Directorate Of Municipal Administration Tender
... More
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.
Directorate Of Municipal Administration - DMA Tender
Civil And Construction
Excavation
Opening Date12 Feb 2025
Closing Soon27 Feb 2025
Tender Amount₹ 49,92,155.2
Costs
EMD
₹ 1,00,000Document Cost
Refer DocumentsTender Fee
₹ 1,250
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
DMA/2024-25/OW/WORK_INDENT36093Tender No
DMA/2024-25/OW/WORK_INDENT36093Tender Authority
Directorate Of Municipal Administration ViewPurchaser Address
-Website
http://bidplus.gem.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
13.25.1 - Supply and delivery at site wrought middle steel (galvanized) GI elbow confirming to IS 1239-II, 1991 with latest amendments if any for: For 50 mm dia GI elbow each (P.No.154/I.No13.25.1 of C S R(VOL-5) 2023-24)
10
267
2670
... More
13.24.1 - Supply and delivery at site of brand new best make gate valve as per IS 778/1984 with ISI Mark and as per its latest amendments Size 50 mm (P.No.154/I.No13.24.1, of C S R(VOL-5) 2023-24)
10
1250
12500
... More
13.25.1 - Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments Size 50 mm (P.No.154/I.No13.25.1, of C S R(VOL-5) 2023-24)
10
1250
12500
... More
13.27 - Supply and delivery of galvanized mild steel tubes of 6mtr standard length heavy duty (C Class) as per IS 1239 (Part-I) 1990 with latest amendments with ISI Mark (one end fitted with Heavy Duty collar and other end fitted with protective cover) Size 50 mm (P.No.155/I.No13.27, of C S R(VOL-5) 2023-24)
120
3050
366000
... More
13.32 - Providing Ball bearing as per ISI specifiction with guarantee period of not less than 12 months Bearing cost for 7.5 HP (P.No.156/I.No13.32, of C S R(VOL-5) 2023-24)
10
1880
18800
... More
13.2 - Rewinding of submersible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and testing. for all types of submersible pumpsets etc.(with guarantee period not less than 6 months) for For all types of submersible pumpsets upto 5.00HP upto 5.5HP (CSR Vol.5 P.N 147 It No.13.2 (2023.24)
50
3116
155800
... More
13.2 - Rewinding of submersible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and testing. for all types of submersible pumpsets etc.(with guarantee period not less than 6 months) for For all types of submersible pumpsets 6.0 HP upto 6.5HP (CSR Vol.5 P.N 147 It No.13.2(2023-24)
20
3479
69580
... More
13.2 - Rewinding of submersible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and testing. for all types of submersible pumpsets etc.(with guarantee period not less than 6 months) for For all types of submersible pumpsets 7.0 HP upto 8.0HP (CSR Vol.5 P.N 147 It No.13.2 (2023.24)
50
4019
200950
... More
13.2 - Rewinding of submersible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and testing. for all types of submersible pumpsets etc.(with guarantee period not less than 6 months) for For all types of submersible pumpsets 10 HP upto 11HP (CSR Vol.5 P.N 147 It No.13.2 (2023.24)
30
3839
115170
... More
13.2 - Replace the components of submersible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc.(with gurantee of period not less than 1 year) for:(CSR Vol.5 P.N 147 It No.13.2 (2023.24)The Impeller (Shell moulded with aluminium and bronze.)
180
1500
270000
... More
13.2 - Replace the components of submersible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc.(with gurantee of period not less than 1 year) for:(CSR Vol.5 P.N 147 It No.13.2 (2023.24)The discharge outlet (DO) bearing DO steel brush DO bearing.
180
2050
369000
... More
13.2 - Replace the components of submersible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc.(with gurantee of period not less than 1 year) for:(CSR Vol.5 P.N 147 It No.13.2 (2023.24)The steel bearing bush (DO steel bush)
180
400
72000
... More
13.2 - Rewinding of submersible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and testing. for all types of submersible pumpsets etc.(with guarantee period not less than 6 months) for For all types of submersible pumpsets 10 HP upto 11HP (CSR Vol.5 P.N 147 It No.13.2 (2023.24)The allen screw
180
1200
216000
... More
13.2 - Replace the components of submersible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc.(with gurantee of period not less than 1 year) for:(CSR Vol.5 P.N 147 It No.13.2 (2023.24)The pump shaft made out of stainless steel counterless ground with key
way (upto 8 stages). Extra for Each stage @ Rs.40/-
180
1500
270000
... More
13.2 - Replace the components of submersible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc.(with gurantee of period not less than 1 year) for:(CSR Vol.5 P.N 147 It No.13.2 (2023.24)The pump key (stainless steel)
180
650
117000
... More
13.2 - Replace the components of submersible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc.(with gurantee of period not less than 1 year) for:(CSR Vol.5 P.N 147 It No.13.2 (2023.24)The pump coupling (stainless steel)
180
1500
270000
... More
13.2 - Replace the components of submersible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc.(with gurantee of period not less than 1 year) for:(CSR Vol.5 P.N 147 It No.13.2 (2023.24)The Non Return Valve (NRV) assembly complete with rubber 'O' ring.
180
650
117000
... More
13.2 - Replace the components of submersible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc.(with gurantee of period not less than 1 year) for:(CSR Vol.5 P.N 147 It No.13.2 (2023.24)The cable guard
180
350
63000
... More
13.2 - Replace the components of submersible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc.(with gurantee of period not less than 1 year) for:(CSR Vol.5 P.N 147 It No.13.2 (2023.24)The strainer
180
450
81000
... More
13.2 - Replace the components of submersible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc.(with gurantee of period not less than 1 year) for:(CSR Vol.5 P.N 147 It No.13.2 (2023.24)The brass filter
180
1050
189000
... More
13.2 - Replace the components of submersible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc.(with gurantee of period not less than 1 year) for:(CSR Vol.5 P.N 147 It No.13.2 (2023.24)The Labour Charges for overhauling of the pump set.
180
900
162000
... More
13.3.1 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets,The STATOR of motor upto 3 H.P (CSR Vol.5 P.N 148 It No.13.3.1
5
1500
7500
... More
13.3.2 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets The STATOR of motor 3 to 4 H.P ,(CSR Vol.5 P.N 148 It No.13.3.2
5
2500
12500
... More
13.3.3 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets The STATOR of motor 4 to 5 H.P ,(CSR Vol.5 P.N 148 It No.13.3.3
5
3500
17500
... More
13.3.2 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets The ROTOR of motor upto 3.0 H.P ,(CSR Vol.5 P.N 148 It No.13.3.3
5
1200
6000
... More
13.3.4 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets The ROTOR of motor 3to 4 H.P ,(CSR Vol.5 P.N 148 It No.13.3.4
5
1500
7500
... More
13.3.5 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets The ROTOR motor 4 to 5 H.P ,(CSR Vol.5 P.N 148 It No.13.3.5
5
2000
10000
... More
13.3.6 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets ,(CSR Vol.5 P.N 148 It No.13.3.6The upper flange
15
650
9750
... More
13.3.6 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets ,(CSR Vol.5 P.N 148 It No.13.3.6The lower flange
15
650
9750
... More
13.3.6 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets ,(CSR Vol.5 P.N 148 It No.13.3.6upper/ lower housing
15
1200
18000
... More
13.3.6 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets ,(CSR Vol.5 P.N 148 It No.13.3.6The Lock Ring
15
350
5250
... More
13.3.6 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets ,(CSR Vol.5 P.N 148 It No.13.3.6The Carbon Housing
15
2000
30000
... More
13.3.6 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets ,(CSR Vol.5 P.N 148 It No.13.3.6The Carbon Housing (Thrust bearing block assembly complete with
segment bearing pad.
15
2200
33000
... More
13.3.6 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets ,(CSR Vol.5 P.N 148 It No.13.3.6The Carbon Housing (Top carbond / ferrodo padding)
15
350
5250
... More
13.3.6 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets ,(CSR Vol.5 P.N 148 It No.13.3.6The Stud and Nuts
15
200
3000
... More
13.3.6 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets ,(CSR Vol.5 P.N 148 It No.13.3.6The Gun Metal bearing, centrifugally cast Aluminium Bronze bearing
bush
15
850
12750
... More
13.3.6 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets ,(CSR Vol.5 P.N 148 It No.13.3.6The Circlips
15
200
3000
... More
13.3.6 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets ,(CSR Vol.5 P.N 148 It No.13.3.6The Motor base with pin
15
500
7500
... More
13.3.6 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets ,(CSR Vol.5 P.N 148 It No.13.3.6The Transportation of pumping machineries
15
1200
18000
... More
13.3.6 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets ,(CSR Vol.5 P.N 148 It No.13.3.6The Re-errection charges of pumping machineries including overhauling
and painting
15
2000
30000
... More
13.3.6 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets ,(CSR Vol.5 P.N 148 It No.13.3.6The lifting of submersible pumpset from well.
15
1500
22500
... More
13.3.6 - Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and testing etc and wtih guarantee/ warranty for one yearReplace the components of motor parts of submersible pump sets ,(CSR Vol.5 P.N 148 It No.13.3.6The Labour charges only for overhauling
15
3000
45000
... More
13.32 - Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work (P.No.156/I.No13.32, of C S R(VOL-5) 2023-24)
1
6500
6500
... More
13.34 - Labour charges for erection of outdoor type panel board and meter board units with all necessary materials and labour, tools and equipments including providing cement concrete foundation bed etc., complete as per specification, with testing of as per instructions of engineer incharge of work.((P.No.156/I.No13.34, of C S R(VOL-5) 2023-24)
1
1450
1450
... More
13.39 - Earthing: Supplying and fixing and wiring earth electrode for grounding circuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of salt and charcoal 150mm around the pipe to complete depth. The connection from the pipe to the conduits etc. is to established through GI wire of sizes as per clause 7.3.3 of IS 732 using 12mm bolts, nuts, washers and check nuts, the pipe shall have 16 through holes of 12mm dia. (P.No.157/I.No13.39, of C S R(VOL-5) 2023-24)
10
3750
37500
... More
13.24 - Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE:
1) DOL- Direct Online Starter
2) S-D- Star Delta Starter etc. complete. (P.No.154/I.No13.24., of C S R(VOL-5) 2023-24
10
17500
175000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%