Directorate Of Municipal Administration Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Directorate Of Municipal Administration - DMA Tender

Opening Date13 Jul 2021
Closing Date19 Aug 2021
Tender Amount₹ 9,89,00,000 
Notes
Download

Costs

Summary

Package No.8 : 1) Construction Of Cc Raod And Cc Drain From Dasharathamurthy House To Thota Through Modern School In Vinayaka Badavane Ward No 40 Cc Drain And Development Of Road Ugd And Box Drain (complete Name Of Work As Per Notification) Under Mgnvy In Davanagere Cc Limits.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
KSRRB M300- Construction of Embankment with Material Gravel/ Murrum. KSRRB M300-53. Construction of embankment with approved material Gravel/Murrum with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement Table 300- 2 complete as per specifications.(Including cost of gravel / murrum, watering charges & compaction by vibratory roller to 95% of proctors density) MORTH Specification No. 305 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

5950.93

-

2586869.27

... More
Construction of granular sub-base Grading-Vas Sub-base and drainage layer by providing coarse graded crushed stone aggregates of granite/ trap/basalt material, mixing in a mechanical mix plant at OMC, Carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the 98% proctor density, complete as per specifications. Clause 401 of MORTH V Revision ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

2281.65

-

4796256.46

... More
KSRRB M400- Wet Mix Macadam KSRRB M400-17. Providing, laying, spreading and compacting crushed stone aggregates of granite / trap / basalt to wet mix macadam specifications including pre mixing the material with water at OMC in mechanical mix plant carriage of mixed method of tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per specifications. MORTH Specification No. 406 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

5483.07

-

11911695.42

... More
KSRB 14.6-2 :Providing and laying heavy duty cobble stones 75mm thick interlock pavers, using cement and course sand for manufacture of blocks of approved size, shape and colour with a minimum compressive strength of 281 kg per sqm over 50mm thick sand bed (average thickness ) and compacting with plate vibrator having 3 tons compaction force thereby forcing part of sand underneath to come up in between joints, final compaction of paver surface joints into its final level, including cost of materials, labour and HOM of machineries complete as per specifications. Specification No. KBS ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

6.84

-

8079.75

... More
KSRRB 500-2. Cleaning the existing black topped surface with brooms, soft brushes and finally dusting with old gunny bags and / or compressed air to receive bituminous treatment including cost of all materials, labour, HOM of machineries complete as per specifications. MORTH specification clause 501 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

5113.75

-

26847.19

... More
Providing and fixing RCC name board of size 1.35xk0.60x0.04 mtrs fixed in reinforced cement concrete poles of size 0.1OxO.1Ox2.60mtrs in cement concrete M 20 proportion using 20mm and down size graded metal machine mixed with 1Omm dia main steel bars and 8mm dia stirups. The board shall be provided with 12mm thick cement plaster in cement mortar 1 :3 on both the sides. The poles shall be embedded in the ground for a depth of0.5 mtrs with cement concrete M 10 proportion. The board shall be fixed as per the drawing and atthe place indicated by the Engineer incharge of the work. The cost includes excavation, bare cost of all materials, cost of steel, centering, transportation charges, fixing charges, labour, HOM etc., The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

14

-

80850

... More
KSRRB M300-19. Removal of unserviceable soil including excavation, loading and disposal but excluding replacement by suitable soil which shall be paid separately as per clause 300.5 complete as per specifications. MORTH Specification No. 301 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

12103.47

-

419385.24

... More
Earth work excavation for foundation of structures by mechanical means as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising / transporting the remaining earth locally upto 1.00km lead. (Depth upto 3.00 Mts) -In all types of soil ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

2817.2

-

153819.12

... More
KSRB 4-6.3 : Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for flat surface such as suspended floors, roofs, landings, balconies and likes, thickness above 200 mm including cost of all materials, labour complete as per Specification. Specification No. KBS 4.6.2 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

166.72

-

77024.64

... More
KSRB 4-6.4 : Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for vertical surface such as walls at any thickness, including attached pilasters, buttresses, plinth cills and string courses cost of all materials, labour complete as per specifications. Specification No. KBS 4.6.2 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

2980.52

-

1120377.47

... More
KSRRB 200-8. Clearing and grubbing road land including uprooting rank vegetation, grass, brush, shrubs, saplings and trees of girth upto 300mm, by manual means, in area of light jungle, removal of stumps, disposal of unserviceable materials, stacking of serviceable materials labour charges complete as per specifications. MORTH / Chapter 2 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

544

-

5712

... More
Providing and fixing M.S.Grill over existing compound wall as per Chief Architect drawing No. 12686, using 16mm x 16mm M.S.Square rod at 150mm c/c spacing and 6mm x 40mm M.S. flats at horizontal and 6mm x12mm M.S. flat for ornamental design and providing shop edge design at the vertex of every vertical rods, including welding, grinding wherever necessary. All the steel surface should be thoroughly cleaned free of rust and painted with anti corrosive paint (shop paint) etc., complete. The work includes cost of all materials, labour charges for all items of work, hire charges for welding, cutting and grinding equipment, and electricity charges, etc., complete as per specification. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

269.1

-

1517037.8

... More
Fabricating, supplying and erecting M.S. TubularTruss of span upto 10m. The bottom and top member is provided with 50x50x6mm double equal angles, welded back to back and in between top and bottom line, in areas of mid section is provided with 50x50x6mm equal single angle for vertical and inclined members and at supporting ends 40x40x5mm single angle is provided. All the members are welded together with 6mm gusset plate as per Drawing. The entire truss is anchored in RCC column by using 4 Nos. of M.S. anchor bolts at each support, with 10mm thick base plate and shoe plate.The work includes cutting, straightening, placing in position of M.S angle and wleding wherever necessary, and applying one coat of red oxide primer coat to all themembers including cost of all materials, labour charges, and hire charges of machineries for cutting, welding, grinding and erection equipments, with all lead and lift, transportation, etc., complete as per specification. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

14.07

-

1625.08

... More
Fabricating, providing and erecting in poiston of M S Ornamental security Grill Gate without hot dip using 75 x 12mm M S Flat for alround frame work with verticals at the centre and horizontal centere support M S Square of 20 x20 mm of different heights as shown in the drawing are to be fixed at 16 cms C/C for suqare bars of full height and at 8cms C / C for bottom rods providg ornamental C I Designers at the botom and C I arrows inthe midle and top. The entire frame work is to be fixed by means of expansion bolts to the brick pillars with necesary drillling holes. the work includes providng two coats of enamel painting over one coatr of red lead ready mix primer coat etc complete cost of all labour, painting, erection charges using hoist pulleycranes with all lead and lift, loading, transporting and unloading using hoist pulley cranes, scaffolding charges and all other incidental charges required for successful completion fo the work as per specification and drawings ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

12

-

1663.2

... More
KSRB 15-18.2 : Providing and applying enamel metal paint two coats ( excluding priming coat ) over new steel or other metal surface brushing to give an even shade after cleaning oil, grease, dirt and other foreign matter, including cost of materials, labour, complete as per specifications. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

322.7

-

31172.82

... More
KSRRB 300-48. Scarifying kankar I gravel/ metal crust by mechanical means upto 150mm thick disposal of stuff including cost of all labour charges, HOM complete as per specifications. MORTH I Chapter 3 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

920

-

23184

... More
KSRRB M800- Cable Duct Across the road KSRRB M800-29.1. Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings complete as per specifications. Case - I : Single row for one utility service ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

344.5

-

678957.82

... More
Providing and fixing pre cast solid cement concrete kerb stones made out of C.C. 1:2:4 with top and bottom width 114 and 165 mm respectively, 400mm high and 450mm in length finished with CM 1:3 plastering and finishing cutting, including form work, curing, including cost of all materials, labour, hire charges of machinery, loading, unloading, lead and lift, transportation etc., complete. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

2524

-

1121034.6

... More
KSRB 14.6-1: Providing and laying heavy duty cobble stones 60mm thick interlock pavers, using cement and course sand for manufacture of blocks of approved size, shape and colour with a minimum compressive strength of 281 kg per sqm over 50mm thick sand bed (average thickness ) and compacting with plate vibrator having 3 tons compaction force thereby forcing part of sand underneath to come up in between joints, final compaction of paver surface joints into its final level, including cost of materials, labour and HOM of machineries complete as per specifications. Specification No. KBS ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

2932.6

-

3288617.64

... More
KSRRB M800-13.Road Marking with Hot Applied Thermoplastic Compound with Reflectrising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes complete as per specifications. MORTH Specification No. 803 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

298.2

-

142465.05

... More
KSRRB M800 Road markers I Road stud KSRRB MS00-35. Supply and lnstalltion of Moulded Shank Raised Pavement Markers made of polycarbonate and ABS(Acrylonitrile Butadiene Styrene) moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to Specifications of Category A of MORTH Circular No RW/ NH/33023/10-97- DO Ill Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 1DO mm and 102 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 mm and height not less than 30 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

213.6

-

64816.92

... More
Removing and resetting of footpath slab ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

193.05

-

39932.39

... More
KSRRB M200-13.1. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts complete as per specifications. II. By Mechanical Means. A. Cement Concrete Grade M-15 &M-20. MORTH Specification No. 202 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

493.87

-

202239.76

... More
KSRRB M200-12.2. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts complete as per specifications. i) Lime /Cement Concrete. I. By Manual Means :B. Cement Concrete Grade M-15 & M-20. MORTH Specification No. 202 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

91.8

-

53689.23

... More
KSRRB 300 - Excavation for road, drains and similar works KSRRB 300-1. Earthwork excavation by manual means in ordinary soil involving an average horizontal throw upto 2 meters and an average lift upto 0.5 m, excavated surface leveled and sides neatly dressed, the disposed earth to be leveled neatly after breaking of clods complete as per specifications. MORTH / Chapter 3 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

447

-

61015.5

... More
KSRB 2-4 : Refilling available earth around pipe lines, cables in layers not exceeding 20cms in depth, compacting each deposited layer by ramming after watering with lead upto 50m. and lift upto 1.5 m. including cost of all labour complete as per specifications. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

151.98

-

19309.06

... More
KSRRB M600-1.Providing and Constructing dry lean cement concrete mix CC 1:5:10 base with OPC 25mm and down size graded granite metal coarse aggregate at 0.86cum and fine aggregates @0.58cum over a prepared sub-base, coarse and fine aggregate conforming to IS: 383-2016,aggregate cement ratio not to exceed 15:1, Aggregate gradation after blending to be as per Table 600-1,optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver, compacting with 8-10 tonnes vibratory roller, finishing and curing complete as per specifications. Clause 601of MORTH V Revision and IS 456 Table-5 with OPC at 150 kg/cum and coarse aggregate 0.86cum, fine aggregate 0.58cum using Concrete Batch mix Plant at 75 cum/hr capacity with Slip form paver with electronic sensor. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

163.4

-

730922.51

... More
Constructing un-reinforced, plain cement concrete for pavements using Grade concrete M30 over a prepared base with OPC coarse aggregate at 0.69 cum, fine aggregates at 0.46 cum,Coarse and fine aggregate conforming to IS:383-2016, with Superplastizer at 3 Its conforming to IS 9103-2008. mixed in a concrete mixer of not less than 0.6 cum capacity and appropriate weigh batcher as per approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing). & Spreading the concrete with shovels, rackers compacted using needle, screed and plate vibrator and finished with floaters in a continuous operation including provision of contraction, expansion, construction and longitudinal joints,including groove cutting charges, joint filler, separation membrane of impermiable plastic sheet of 125 micron, sealant primer, joint sealant, admixtures as approved, curing compound, finishing to lines and grades, textured with texturing machine, and curing including cost of all materials, labour,hire charges of machineries,all lead & lift charges etc., complete as per specifications. with OPC at 360 kg/cum and coarse aggregate 0.69cum, fine aggregate 0.46cum. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

228

-

1340466.72

... More
KSRRB M500-6. Providing and applying primer coat with S.S. bitumen emulsion on prepared surface of granular base such as WMM including cleaning of road surface and spraying primer at the rate of 0.60 kg / sqm using mechanical means complete as per specifications. MORTH Specification No. 502 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

3276.75

-

107084.19

... More
KSRRB 500-7. Providing and applying tack coat using 80/100 grade bitumen(VG10) on the prepared black topped surfaces at 2.5 kg per 10 sqm, heating bitumen in boiler fitted with spray set (excluding cleaning of road surface) including cost of all materials, labour, HOM of machineries complete as per specifications. MORTH/Chapter 5 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

1081.75

-

14592.81

... More
KSRRB 500-11. Providing and laying bituminous macadam on prepared surface with crushed coarse aggregates as per design mix formula for base / binding course including loading of aggregates with F.E. loader, hot mixing of stone aggregates and bitumen in hot mix plant, transporting the mixd material in tipper to paver and laying mixed materials with paver finisher to the required level and grade, rolling by power roller to achieve the desired density, but excluding cost of primer / tack coat including lead, lift and cost of all materials, labour, HOM of machineries complete as per specifications. MORTH /Chapter 5 - using 40/60 TPH capacity H.M.P. with Mechanical paver Gr-II (50 mm to 75 mm) with 3.3 % VG-30 Bitumen ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

217.93

-

1369472.12

... More
KSRRB M500-10. Providing and applying tack coat using 80/100 grade bitumen(VG10) in boiler fitted with spray set distributor at the rate of 0.20 kg per sqm on the existing prepared bituminous surface cleaned with mchancial broom. complete as per specifications. - using bitumen 80/100 on primed surfaces ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

4358.5

-

54219.74

... More
KSRRB M500-18. Providing and laying semi dense bituminous concrete using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete in all respects complete as per specifications. - using40/60 TPH capacity H.M.P. with Mechanical Paver Gr-II (25 mm to 30 mm) with 5 % VG-30 Bitumen ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

108.96

-

874581.6

... More
Earth work excavation by manual means for pipeline trenches (except building works) including depositing on bank with all lead including shoring, strutting, barricading, danger lighting and using sight rails and boning rods at every 100 metres wherever necessary as directed in the following strata.(BSR 2018-19, P.No.3, It.No-1)i) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

27

-

7427.7

... More
Repairs to Manholes for different depths including removal of debris, levelling the brick masonary, construction of brick masonary upto Ground level, providing CC coping alround the manhole cover, plastering both inside and outside to the brick masonary and fixing of manhole frame and cover, curing, refilling etc., completeUpto 0.3 m depth[BSR 2018-19 P - 120 It.No - 16] ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

40

-

268170

... More
KSRB 4-1.2 : Providing and laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @0.892cum and fine aggregates @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Specification No. KBS 4.1, 4.2 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

131.42

-

803737.12

... More
Providing and laying plain/reinforced cement concrete for side drains using M20 nominal mix concrete with OPC cement at 300 kgs. with 20mm and down size granite metal coarse aggregates at 0.69 cum and fine aggregates at 0.43 cum machine mixed, well compacted for walls and bottom including centering, shuttering, cost of materials, HOM of machinery, curing etc., complete excluding cost of steel as per MORTH specification No. 1500,1700, 2200. Wall & bottom thickness 15cm ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

401.34

-

3231517.44

... More
KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of Design mix M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.460 cum, with super plasticisers @ 3 liters confirming to is 9103-1999 reafirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness) including attached pilasters, columnspillars, posts, struts, buttresses, bed blocks, anchor blocks & plinths etc., including cost of all materials, labour, HOM of machinery, curing, complete but excluding cost of reinforcement as per specifications. Specification No. KBS 4.1, 4.6 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

161.75

-

1081586.66

... More
KSRRB M2200- TMT/MS Bar Reinforcement KSRRB M2200-6. Supplying, fitting and placing TMT bar reinforcement in sub-structure complete as per drawing and Technical Specifications complete as per specificationsMORTH Specification No.1600 & 2200 - TMT Bars Fe 500 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

36.99

-

2937491.68

... More
KSRB 4-1.3 : Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180kgs, with 40mm and down size graded granite metal coarse aggregates @0.85cum and fine aggregates @ 0.57cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Specification No. KBS 4.1, 4.2 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

21.76

-

130659.44

... More
KSRB 5.2-2 : Providing and constructing granite / trap / basalt size stone masonry in foundation with cement mortar 1:8, stone hammerd dressed in courses not less than 20 cms high, bond stones at two m. apart in each course including cost of materials, labour, curing complete as per specifications. KBS 5.1.13 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

73.44

-

361305.71

... More
KSRB 5.3-3 : Providing and constructing granite / trap / basalt size stone masonry in basement with cement mortar 1:6, edges of stones chistle dressed in courses not less than 15 cms high, bond stones at two m. apart in each course including cost of materials, labour, curing complete as per specifications. KBS 5.1.13 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

53.87

-

322941.49

... More
KSRB 4-1.5 : Providing and laying in position plain cement concrete of mix M20 with OPC cement @ 300kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.43cum, with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation, plinth and cills, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Specification No. KBS 4.1, 4.2 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

11.03

-

69470.47

... More
KSRRB M500-6. Providing and applying primer coat with S.S. bitumen emulsion on prepared surface of granular base such as WMM including cleaning of road surface and spraying primer at the rate of 0.60 kg / sqm using mechanical means complete as per specifications. MORTH Specification No. 502 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

3885

-

126961.8

... More
KSRRB 500-7. Providing and applying tack coat using 80/100 grade bitumen(VG10) on the prepared black topped surfaces at 2.5 kg per 10 sqm, heating bitumen in boiler fitted with spray set (excluding cleaning of road surface) including cost of all materials, labour, HOM of machineries complete as per specifications. MORTH/Chapter 5 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

1320

-

17806.8

... More
KSRRB 500-11. Providing and laying bituminous macadam on prepared surface with crushed coarse aggregates as per design mix formula for base / binding course including loading of aggregates with F.E. loader, hot mixing of stone aggregates and bitumen in hot mix plant, transporting the mixd material in tipper to paver and laying mixed materials with paver finisher to the required level and grade, rolling by power roller to achieve the desired density, but excluding cost of primer / tack coat including lead, lift and cost of all materials, labour, HOM of machineries complete as per specifications. MORTH /Chapter 5 - using 40/60 TPH capacity H.M.P. with Mechanical paver Gr-II (50 mm to 75 mm) with 3.3 % VG-30 Bitumen ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

260.25

-

1635411

... More
KSRRB M500-10. Providing and applying tack coat using 80/100 grade bitumen(VG10) in boiler fitted with spray set distributor at the rate of 0.20 kg per sqm on the existing prepared bituminous surface cleaned with mchancial broom. complete as per specifications. - using bitumen 80/100 on primed surfaces ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

5205

-

64750.2

... More
KSRRB M500-18. Providing and laying semi dense bituminous concrete using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete in all respects complete as per specifications. - using40/60 TPH capacity H.M.P. with Mechanical Paver Gr-II (25 mm to 30 mm) with 5 % VG-30 Bitumen ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

130.13

-

1044505.36

... More
KSRRB M600-1.Providing and Constructing dry lean cement concrete mix CC 1:5:10 base with OPC 25mm and down size graded granite metal coarse aggregate at 0.86cum and fine aggregates @0.58cum over a prepared sub-base, coarse and fine aggregate conforming to IS: 383-2016,aggregate cement ratio not to exceed 15:1, Aggregate gradation after blending to be as per Table 600-1,optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver, compacting with 8-10 tonnes vibratory roller, finishing and curing complete as per specifications. Clause 601of MORTH V Revision and IS 456 Table-5 with OPC at 150 kg/cum and coarse aggregate 0.86cum, fine aggregate 0.58cum using Concrete Batch mix Plant at 75 cum/hr capacity with Slip form paver with electronic sensor. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

372.12

-

1664570.91

... More
Constructing un-reinforced, plain cement concrete for pavements using Grade concrete M30 over a prepared base with OPC coarse aggregate at 0.69 cum, fine aggregates at 0.46 cum,Coarse and fine aggregate conforming to IS:383-2016, with Superplastizer at 3 Its conforming to IS 9103-2008. mixed in a concrete mixer of not less than 0.6 cum capacity and appropriate weigh batcher as per approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing). & Spreading the concrete with shovels, rackers compacted using needle, screed and plate vibrator and finished with floaters in a continuous operation including provision of contraction, expansion, construction and longitudinal joints,including groove cutting charges, joint filler, separation membrane of impermiable plastic sheet of 125 micron, sealant primer, joint sealant, admixtures as approved, curing compound, finishing to lines and grades, textured with texturing machine, and curing including cost of all materials, labour,hire charges of machineries,all lead & lift charges etc., complete as per specifications. with OPC at 360 kg/cum and coarse aggregate 0.69cum, fine aggregate 0.46cum. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

528.3

-

3106002.49

... More
KSRB 4-1.3 : Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180kgs, with 40mm and down size graded granite metal coarse aggregates @0.85cum and fine aggregates @ 0.57cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Specification No. KBS 4.1, 4.2 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

299.94

-

1801010.73

... More
KSRB 4-1.5 : Providing and laying in position plain cement concrete of mix M20 with OPC cement @ 300kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.43cum, with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation, plinth and cills, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Specification No. KBS 4.1, 4.2 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

26

-

163756.32

... More
Earth work excavation by manual means for pipeline trenches (except building works) including depositing on bank with all lead including shoring, strutting, barricading, danger lighting and using sight rails and boning rods at every 100 metres wherever necessary as directed in the following strata.(BSR 2018-19, P.No.3, It.No-1)i) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

8.1

-

2228.31

... More
Repairs to Manholes for different depths including removal of debris, levelling the brick masonary, construction of brick masonary upto Ground level, providing CC coping alround the manhole cover, plastering both inside and outside to the brick masonary and fixing of manhole frame and cover, curing, refilling etc., completeUpto 0.6 m depth[BSR 2018-19 P - 120 It.No - 16] ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

5

-

67578

... More
KSRB 4-1.2 : Providing and laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @0.892cum and fine aggregates @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Specification No. KBS 4.1, 4.2 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

182.86

-

1118333.36

... More
Providing and laying plain/reinforced cement concrete for side drains using M20 nominal mix concrete with OPC cement at 300 kgs. with 20mm and down size granite metal coarse aggregates at 0.69 cum and fine aggregates at 0.43 cum machine mixed, well compacted for walls and bottom including centering, shuttering, cost of materials, HOM of machinery, curing etc., complete excluding cost of steel as per MORTH specification No. 1500,1700, 2200. Wall & bottom thickness 15cm ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

300.36

-

2418444.66

... More
KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of Design mix M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.460 cum, with super plasticisers @ 3 liters confirming to is 9103-1999 reafirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness) including attached pilasters, columnspillars, posts, struts, buttresses, bed blocks, anchor blocks & plinths etc., including cost of all materials, labour, HOM of machinery, curing, complete but excluding cost of reinforcement as per specifications. Specification No. KBS 4.1, 4.6 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

237.76

-

1589848.81

... More
KSRRB M2200- TMT/MS Bar Reinforcement KSRRB M2200-6. Supplying, fitting and placing TMT bar reinforcement in sub-structure complete as per drawing and Technical Specifications complete as per specificationsMORTH Specification No.1600 & 2200 - TMT Bars Fe 500 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

35.61

-

2827901.56

... More
KSRRB 500-7. Providing and applying tack coat using 80/100 grade bitumen(VG10) on the prepared black topped surfaces at 2.5 kg per 10 sqm, heating bitumen in boiler fitted with spray set (excluding cleaning of road surface) including cost of all materials, labour, HOM of machineries complete as per specifications. MORTH/Chapter 5 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

2712

-

36584.88

... More
KSRRB M500-6. Providing and applying primer coat with S.S. bitumen emulsion on prepared surface of granular base such as WMM including cleaning of road surface and spraying primer at the rate of 0.60 kg / sqm using mechanical means complete as per specifications. MORTH Specification No. 502 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

7300

-

238564

... More
KSRRB 500-11. Providing and laying bituminous macadam on prepared surface with crushed coarse aggregates as per design mix formula for base / binding course including loading of aggregates with F.E. loader, hot mixing of stone aggregates and bitumen in hot mix plant, transporting the mixd material in tipper to paver and laying mixed materials with paver finisher to the required level and grade, rolling by power roller to achieve the desired density, but excluding cost of primer / tack coat including lead, lift and cost of all materials, labour, HOM of machineries complete as per specifications. MORTH /Chapter 5 - using 40/60 TPH capacity H.M.P. with Mechanical paver Gr-II (50 mm to 75 mm) with 3.3 % VG-30 Bitumen ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

500.6

-

3145770.4

... More
KSRRB M500-10. Providing and applying tack coat using 80/100 grade bitumen(VG10) in boiler fitted with spray set distributor at the rate of 0.20 kg per sqm on the existing prepared bituminous surface cleaned with mchancial broom. complete as per specifications. - using bitumen 80/100 on primed surfaces ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

10012

-

124549.28

... More
KSRRB M500-18. Providing and laying semi dense bituminous concrete using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete in all respects complete as per specifications. - using40/60 TPH capacity H.M.P. with Mechanical Paver Gr-II (25 mm to 30 mm) with 5 % VG-30 Bitumen ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

250.3

-

2009065.49

... More
KSRB 4-1.2 : Providing and laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @0.892cum and fine aggregates @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Specification No. KBS 4.1, 4.2 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

77.88

-

476297.73

... More
Providing and laying plain/reinforced cement concrete for side drains using M20 nominal mix concrete with OPC cement at 300 kgs. with 20mm and down size granite metal coarse aggregates at 0.69 cum and fine aggregates at 0.43 cum machine mixed, well compacted for walls and bottom including centering, shuttering, cost of materials, HOM of machinery, curing etc., complete excluding cost of steel as per MORTH specification No. 1500,1700, 2200. Wall & bottom thickness 15cm ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

260.75

-

2099512.06

... More
KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of Design mix M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.460 cum, with super plasticisers @ 3 liters confirming to is 9103-1999 reafirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness) including attached pilasters, columnspillars, posts, struts, buttresses, bed blocks, anchor blocks & plinths etc., including cost of all materials, labour, HOM of machinery, curing, complete but excluding cost of reinforcement as per specifications. Specification No. KBS 4.1, 4.6 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

78.23

-

523106.8

... More
Providing and laying in position plain/Reinforced cement cement concrete M20 for sub-structure/Superstructure works, with cement @ 320 kgs, 20 mm & down size graded granite metal coarse aggregate @ 0.69 cum and fine aggregates @ 0.46 cum machine mixed with super plasticisers @ 3 lts confirming to IS 9103-2008,concrete laid in layers, well compacted and providing weep holes wherever necessary with necessary scaffolding, form work etc., including cost of labour, HOM curing etc., complete. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

11.85

-

70167.76

... More
KSRRB M2200- TMT/MS Bar Reinforcement KSRRB M2200-6. Supplying, fitting and placing TMT bar reinforcement in sub-structure complete as per drawing and Technical Specifications complete as per specificationsMORTH Specification No.1600 & 2200 - TMT Bars Fe 500 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

22.98

-

1824913.73

... More
KSRRB M600-1.Providing and Constructing dry lean cement concrete mix CC 1:5:10 base with OPC 25mm and down size graded granite metal coarse aggregate at 0.86cum and fine aggregates @0.58cum over a prepared sub-base, coarse and fine aggregate conforming to IS: 383-2016,aggregate cement ratio not to exceed 15:1, Aggregate gradation after blending to be as per Table 600-1,optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver, compacting with 8-10 tonnes vibratory roller, finishing and curing complete as per specifications. Clause 601of MORTH V Revision and IS 456 Table-5 with OPC at 150 kg/cum and coarse aggregate 0.86cum, fine aggregate 0.58cum using Concrete Batch mix Plant at 75 cum/hr capacity with Slip form paver with electronic sensor. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

482.65

-

2158994.81

... More
Constructing un-reinforced, plain cement concrete for pavements using Grade concrete M30 over a prepared base with OPC coarse aggregate at 0.69 cum, fine aggregates at 0.46 cum,Coarse and fine aggregate conforming to IS:383-2016, with Superplastizer at 3 Its conforming to IS 9103-2008. mixed in a concrete mixer of not less than 0.6 cum capacity and appropriate weigh batcher as per approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing). & Spreading the concrete with shovels, rackers compacted using needle, screed and plate vibrator and finished with floaters in a continuous operation including provision of contraction, expansion, construction and longitudinal joints,including groove cutting charges, joint filler, separation membrane of impermiable plastic sheet of 125 micron, sealant primer, joint sealant, admixtures as approved, curing compound, finishing to lines and grades, textured with texturing machine, and curing including cost of all materials, labour,hire charges of machineries,all lead & lift charges etc., complete as per specifications. with OPC at 360 kg/cum and coarse aggregate 0.69cum, fine aggregate 0.46cum. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

676.88

-

3979539.97

... More
KSRRB M500-6. Providing and applying primer coat with S.S. bitumen emulsion on prepared surface of granular base such as WMM including cleaning of road surface and spraying primer at the rate of 0.60 kg / sqm using mechanical means complete as per specifications. MORTH Specification No. 502 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

10766.5

-

351849.22

... More
KSRRB 500-11. Providing and laying bituminous macadam on prepared surface with crushed coarse aggregates as per design mix formula for base / binding course including loading of aggregates with F.E. loader, hot mixing of stone aggregates and bitumen in hot mix plant, transporting the mixd material in tipper to paver and laying mixed materials with paver finisher to the required level and grade, rolling by power roller to achieve the desired density, but excluding cost of primer / tack coat including lead, lift and cost of all materials, labour, HOM of machineries complete as per specifications. MORTH /Chapter 5 - using 40/60 TPH capacity H.M.P. with Mechanical paver Gr-II (50 mm to 75 mm) with 3.3 % VG-30 Bitumen ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

538.33

-

3382865.72

... More
KSRRB 500-7. Providing and applying tack coat using 80/100 grade bitumen(VG10) on the prepared black topped surfaces at 2.5 kg per 10 sqm, heating bitumen in boiler fitted with spray set (excluding cleaning of road surface) including cost of all materials, labour, HOM of machineries complete as per specifications. MORTH/Chapter 5 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

10766.5

-

133935.26

... More
KSRRB M500-18. Providing and laying semi dense bituminous concrete using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete in all respects complete as per specifications. - using40/60 TPH capacity H.M.P. with Mechanical Paver Gr-II (25 mm to 30 mm) with 5 % VG-30 Bitumen ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

269.16

-

2160447.73

... More
Earth work excavation by manual means for pipeline trenches (except building works) including depositing on bank with all lead including shoring, strutting, barricading, danger lighting and using sight rails and boning rods at every 100 metres wherever necessary as directed in the following strata.(BSR 2018-19, P.No.3, It.No-1)i) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

24.3

-

6684.93

... More
Repairs to Manholes for different depths including removal of debris, levelling the brick masonary, construction of brick masonary upto Ground level, providing CC coping alround the manhole cover, plastering both inside and outside to the brick masonary and fixing of manhole frame and cover, curing, refilling etc., complete Upto 0.6 m depth [BSR 2018-19 P - 120 It.No - 16] ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

15

-

202734

... More
KSRB 4-1.2 : Providing and laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @0.892cum and fine aggregates @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Specification No. KBS 4.1, 4.2 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

47.67

-

291539.71

... More
Providing and laying plain/reinforced cement concrete for side drains using M20 nominal mix concrete with OPC cement at 300 kgs. with 20mm and down size granite metal coarse aggregates at 0.69 cum and fine aggregates at 0.43 cum machine mixed, well compacted for walls and bottom including centering, shuttering, cost of materials, HOM of machinery, curing etc., complete excluding cost of steel as per MORTH specification No. 1500,1700, 2200. Wall & bottom thickness 15cm ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

151.32

-

1218401.4

... More
KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of Design mix M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.460 cum, with super plasticisers @ 3 liters confirming to is 9103-1999 reafirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness) including attached pilasters, columnspillars, posts, struts, buttresses, bed blocks, anchor blocks & plinths etc., including cost of all materials, labour, HOM of machinery, curing, complete but excluding cost of reinforcement as per specifications. Specification No. KBS 4.1, 4.6 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

55.48

-

370982.55

... More
KSRRB M2200- TMT/MS Bar Reinforcement KSRRB M2200-6. Supplying, fitting and placing TMT bar reinforcement in sub-structure complete as per drawing and Technical Specifications complete as per specificationsMORTH Specification No.1600 & 2200 - TMT Bars Fe 500 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.

13.57

-

1077636.17



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.