Department Of Revenue Tender

... More
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Department Of Revenue Tender

Works
Energy, Oil and Gas
Electrical Goods and Equipments
Electrical and Electronics
Opening Date7 Apr 2025
Closing Date21 Apr 2025
Tender Amount₹ 7,50,840.27 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
004 - PSC Pole-9.0M Long 200 Kg WL (Hard Rock). As per the direction of Engineer-in-charge of work B)labour Cost

12

3104

37248

... More
005 - PSC pole-8.0 M Long for stud. As per the direction of Engineer-in-charge of work A) Material Cost

3

3578

10734

... More
006 - PSC pole-8.0 M Long for stud. As per the direction of Engineer-in-charge of work B)LabourCost

3

1072

3216

... More
007 - Stud clamp. As per the direction of Engineer-in-charge of work B) Material Cost

3

435

1305

... More
008 - Stud clamp. As per the direction of Engineer-in-charge of work B) Labour Cost

3

122

366

... More
009 - Horizontal cross arms with clamps, HT ST supports, bolts, nuts and washers (for RCC poles). As per the direction of Engineer-in-charge of work B) Material Cost

4

668

2672

... More
010 - Horizontal cross arms with clamps, HT ST supports, bolts, nuts and washers (for RCC poles). As per the direction of Engineer-in-charge of work B) labour Cost

4

122

488

... More
011 - Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for PSC poles). As per the direction of Engineer-in-charge of work A) Material Cost

12

664

7968

... More
012 - Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for PSC poles). As per the direction of Engineer-in-charge of work B)Labour Cost

12

122

1464

... More
013 - 11 KV Ploymeric Pin insulators. As per the direction of Engineer-in-charge of work A) Material Cost

39

221

8619

... More
014 - 45 KN Ploymeric Disc insulators. As per the direction of Engineer-in-charge of work A) Material Cost

12

202

2424

... More
015 - Guy sets. As per the direction of Engineer-in-charge of work A) Material Cost

4

1209

4836

... More
016 - Guy sets. As per the direction of Engineer-in-charge of work B)Labour Cost

4

448

1792

... More
017 - Rabbit ACSR Conductor with 1.5% Sag. As per the direction of Engineer-in-charge of work A) Material Cost

1.705

61515

104883.075

... More
018 - Rabbit ACSR Conductor with 1.5% Sag. As per the direction of Engineer-in-charge of work B)Labour Cost

1.705

3299

5624.795

... More
019 - PG clamps for Rabbit conductor. As per the direction of Engineer-in-charge of work A) Material Cost

12

116

1392

... More
020 - Spiral earth electrode. As per the direction of Engineer-in-charge of work A) Material Cost

14

248

3472

... More
021 - Spiral earth electrode. As per the direction of Engineer-in-charge of work B)Labour Cost

14

70

980

... More
022 - EG Stirrps with G.I. wire lacing. As per the direction of Engineer-in-charge of work A) Material Cost

14

287

4018

... More
023 - EG Stirrps with G.I. wire lacing. As per the direction of Engineer-in-charge of work B)Labour Cost

14

125

1750

... More
024 - concreting materials for guy sets without cement. As per the direction of Engineer-in-charge of work B)Labour Cost

4

200

800

... More
025 - Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24-10-07. As per the direction of Engineer-in-charge of work A) Material Cost

13

146

1898

... More
026 - Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24-10-07. As per the direction of Engineer-in-charge of work B)Labour Cost

13

61

793

... More
027 - Anti-Climbing Device (12mtrs/1 Kg G.I. Barbed wire) Lumpsum. As per the direction of Engineer-in-charge of work A) Material Cost

13

93

1209

... More
028 - Anti-Climbing Device (12mtrs/1 Kg G.I. Barbed wire) Lumpsum. As per the direction of Engineer-in-charge of work B)Labour Cost

13

32

416

... More
029 - 9 Mtr RCC DP Transformer Structure (Using 9 Mtr RCC Poles). As per the direction of Engineer-in-charge of work A) Material Cost.

1

32553

32553

... More
030 - 9 Mtr RCC DP Transformer Structure (Using 9 Mtr RCC Poles). As per the direction of Engineer-in-charge of work B)Labour Cost

1

5205

5205

... More
031 - 11 KV Ploymeric Pin insulators. As per the direction of Engineer-in-charge of work A) Material Cost.

3

221

663

... More
032 - 45 KN Disc insulators. As per the direction of Engineer-in-charge of work A) Material Cost.

3

202

606

... More
033 - Guy sets . As per the direction of Engineer-in-charge of work A) Material Cost.

4

1209

4836

... More
034 - Guy sets . As per the direction of Engineer-in-charge of work B)Labour Cost

4

448

1792

... More
035 - 12 KV /433V, 100KVA, 3 phase 50 Cys Distribution Transformer BEE-5 Star Rated with oil off Load Tap. As per the direction of Engineer-in-charge of work A) Material Cost.

1

214306

214306

... More
036 - 12 KV /433V, 100KVA, 3 phase 50 Cys Distribution Transformer BEE-5 Star Rated with oil off Load Tap. As per the direction of Engineer-in-charge of work B)Labour Cost

1

1151

1151

... More
037 - Earthing materials pipe type for grounding as per Drawing, No. BESCOM/GM/CP/15 & 34/Dt: . As per the direction of Engineer-in-charge of work A) Material Cost.

3

1733

5199

... More
038 - Earthing materials pipe type for grounding as per Drawing, No. BESCOM/GM/CP/15 & 34/Dt:. As per the direction of Engineer-in-charge of work B)Labour Cost

3

725

2175

... More
039 - concreting materials for guy set (without cement). As per the direction of Engineer-in-charge of work B)Labour Cost

4

200

800

... More
040 - GI Wire 8 SWG. As per the direction of Engineer-in-charge of work A) Material Cost.

5

78

390

... More
041 - Guy wire 7/10 SWG. As per the direction of Engineer-in-charge of work A) Material Cost.

10

80

800

... More
042 - 11 KV lightning Arrester, Metal oxide, 9 KV, 5 KA. As per the direction of Engineer-in-charge of work A) Material Cost.

1

1736

1736

... More
043 - 11 KV lightning Arrester, Metal oxide, 9 KV, 5 KA. As per the direction of Engineer-in-charge of work B)Labour Cost

1

90

90

... More
044 - Swith gear a) LT Protectin kit for 100 kVA. As per the direction of Engineer-in-charge of work. A) Material Cost.

2

1915

3830

... More
045 - Swith gear a) LT Protectin kit for 100 kVA. As per the direction of Engineer-in-charge of work B)Labour Cost

2

260

520

... More
046 - Swith gear i) A1 lead wire-120 Sq mm. As per the direction of Engineer-in-charge of work. A) Material Cost.

45

180

8100

... More
047 - Swith gearii) Copper lugs-120 Sq mm. As per the direction of Engineer-in-charge of work. A) Material Cost.

12

145

1740

... More
048 - Swith gear iii) PG clamps-Rabbit to 120 Sq mm. As per the direction of Engineer-in-charge of work. A) Material Cost.

4

309

1236

... More
049 - Swith gear iv) Spacers for DTC wiring. As per the direction of Engineer-in-charge of work. A) Material Cost.

8

41

328

... More
050 - Swith gear v) Fish plate with necessary clams. As per the direction of Engineer-in-charge of work. A) Material Cost.

2

229

458

... More
051 - Swith gear B)Labour Cost

1

719

719

... More
052 - 11 KV solid core type HG fuse unit. As per the direction of Engineer-in-charge of work. A) Material Cost.

1

1032

1032

... More
053 - 11 KV solid core type HG fuse unit. As per the direction of Engineer-in-charge of work B)Labour Cost

1

178

178

... More
054 - 11 KV GOS 200 A single break. As per the direction of Engineer-in-charge of work. A) Material Cost.

1

9125

9125

... More
055 - 11 KV GOS 200 A single break. As per the direction of Engineer-in-charge of work B)Labour Cost

1

805

805

... More
056 - Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24-10-07. As per the direction of Engineer-in-charge of work. A) Material Cost.

1

146

146

... More
057 - Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24-10-07. As per the direction of Engineer-in-charge of work B)Labour Cost

1

61

61

... More
058 - Anti-Climbing Device (12mtrs/1 Kg G.I. Barbed wire) Lumpsum. As per the direction of Engineer-in-charge of work. A) Material Cost.

2

93

186

... More
059 - Anti-Climbing Device (12mtrs/1 Kg G.I. Barbed wire) Lumpsum. As per the direction of Engineer-in-charge of work B)Labour Cost

2

32

64

... More
060 - Three phase Four Wire 5-30A Thread trough type composite meter Housing Box with complete Set. As per the direction of Engineer-in-charge of work. A) Material Cost.

1

19135

19135

... More
061 - Three phase Four Wire 5-30A Thread trough type composite meter Housing Box with complete Set. As per the direction of Engineer-in-charge of work B)Labour Cost

1

1145

1145

... More
062 - TC Pencing . As per the direction of Engineer-in-charge of work B)Labour Cost

1

39999

39999

... More
063 - 95 Sqmm, 4 Core Cable. As per the direction of Engineer-in-charge of work. A) Material Cost.

0.2

514040

102808

... More
064 - 95 Sqmm, 4 Core Cable . As per the direction of Engineer-in-charge of work B)Labour Cost

0.2

23647

4729.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.