Directorate Of Municipal Administration Tender
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.
Directorate Of Municipal Administration - DMA Tender
Electrical and Electronics
Opening Date16 Jan 2025
Closing Date24 Jan 2025
Tender Amount₹ 15,80,835.84
Costs
EMD
₹ 53,000Document Cost
Refer DocumentsTender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
DMA/2024-25/WS/WORK_INDENT12350Tender No
DMA/2024-25/WS/WORK_INDENT12350Tender Authority
Directorate Of Municipal Administration ViewPurchaser Address
-Website
http://bidplus.gem.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
0004 - Labour charges for DP Transformer Structure using PSCC Pole-9 Mtr Long, 300 Kg WL
2
7221
14442
... More
0005 - 11 KV Horizontal Cross arm Top Support Clamp
7
850
5950
... More
0006 - Labour charges for 11 KV Horizontal Cross arm Top Support Clamp
7
272
1904
... More
0007 - 11 KV Pin Insulator
12
266
3192
... More
0008 - Labour charges for 11 KV Pin Insulator
12
160
1920
... More
0009 - No 1 Rabbit ACSR Including 1.5% Sag
0.9135
58537
53473.5495
... More
0010 - Labour charges for No.-1 Rabbit ACSR Including 1.5% Sag
0.9135
3299
3013.6365
... More
0011 - 45KN Disc Insulator
9
510
4590
... More
0012 - Guy set materials: b) Guy set with 2no.s 15 strain insulator & Concreting materials
4
1229
4916
... More
0013 - Labour charges for Guy set materials: b) Guy set with 2no.s 15 strain insulator & Concreting materials
4
636
2544
... More
0014 - Spiral Earth Electrode
6
239
1434
... More
0015 - Labour charges for Spiral Earth Electrode
6
93
558
... More
0016 - 240 Sqmm, 3.5 Core, ( 30 GI Strips - 4.0 x 0.8mm) LT under ground cable
0.08
1656048
132483.84
... More
0017 - Labour charges for 240 Sqmm, 3.5 Core, ( 30 GI Strips - 4.0 x 0.8mm) LT under ground cable
0.08
24148
1931.84
... More
0018 - Labour charges for Earthwork excavation for cable trench of 0.5 to 0.75 mtr. Width and Depth upto 1 mtr. Including trial pits, depositing on bank upto a lead of 50 mtrs, Supplying and Displaying necessary Danger Boards and Lightning, using sight rails and sign boards at every 100mtrs wherever necessary as directed. In Ordinary Soil
18
262
4716
... More
0019 - Labour charges for Refilling the cable trenches with selected available earth from trench excavation including watering, consolidation in layers of 15cm. Thickness including depositing of the surplus earth with a lead of 200 mtrs.
18
160
2880
... More
0020 - Route & Joint Indicating slab with MS Anchor rod & Fixing of route joint indicating slabs
5
133
665
... More
0021 - Labour charges for Route & Joint Indicating slab with MS Anchor rod & Fixing of route joint indicating slab
5
86
430
... More
0022 - Heat shinkable outdoor termination kit for XLPE
12
4067
48804
... More
0023 - Labour charges for Heat shinkable outdoor termination kit for XLPE
12
1965
23580
... More
0024 - PVC Pipe 2.5 inch for inserting HT UG Cable
20
104
2080
... More
0025 - Labour charges for PVC Pipe 2.5 inch for inserting HT UG Cable
20
12
240
... More
0026 - Providing guarding between HT & LT line.
40
93
3720
... More
0027 - Labour charges for Providing guarding between HT & LT line.
40
1340
53600
... More
0030 - 11KV Class Load break switch 400Amps
1
73239
73239
... More
0031 - Labour charges for 11KV Class Load break switch 400Amps
1
3260
3260
... More
0032 - Construction of platform (1.5x1.5x1.2) mtr in size stone, for erection of transformers/Heavy equipment including all materials, labour. Construction of platform with size stone, cement concert for erection of 250kVA Transformer/ Metering cubicle/Heavy Equipment. Construction of platform(1.5x1.5x1.2) mtr in size, for erection of transformers/ Heavy equipment including all materials, labour. Excavation of (.5x1.5x1) mt pit for foundation providing and laying cement concrete 1:4:8 for foundation laid in 10 cm thick layers, well compacted curing etc.,complete providing and construction of stone masonry 0.9m below ground level and 1.2m above ground level neatly hammer dressed in cement mortar 1:6. Providing and Laying cement concrete slab 1.5x1.5x0.10 Mtr with cement concrete of 1:2:4 mix forming & cutting complete, providing pointing to stone masonry in cement mortar 1:3 after racking joint & nisely lining etc./ plastering the concrete surfaces in cement mortar 1:4 including smooth randering curing etc
1
30361
30361
... More
0033 - 11 KV/433V, 250 kVA, 3 Phase, 50 Cys Distribution Transformer BEE 5 Star rated with oil
1
539071
539071
... More
0034 - Labour charges for 11 KV/433V, 250 kVA, 3 Phase, 50 Cys Distribution Transformer BEE 5 Star rated with oil
1
2278
2278
... More
0035 - Earthing materials pipe type for grounding as per Drawing No. BESCOM/ GM/ CP/15 & 34
3
1729
5187
... More
0036 - Labour Charges for Earthing materials pipe type for grounding as per Drawing No. BESCOM/ GM/ CP/15 & 34
3
949
2847
... More
0037 - Caution/Danger Board cds27
1
150
150
... More
0038 - Labour Charges For Caution/Danger Board cds27
1
80
80
... More
0039 - LT Distribution box for 250KV A with MCCB
1
2023
2023
... More
0040 - Labour charges for LT Distribution box for 250KV A with MCCB
1
385
385
... More
0041 - b) LT Wiring (From DTC to Lt line via Metering Box & LT protection Kit) Single circuit i) AI Lead Wire240 Sqmm
45
260
11716.65
... More
0042 - b) LT Wiring (From DTC to Lt line via Metering Box & LT protection Kit) Single circuit ii) Copper lugs-240 Sqmm
12
355
4260
... More
0043 - b) LT Wiring (From DTC to Lt line via Metering Box & LT protection Kit) Single circuit iii) PG Clamps-Rabbit to 240 Sqmm
4
410
1640
... More
0044 - b) LT Wiring (From DTC to Lt line via Metering Box & LT protection Kit) Single circuit iv) Spacers for DTC Wiring
8
42
336
... More
0045 - b) LT Wiring (From DTC to Lt line via Metering Box & LT protection Kit) Single circuit v) Fish Plate with necessary clamps,bolts & nuts etc complete
2
264
528
... More
0046 - Labour Charges for b) LT Wiring (From DTC to Lt line via Metering Box & LT protection Kit) Single circuit
1
2468
2468
... More
0047 - LT Metering box with CTs and necessary wiring for housing ETV Meter
1
5393
5393
... More
0048 - Labour charges for LT Metering box with CTs and necessary wiring for housing ETV Meter
1
865
865
... More
0049 - Earthing materials pipe type for grounding as per Drawing No. BESCOM/ GM/ CP/15 & 34/ Dt:24.10.07 for HT cable
3
1733
5199
... More
0050 - Labour charges for Earthing materials pipe type for grounding as per Drawing No. BESCOM/ GM/ CP/15 & 34/ Dt:24.10.07 for HT cable
3
725
2175
... More
0051 - LT Three phase Four wire 5-30 A Thread through type composite Meter Housing Box consisting of ETV Meter with AMR comply and LTCT with built in GSM/GPRS modem upto 250kVA Distribution Transformer
1
17975
17975
... More
0052 - Labour Charges for LT Three phase Four wire 5-30 A Thread through type composite Meter Housing Box consisting of ETV Meter with AMR comply and LTCT with built in GSM/GPRS modem upto 250kVA Distribution Transformer
1
550
550
... More
0053 - 9mtr Long RCC Pole, 150 WL
10
8316
83160
... More
0054 - labour charges for 9mtr Long RCC Pole, 150 WL
10
1742
17420
... More
0055 - No-1 Rabbit ACSR Including 1.5% Sag
2.9
58537
169757.3
... More
0056 - Labour charges for No-1 Rabbit ACSR Including 1.5% Sag
2.9
3299
9567.1
... More
0057 - 240 Sqmm, 3.5 Core. ( 30 GI Strips - 4.0 x 0.8 mm) LT under ground cable
0.02
1656048
33120.96
... More
0058 - Labour charges for 240 Sqmm, 3.5 Core. ( 30 GI Strips - 4.0 x 0.8 mm) LT under ground cable
0.02
24148
482.96
... More
0059 - A Pin Cross Arm
80
423
33840
... More
0060 - Labour Charges for A Pin Cross Arm
80
160
12800
... More
0061 - No.8 Strain Insulator
25
27
675
... More
0061 - Earth work excavation for cable trench of 0.5 to 0.75 mtr. Width and Depth upto 1 mtr including trial pits, depositing on bank upto a lead of 50 mtrs, Supplying and Displaying necessary danger boards and lightning, using sight rails and sign boards at every 100 mts wherever necessary as directed. In Ordinary Soil
18
262
4716
... More
0062 - Refilling the cable trenches with selected available earth from trench excavation including watering, consolidation in layers of 15cm. Thickness including depositing of the surplus earth with a lead of 200mtrs
18
160
2880
... More
0063 - Route & Joint indicating slab with MS Anchor rod& Fixing of route Joint indicating slabs
8
133
1064
... More
0064 - Labour Charges for Route & Joint indicating slab with MS Anchor rod& Fixing of route Joint indicating slabs
8
86
688
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements