Directorate Of Municipal Administration Tender

... More
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Directorate Of Municipal Administration - DMA Tender

Works
Civil And Construction
Civil Works Others
Solid Waste Management
Opening Date12 Feb 2025
Closing Date15 Mar 2025
Tender Amount₹ 2,93,82,117.2 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1.9 - Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. SR Vol-1 2023-24 P No 7 I No 1.9

991.52

279

276931.536

... More
2.3.1 - Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates SR Vol-1 2023-24 P No 16 I No 2.3.1

227.56

6639

1510804.974

... More
22(5) - Form work centierng and shuttering 8% of (Footing) concrete rate Vol 2 PWD SR 2021-22 P NO A 7 I NO 22(5)

18.31

531

9724.9903

... More
22(5) - Form work centierng and shuttering 70% of (Foundation and sub structure) concrete rate Vol 2 PWD SR 2021-22 P NO A 7 I NO 22(5)

5.14

4647

23887.6874

... More
22(5) - Form work centierng and shuttering 50% of (Plinth Beam) concrete rate Vol 2 PWD SR 2021-22 P NO A 7 I NO 22(5)

142.05

3319

471546.339

... More
6.8 - Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.( public works department SCHEDULE OF RATES for BUILDINGS 2023 - 2024 VOLUME - 2 I.No.6.8 P.No.14)

31.05

8367

259809.3225

... More
8.4.2 - Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.PWD CSR 2023-24, Vol-II, P. No. 41, I. No. 8.4.2

397.63

327

130263.588

... More
8.33.1 - Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of Special primer applied @ 0.75 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree angle with 10 years life) PWD CSR 2023-24, Vol-II, P. No. 46, I. No. 8.33.1

397.63

165

65966.817

... More
2.11H - Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023 - 2024 GOVERNMENT OF KARNATAKAVOLUME - 1, P.No.71, I.No.2.11 h)

41.91

82961

3476918.5605

... More
17.1 - Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge. Volume-2 I.No 17.1 P.No 175

183.6

1052

193165.56

... More
3.6(305) - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (SCHEDULE OF RATES FOR ROAD AND BRIDGE WORKS 2023 - 2024 PUBLIC WORKS DEPARTMENT GOVERNMENT OF KARNATAKA VOLUME - 3 P.No.17, I.No.3.6(305))

991.14

517

513063.621

... More
4.17(406) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density (SCHEDULE OF RATES FOR ROAD AND BRIDGE WORKS 2023 - 2024 PUBLIC WORKS DEPARTMENT GOVERNMENT OF KARNATAKA VOLUME - 3 P.No.26, I.No.4.17 (406))

420

2686

1128519

... More
11.2 - Providing and fixing Structural Steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (Item No. 11.2, Page No. 77, Vol.2)

28000

118

3322200

... More
7.38 - Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 g/m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineerin-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. (Item No. 7.38, Page No. 26, Vol.2)

1279

596

762795.6

... More
11.4 - Providing and fixing 1 mm thick M.S. sheet sliding-shutters, with frame and diagonal braces of 40x40x6 mm angle iron, 3 mm M.S. gusset plates at the junctions and corners, 25 mm dia pulley, 40x40x6 mm angle and T- iron guide at the top and bottom respectively, including applying a priming coat of approved steel primer including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge (Item No. 11.4, Page No. 77, Vol.2)

30

5482

164461.5

... More
2.1.2 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. (Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates) (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023 -2024GOVERNMENT OF KARNATAKA VOLUME - 1 I.No.2.1.2 P.No.15)

60.9

5947

362184.48

... More
5.3 - Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (public works department SCHEDULE OF RATES for BUILDINGS 2023 - 2024 VOLUME - 2 Item No 5.3, P.No.09)

209.73

6515

1366443.3825

... More
5.4 - Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023-2024, Volume-II, P.No.9, I.No.5.4)

257.58

6708

1727962.551

... More
8.19.1 - Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge.PWD CSR 2023-24, Vol-II, P. No. 44, I. No. 8.19.1

893.88

267

239336.37

... More
2.2.1 - Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes,labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal sizegraded crushed coarse aggregates VOL-1 PWD DSR 2023-24 I.NO 2.2.1 P NO:15

66.05

6601

436019.1675

... More
a(7) - Formwork shall be added on percentage basis to the finished concrete item rate for footing formwork shall be considerd as 8% DSR 2023-24 Volume-II Page No. A(7)

56.3

528

29732.593

... More
2.5.1 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. VOL-1 PWD DSR 2023-24 I.NO 2.5.1 P NO:16 M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

73.62

6961

512505.63

... More
A(7) - Formwork shall be added on percentage basis to the finished concrete item rate for Drain formwork shall be considerd as 70% DSR 2023-24 Volume-II Page No. A(7)

65.69

4873

320110.6545

... More
6.34 - Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications.( public works department SCHEDULE OF RATES for BUILDINGS 2023 - 2024 VOLUME - 2 I.No.6.34 P.No.17)

1384.77

1159

1605225.384

... More
8.8 - Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (public works department SCHEDULE OF RATES for BUILDINGS 2023 - 2024 VOLUME - 2 I.No.8.8 P.No.42)

2769.54

389

1078874.307

... More
8.27 - Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (public works department SCHEDULE OF RATES for BUILDINGS 2023 - 2024 VOLUME - 2 I.No.8.27 P.No.45)

2769.54

55

154124.901

... More
8.39 - Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (public works department SCHEDULE OF RATES for BUILDINGS 2023 - 2024 VOLUME - 2 I.No.8.39 P.No.48)

2769.54

133

369318.159

... More
17.1 - Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge. Volume-2 I.No 17.1 P.No 175

717.04

1052

754397.784

... More
a(7) - Providing and laying 40mm size graded coarse aggregates /pebble stones for side as per drawing, specifications with all leads and lifts complete etc.,as directed by the Engineer. The rate includes cost of material, transportation, laying and compacting with all labour etc., (For drainage layers) :( PWD DSR 2023-24, Volume-I Page No. A-38, Item No. 7)

437.09

1249

546143.955

... More
10.1.4 - Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.( PWD DSR 2023-24 Volume-III Page No. 117, Item No. 12.4/710.1.4 OF IRC:78 and 2200)

126.15

2810

354544.575

... More
a-35 - HDPE membrane (Volume II P.No A-35 Sl No.437)

2180.68

300

654204

... More
11051 - Geotextile - 285 gsm :Providing and laying of 285 gsm non-woven geo-textile of approved make at landfill base to protect silt entering into the drainage media as per the specifications. The rate quoted shall include stitching, overlapping wastage and anchoring etc. complete as directed by Engineer- in-Charge. (CM SR 2021-22/P.No.99/Vol-3/A-11/051)

2180.68

210

457942.8

... More
9.1.9 - Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE PE 80 PN 6.0,200mm,(PWD DSR 2023-24, Volume-V Page No. 95, Item No.9.1.9)

50

1510

75547.5

... More
9.1.7 - Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE PE 80 PN 6.0,160mm,(PWD DSR 2023-24, Volume-V Page No. 95, Item No.9.1.7)

240

1006

241668

... More
A-40 - Supplying and providing protective soil layer 300mm thick Sand - M-Sand (PWD DSR 2023-24, Volume-1 Page No. A-40, SL No.64)

654.2

1476

965599.2

... More
2.5 - Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organicsoil not exceeding 150 mm in thickness.(COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023-24, Volume-I, P.No.9, I.No.2.5)By Mechanical Means using Dozer

1.55

508

787.71

... More
4.1 - Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usagecharges of machinery, complete as per specifications. (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023 -2024, Volume-II, P.No.5, I.No.4.1

38.8

123

4807.32

... More
2.4.1 - Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant ISCodes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all otherappurtenances required to complete the work as per technical specifications (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023-2024, Volume-I, P.No.16, I.No.2.4.1) Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates

5.16

6724

34696.872

... More
22-2 - Formwork shall be added on percentage basis to the finished concrete item rate for formwork shall be considerd as 60% DSR 2023-24 Volume-II Page No. A(7) Item No.22-2 For foundation RCC Beams & Lintels

4.14

4176

17292.366

... More
A(7) - Formwork shall be added on percentage basis to the finished concrete item rate for formwork shall be considerd as 45%% DSR 2023-24 Volume-II Page No. A(7) Item No.23-24 For Chejja

0.36

3132

1127.7648

... More
A(7) - Formwork shall be added on percentage basis to the finished concrete item rate for Drain formwork shall be considerd as 50% DSR 2023-24 Volume-II Page No. A(7) Item No.22-2 For foundation Roof slab

3.43

3480

11938.9725

... More
2.11h - Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023-2024, Volume-I, P.No.18, I.No.2.11h)

1.46

93929

137137.581

... More
6.2 - Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete asper the direction of engineer incharge of work (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023-2024, Volume-II, P.No.13, I.No.6.2)

16.02

8376

134197.938

... More
6.14 - Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:3 (1 cement :3 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023-2024, Volume-II, P.No.14, I.No.6.14)

6.19

1113

6889.47

... More
8.2.1 - Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023-2024, Volume-II, P.No.41, I.No.8.2.1)

59.39

309

18396.0525

... More
8.9 - Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023-2024, Volume-II, P.No.42, I.No.8.9)

55.73

404

22528.8525

... More
8.10 - Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3fine sand) on concrete surface / ceilings including rounding off cornerswherever required smooth rendering, providing and removing scaffolding,including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023-2024, Volume-II, P.No.43, I.No.8.10)

29.06

221

6438.243

... More
15.1 - Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023-2024, Volume-II, P.No.149, I.No.15.1)

26.38

857

22630.083

... More
8.25 - Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023-2024, Volume-II, P.No.45, I.No.8.25)

30.66

143

4410.441

... More
8.28 - Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023-2024, Volume-II, P.No.45, I.No.8.28)

55.73

93

5207.9685

... More
8.21 - Providing Colour washing such as green, blue or buff to give an even shade :New work (two coats) with a base coat of white washing with lime with colour of approved quality, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023-2024, Volume-II, P.No.44, I.No.8.21)

29.06

35

1037.442

... More
9.17.2 - Providing and laying Vitrified tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023-2024, Volume-II, P.No.61, I.No.9.17.2) Size of Tile 600x600mm

15.66

1233

19320.525

... More
11.34B - Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. PWD CSR 2023-24, Vol-II, P. No. 86, I. No. 11.34B

12.15

192

2334.6225

... More
12.83.2 - Providing and fixing factory made uPVC door frame made of uPVC extruded sections having an overall dimension as below tolerance 1mm with wall thickness 2.0 mm 0.2 mm corners of the door frame to be Jointed with galvanized brackets and stainless steel screws, joints mitred and Plastic welded. The hinge side vertical of the frames reinforced by galvanized M.S. tube of size 19 19 mm and 1mm ( 0.1 mm) wall thickness and 3 nos.stainless steel hinges fixed to the frame complete as per manufacturer’s specification and direction of Engineer- in-charge 42X50 mm PVC Extruded section PWD CSR 2023-24, Vol-II, P. No. 108, I. No. 12.83.2

8.1

250

2032.695

... More
12.84 - Providing & fixing of 2-track x 2 panel sliding windows made out of multi chambered UPVC(Matching to RAL 9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight with reinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVC honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with Crescent Locks. Wall thickness of frame & sash shall be of 2 mm.Maximum possible size 1219mm X 1219mm. (The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) PWD CSR 2023-24, Vol-II, P. No. 108, I. No. 12.84

6.48

5274

34176.492

... More
12.92 - Providing& fixing of Openable door made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPV(Thermo Plastic Vulcanized) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the openable frame. The frame having overall size of 60mm x 55mm with GI reinforcement of 1mm thickness and openable sash with overall size of 60mm x 102mm and GI reinforcement of 2mm thickness. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 34 mm. Windows shall be provided with 6mm plain float glass, Standard hardware with 2D/3D hinge & Multi point locking system with Handle. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 900mm x 2400mm. (The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) PWD CSR 2023-24, Vol-II, P. No. 111, I. No. 12.92

5.34

6557

35015.715

... More
10.14.14 - Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof includingjointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from theexcavationetc. complete. 6 Kg/m2: 200mm(weight of pipe -6.233 kg) (p.no.120. it.no 10.14.14) 2023-24 WATER SUPPLY AND UGD WORKS COMMON SCHEDULE OF RATES VOLUME-V

50

1015

50767.5

... More
1.1.1 - Concealed PVC Conduit System Supplying heavy gauge PVC Conduit Pipe . dia . mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 19/20 mm dia 2mm thick (P.no.2.it.no.1.1.1) (PWD CSR for Electrical Works for the Year 2023-24)

100

72

7245

... More
22(5) - Form work centierng and shuttering 20% of (Foundation and sub structure) concrete rate Vol 2 PWD SR 2023-24 P NO A 7 I NO 22(5)

8.4

1320

11090.268

... More
16.23.1 - Providing and fixing SFRC frame and cover conforming to IS 12592 (part-I)-1988 and IS 12592 (part-II)- 1991 with latest amendment, including cutting slabs to the required size for the opening and fixing the cover in C.C. 1:2:4 and C.M. 1:3 plastering 20 mm thick to all exposed faces, curing for 10 days with all lead and lift with appurtenances. complete. Medium Duty COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023-2024, Volume-II, P.No.15, I.No.16.23.1)

2

2009

4019.4

... More
1.14.1 - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023-24, Volume-I, P.No.9, I.No.1.14.1)In all kinds of soils Depth upto 3 m

39.72

112

4456.584

... More
22(5) - Form work centierng and shuttering 10% ofEarth retaining structures concrete rate Vol 1 PWD SR 2023-24 P NO A 7 I NO 22(5)

1.68

663

1115.3856

... More
1.12 - Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. (In all kinds of soils upto 300 mm depth) (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023 - 2024 GOVERNMENT OF KARNATAKAVOLUME - 1 P.No.8, I.No.1.12)

420

99

41895

... More
4.1V - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (SCHEDULE OF RATES FOR ROAD AND BRIDGE WORKS 2023 - 2024 PUBLIC WORKS DEPARTMENT GOVERNMENT OF KARNATAKA VOLUME - 3 P.No.23, I.No.4.1 (v)

135

2611

352532.25

... More
16.28 - Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383:2016:, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant, curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work.KPWD SR 2023-24 VOL-III I NO 16.28 P No 149

120

7091

851004

... More
22-2 - Formwork shall be added on percentage basis to the finished concrete item rate for Drain formwork shall be considerd as 35% DSR 2023-24 Volume-II Page No. A(7) Item No.22-2

62

2323

144069.4

... More
A(7) - Formwork shall be added on percentage basis to the finished concrete item rate for footing formwork shall be considerd as 8% DSR 2023-24 Volume-II Page No. A(7) Item No.22-2 For foundation

2.42

537

1301.5486

... More
A-7 - Formwork shall be added on percentage basis to the finished concrete item rate for formwork shall be considerd as 20% DSR 2023-24 Volume-II Page No. A(7) Item No.22-2 For Cover slab

0.45

1344

605.178

... More
8.36.2 - Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On concrete work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023-2024, Volume-II, P.No.48, I.No.8.36.2)

33.96

180

6133.176

... More
A-38 - a) Granular Aggregates (20mm downsize)(COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS2023 - 2024 GOVERNMENT OF KARNATAKA VOLUME -1 Sl.No.4 P.No.A-38)

0.94

1399

1315.671

... More
A-19 - Coarse sand (SCHEDULE OF RATES for BUILDINGS 2023 - 2024 VOLUME - 2 Sl.No.238 P.No.A-19)

3.3

1549

5114.34

... More
22-2 - Formwork shall be added on percentage basis to the finished concrete item rate for Cover slab formwork shall be considerd as 20% DSR 2023-24 Volume-II Page No. A(7) Item No.22-2

0.16

1327

212.4528

... More
22-2 - Formwork shall be added on percentage basis to the finished concrete item rate for cover slab formwork shall be considerd as 20% DSR 2023-24 Volume-II Page No. A(7) Item No.22-2

1.35

1320

1782.3645

... More
12.4 - Geophysical investigation at site for sinking borewells for Providing drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers's method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and projection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yeild test etc complete (As per PWD SR 2021-22 Volume-V, Page No.140, I.No.12.4 )

1

5288

5288

... More
12.1.1 - Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) (As per PWD SR 2023-24 Volume-V, Page No.139, I.No.12.1.1 & 12.1.2 )A)Borewell depth of 0 to 50 m

50

388

19425

... More
12.1.2 - B) Borewell depth of 50 to 100 m

50

487

24360

... More
12.1.3 - C) Borewell depth of 100 to 150 Mtrs

25

517

12941.25

... More
11.2.6 - Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testingfor water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For: Heavy Duty GI Pipe etc. complete. For Heavy Duty GI pipe: Medium Duty GI pipe of 50mm dia (As per PWD SR2023-24 Volume-V, Page No.127, I.No.11.2.6)

60

613

36792

... More
13.15.4 - Providing Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications, to work site as per necessary ammendments and instructions of engineer incharge of work. For 7.50 HP - 155 LPM @ 112 m = 10 STG Outlet Dia - 2.00" etc. complete.) (As per PWD common SR2023-24 Volume-V, Page No.120, I.No.13.15.4 )

1

35923

35923.65

... More
10.14.3 - Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc.complete.r 160mm(weight of pipe -3.923 kg) (As per PWD common SR2023-24 Volume-V, Page No.120, I.No.10.14.3 )

25

678

16957.5

... More
13.23.3 - Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOL- Direct Online Starter 2) S-D- Star Delta Starter etc. complete 6 to 15 HP pumps (As per PWD SR 2023-24 Volume-V, Page No.155, I.No.13.23.3)for outdoor:

1

16695

16695

... More
13.22.5 - Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. (As per PWD SR 2023-24 Volume-V, Page No.154, I.No.13.22.5) 1x3x10 m2

60

294

17640

... More
13.222.5 - Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. (As per PWD SR 2023-24 Volume-V, Page No.154, I.No.13.22.5) 1x3x4m2

25

141

3543.75

... More
13.32.1 - Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work. (As per PWD SR2023-24 Volume Page No.156, I.No.13.32.)

1

6825

6825

... More
13.34 - Labour charges for erection of outdoor type panel board and meter board units with all necessary materials and labour, tools and equipments including providing cement concrete foundation bed etc., complete as per specification, with testing of as per instructions of engineer incharge of work. (As per PWD SR2023-24 Volume Page No.156, I.No.13.34.)

1

1522

1522.5

... More
1.11 - Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. PWD CSR 2023-24, Vol-I, P. No. 7, I. No. 1.11

1.71

454

777.4515

... More
9.10 - Providing and fixing 1st quality ceramic glazed floor tiles conforming to IS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per m2 including pointing in white cement mixed with pigment of matching shade complete. PWD CSR 2023-24, Vol-II, P. No. 60, I. No. 9.10

5.51

1161

6398.763

... More
10.14 - Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete.PWD CSR 2023-24, Vol-II, P. No. 71, I. No. 10.14

8.25

1161

9580.725

... More
12.85 - Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) PWD CSR 2023-24, Vol-II, P. No. 109, I. No. 12.85

0.27

6004

1621.3365

... More
2.1.6 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. PWD CSR 2023-24, Vol-II, P. No. 15, I. No. 2.1.6

1.04

6555

6817.356

... More
1028 - Water proofing materials PWD CSR 2023-24, Vol-II, P. No.A-43 I. No.1028

25

46

1155

... More
13.8.2.2 - Providing and fixing unplasticised PVC connection pipe with brass unions :45 cm length, 20mm NB PWD CSR 2023-24, Vol-II, P. No. 118, I. No. 13.8.2.2

2

115

230.4

... More
13.9.1 - Providing and fixing C.P. brass shower rose with 15 or 20 mm inlet - 100 mm diameter PWD CSR 2023-24, Vol-II, P. No. 118, I. No. 13.9.1

1

269

269.85

... More
13.23.3 - Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. PWD CSR 2023-24, Vol-II, P. No. 122, I. No. 13.32.3 25 mm nominal dia pipes

5

500

2504.25

... More
13.33.4 - Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work PWD CSR 2023-24, Vol-II, P. No. 122, I. No. 13.33.4 32 mm nominal dia Pipes

10

390

3906

... More
13.34 - Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. PWD CSR 2023-24, Vol-II, P. No. 123, I. No. 13.34

1000

9

9450

... More
13.48 - Providing and fixing on wall face unplasticised rigid PVC rain water pipes conforming to IS 13592 type A, including jointing with seal ring conforming to IS 5382, leaving 10mm gap for thermal expansion, (i) single socketed pipes 100 mm diameter PWD CSR 2023-24, Vol-II, P. No. 125, I. No. 13.48

10

305

3055.5

... More
13.59 - Providing and fixing PVC (S.W.R) Nahani Trap 10cms x 10cms with all fitting arrangements & all necessary accessories complete PWD CSR 2023-24, Vol-II, P. No. 127, I. No. 13.59

2

231

462

... More
20.44.2 - Providing & fixing White vitreous china water closet squatting pan (Indian type) along with "S" or "P" trap including dismantling of old WC seat and "S" or "P" trap at site complete with all operations including all necessary materials, labour and disposal of dismantled material i/c malba, all complete as per the direction of Engineer-in charge Orissa pattern W.C Pan of size 580x440 mm (PWD CSR 2023-24, Vol-II, P. No. 202, I. No. 20.44.2

2

3724

7448.7

... More
14.55a - Providing and fixing Bib cock with wall flange made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete Economy Class PWD CSR 2023-24, Vol-II, P. No. 139, I. No. 14.55a

2

1172

2345.7

... More
14.7.1 - Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Wash basin size 630x450 mm with a pair of 15 mm C.P. brass pillar taps PWD CSR 2023-24, Vol-II, P. No. 132, I. No. 14.7.1

1

3236

3236.1

... More
14.32.2 - Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing : Rectangular shape 453x357 mm (PWD CSR 2023-24, Vol-II, P. No. 136, I. No. 14.32.2)

1

1068

1068.9

... More
10.14.14 - Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof includingjointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from theexcavationetc. complete. 6 Kg/m2: 200mm(weight of pipe -6.233 kg) (p.no.120. it.no 10.14.14) 2023-24 WATER SUPPLY AND UGD WORKS COMMON SCHEDULE OF RATES VOLUME-V

15

1015

15230.25

... More
1.5 - PVC/metal conduit Deep Junction Box Supplying and fixing PVC/metal conduit Deep junction box 19/20mm Deep Junction Box (P.no.2.it.no.1.5) (PWD CSR for Electrical Works for the Year 2023-24)

4

51

205.8

... More
1.6.4 - Flush Mounting Wooden Box Supplying and flush mounting teak wooden box without front plank, made of not less than 12 mm thick wood, after due groove cutting, finishing with necessary cement plastering complete. 8" x 6" x 3" (203 x 152 x 76 mm) (P.no.3.it.no.1.6.4) (PWD CSR for Electrical Works for the Year 2023-24)

1

90

90.3

... More
1.6.6 - Flush Mounting Wooden Box Supplying and flush mounting teak wooden box without front plank, made of not less than 12 mm thick wood, after due groove cutting, finishing with necessary cement plastering complete. 4" x 4" x 3" ( 101 x 101 x 76 mm) (P.no.3.it.no.1.6.6) (PWD CSR for Electrical Works for the Year 2023-24)

1

77

77.7

... More
2.3.2 - Wiring for Lightings/Power Circuit Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.1.5 Sqmm (P.no.5.it.no.2.3.2) (PWD CSR for Electrical Works for the Year 2023-24)

30

27

819

... More
2.3.3 - Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.2.5 Sqmm (P.no.5.it.no.2.3.3) (PWD CSR for Electrical Works for the Year 2023-24)

30

44

1323

... More
2.3.4 - Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.4 Sqmm (P.no.5.it.no.2.3.4) (PWD CSR for Electrical Works for the Year 2023-24

30

66

1984.5

... More
3.6.1 - Modular Switches/Sockets/Regulators etc Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293 6Amps one way (P.no.9.it.no.3.6.1) (PWD CSR for Electrical Works for the Year 2023-24)

4

107

428.4

... More
3.6.2 - Modular Switches/Sockets/Regulators etc Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293 6Amps two way. (P.no.9.it.no.3.6.2) (PWD CSR for Electrical Works for the Year 2023-24)

1

174

174.3

... More
3.6.7 - Modular Switches/Sockets/Regulators etc Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293 6Amps two way. (P.no.9.it.no.3.6.7) (PWD CSR for Electrical Works for the Year 2023-24)

1

189

189

... More
3.6.9 - Modular Switches/Sockets/Regulators etc Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293 32Amps DP switch. (P.no.9.it.no.3.6.9) (PWD CSR for Electrical Works for the Year 2023-24)

1

342

342.3

... More
3.8 - 4mm Thick Plastic Sheets Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc, and fixing on existing wooden or metal box using N.F. screws. (P.no.9.it.no.3.8) (PWD CSR for Electrical Works for the Year 2023-24)

2000

-

860

... More
5.7.2 - Porcelain Fuse Channel Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 32Amps (P.no.10.it.no.5.7.2) (PWD CSR for Electrical Works for the Year 2023-24)

1

253

253.05

... More
5.18 - Miniature Circuit Breakers Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898 6-32 Amps SP (p.no.17.it.no.5.18) (PWD CSR for Electrical Works for the Year 2023-24)

1

435

435.75

... More
5.18.4 - Miniature Circuit Breakers Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898 6-32 Amps DP .(p.no.17.it.no.5.18.4) (PWD CSR for Electrical Works for the Year 2023-24)

1

775

775.95

... More
5.19.3 - MCB Distribution Boards Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure.I - Single Door 8 Way SP & N (p.no.18.it.no.5.19.3)(PWD CSR for Electrical Works for the Year 2023-24)

1

1566

1566.6

... More
11.3.2 - PVC Batten with LED Tubes Supplying of .feet - PVC Batten with integrated LED tube .W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition.LED light fighting 1 x4'20/22 w (p.no.43.it.no.11.3.2) (PWD CSR for Electrical Works for the Year 2023-24)

2

724

1449

... More
13.7.1 - Fixing all type of Luminaries Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. On wall / ceiling / Rafter / Girders (p.no.56.it.no.13.7.1) (PWD CSR for Electrical Works for the Year 2023-24)

2

128

256.2

... More
13.19 - Fixing of LED Lights Fixing all types and all capacities of 1'x4' / 2'x2' LED Light fittings indoor on the wall / ceiling / rafters / girders with necessary supporting frame, using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps.(p.no.58.it.no.13.19) (PWD CSR for Electrical Works for the Year 2023-24)

2

514

1029

... More
6.1 - Supplyingexhaustfanof1440RPMof300mm(12")sizewithbracketbladescompleteforlightdutysuitabletooperateon230V50Hz, AC Supply. (PWD CSR for Electrical Works for the Year 2023-24 P.no.30.it.no.6.1)

2

1566

3133.2

... More
5.35 - Supplying, fixing and iring Electronic Trivector Meter (ETV) 5to32/63 A three phase 4wire whole current lass-1Accuracy Energy Meter. (PWD CSR for Electrical Works for the Year 2023-24 P.no.30.it.no.5.35)

1

5990

5990.25



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.