Department ViewPurchaser Address
-Website
http://eproc.karnataka.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Cutting of road surface for pipeline trenches and disposing of the excavated stuff as directed including barricading, danger lighting etc. in the following classification. Cutting in Asphalt road surface with all lead and lifts as per direction of the Engineer-in-charge of the work. ---- With all lead and lifts etc., Complete as per direction of the Engineer in charge of the work.
88.83
-
50553.15
... More
Giving hydraulic test for C.I. / R.C.C. / P.V.C. / H.D.P.E/ D.I /A.C. pipelines to the pressure equal to two times the working pressure including cost of supply of water upto 80mm dia with all lead and lifts as per direction of the Engineer-in-charge of the work. ---- With all lead and lifts etc., Complete as per direction of the Engineer in charge of the work.
2360
-
11398.8
... More
Earth work excavatoin for water Supply & Sanitary lines, Electrical conduits either in pits or pipe line trenches (upto 600mm Trench width) as per drawing and technical specification, including setting out, construction of shoring, strutting, barricading, danger lighting, bracing, using sight rails & boning rods at every 100 mm whevere necessary removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench, including backfilling the excavated earth to the extent required and utilising the remaining available excavated earth locally for the work. in the following strata classifications Ordinary soil/Hard soil Means by Mechanical Means with all lead and lifts as per direction of the Engineer-in-charge of the work. ---- With all lead and lifts etc., Complete as per direction of the Engineer in charge of the work.
285.53
-
38974.84
... More
Earthwork excavation for pipeline trenches including depositing on bank upto a lead of 50 mtrs and depth up to 2.00 mtrs. Including shoring and strutting, danger lighting and using sight rails and boning rods at every 100 mtrs. Wherever necessary as directed in the following strata. (Manual Means) a) - do- In Hard soil with all lead and lifts as per direction of the Engineer-in-charge of the work. ---- With all lead and lifts etc., Complete as per direction of the Engineer in charge of the work.
156.09
-
42940.36
... More
Cutting of road surface for pipeline trenches and disposing of the excavated stuff as directed including barricading, danger lighting etc. in the following classification. Cutting in Cement concrete road surface with all lead and lifts as per direction of the Engineer-in-charge of the work. ---- With all lead and lifts etc., Complete as per direction of the Engineer in charge of the work.
57.11
-
66321.84
... More
Refilling the basement and pipeline trenches with selected available earth from trench excavation including watering, Consolidation in layers of 15 cm thick including disposing of the surplus earth with all lead & lifts. (Compacting with vibro roller) with all lead and lifts as per direction of the Engineer-in-charge of the work. ---- With all lead and lifts etc., Complete as per direction of the Engineer in charge of the work.
520.29
-
56269.36
... More
Supply and delivery of Resilient seated soft sealing Sluice Valves with body, bonnet of Ductile Iron of grade GGG50, wedge fully rubber lined with EPDM and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face dimensions as per BS 5163-89/IS 14846-2000/ DIN 3202 F4/F5. The stem sealing should be with Toroidal sealing rings (minimum 2 'O' rings). All the valves should be with electrostatic powder coating both inside and outside with pocket less body passage. The valves shall be supplied with suitable size galvanized bolts and nuts of required numbers as per relevant IS. For scour /Sluice valve 80 mm dia with all lead and lifts as per direction of the Engineer-in-charge of the work. ---- With all lead and lifts etc., Complete as per direction of the Engineer in charge of the work.
3
-
25656
... More
Providing and laying in position plain cement concrete of mix M20 with OPC cement @ 300kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.43cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation,plinth and cills, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. with all lead and lifts as per direction of the Engineer-in-charge of the work. ---- With all lead and lifts etc., Complete as per direction of the Engineer in charge of the work.
136.42
-
770063.62
... More
Giving hydraulic test for C.I. / R.C.C. / P.V.C. / H.D.P.E/ D.I /A.C. pipelines to the pressure equal to two times the working pressure including cost of supply of water 80mm dia to 100mm dia with all lead and lifts as per direction of the Engineer-in-charge of the work. ---- With all lead and lifts etc., Complete as per direction of the Engineer in charge of the work.
460
-
2801.4
... More
Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete 90 mm dia PVC 4 KSC with all lead and lifts as per direction of the Engineer-in-charge of the work. ---- With all lead and lifts etc., Complete as per direction of the Engineer in charge of the work.
460
-
68586
... More
Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete 75 mm dia PVC 4 KSC with all lead and lifts as per direction of the Engineer-in-charge of the work. ---- With all lead and lifts etc., Complete as per direction of the Engineer in charge of the work.
740
-
91686
... More
Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete 63 mm dia PVC 4 KSC with all lead and lifts as per direction of the Engineer-in-charge of the work. ---- With all lead and lifts etc., Complete as per direction of the Engineer in charge of the work.
1620
-
163296
... More
Earthwork excavation for pipeline trenches including depositing on bank upto a lead of 50 mtrs and depth up to 2.00 mtrs. Including shoring and strutting, danger lighting and using sight rails and boning rods at every 100 mtrs. Wherever necessary as directed in the following strata. (Manual Means) - do- in ordinary Soil with all lead and lifts as per direction of the Engineer-in-charge of the work. ---- With all lead and lifts etc., Complete as per direction of the Engineer in charge of the work.
364.2
-
100191.42