Department Of Archaeology Museum And Heritage Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Department Of Archaeology Museum And Heritage Tender

Civil And Construction
Civil Works Others
Opening Date28 May 2024
Closing Date10 Jun 2024
Tender Amount₹ 1,11,98,346.49 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
code04 - Numbering and removing Ceiling stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

290.2

902

261963.54

... More
code05 - Numbering and removing Beams stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

109.43

867

94908.639

... More
code06 - Numbering and removing Pillar Stone the stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

36

867

31222.8

... More
code07 - Numbering and removing Pillar Capitals Stone the stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

20

613

12272

... More
code08 - Numbering and removing Door Base stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

3

678

2035.5

... More
code09 - Numbering and removing Door jams stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

21.6

926

20008.08

... More
code10 - Numbering and removing Door Lintels stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

4.65

867

4032.945

... More
code11 - Numbering and removing Veener stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

158.4

778

123361.92

... More
code12 - Numbering and removing Adhisthana stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

321.6

678

218205.6

... More
code13 - Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work.

162.81

309

50334.3396

... More
code14 - Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates shall be paid separately)

17.07

6683

114087.6864

... More
code15 - KSRB 2.8 : Providing and Filling in foundation with granite / trap broken metal 100mm. and down size, with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift. complete as per specifications.

65.12

2596

169051.52

... More
code16 - Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand

100.94

6620

668321.7212

... More
code17 - Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand

38.88

7809

303623.2512

... More
code18 - Supplying of Solid granite stone all sizes of from Chikkaballapura quarry to work spot with all lead and lift and labour charges including hiring charges for chain and pulley block transportation etc., complete as directed by Engineer-in-charge of work (Data rate).

116.49

20532

2391772.68

... More
code19 - KSRRB M100-4.1 Cost of Haulage Excluding Loading and Unloading MORTH - 100 / Chapter 1 Case-I : Surface Road

116.4886

1587

184947.785334

... More
code20 - Providing Dressing to Adhistana stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

178.5

4643

828829.05

... More
code21 - Providing Dressing to Veener stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

36

4165

149954.4

... More
code22 - Providing Dressing to Chejja stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

72.5

4200

304558

... More
code23 - Providing Dressing to Ceiling stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

28.08

4613

129555.504

... More
code24 - Providing Dressing to Pillar stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

23.04

5156

118808.064

... More
code25 - Providing Dressing to Pillar capitals stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

17.28

6171

106641.792

... More
code26 - Providing Dressing to Door base stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

6.4

4165

26658.56

... More
code27 - Providing Dressing to Door jams stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

11.52

5504

63414.144

... More
code28 - Providing Dressing to Door Lintels stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

6.4

4413

28244.48

... More
code29 - Providing Dressing to Beams stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

74.88

4413

330460.416

... More
code30 - Providing two line dressing to granite stone slab / granite stone masonry as per specification.

298.54

1764

526654.414

... More
code31 - Resetting of Adhisthana stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

433.8

1026

445339.08

... More
code32 - Resetting of Pillar stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

50.4

1156

58282.56

... More
code33 - Resetting of Pillar Capitals stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

40

1091

43660

... More
code34 - Resetting of Beams stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

109.45

1156

126567.98

... More
code35 - Resetting of Door Base stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

4

1026

4106.4

... More
code36 - Resetting of Door Jams stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

10.8

1121

12106.8

... More
code37 - Resetting of Door lintels stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

6

1026

6159.6

... More
code38 - Resetting of Ceiling stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

290.195

1138

330445.0465

... More
code39 - Resetting of Veener stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

188.4

1014

191188.32

... More
code40 - Resetting of Kapotha/chejja stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

83.16

1138

94694.292

... More
code41 - Resetting of Flooring stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

221.26

448

99212.984

... More
code42 - Providing approved M-sand to site for laying of flooring slabs etc., complete as per direction of engineer incharge of work

16.59

1741

28894.4712

... More
code43 - Providing lime concrete terracing on roofing, for weather proof course, average thickness 100mm, laid to slope with 25mm nominal size brick jelly and 50% lime surkhi mortar 1:2 (one lime putty two surkhi ) rammed and finished with gur and Belgiri treatment rounding off junctions with parapets including cost of materials, labour complete as per specifications.

116.585

1840

214609.668

... More
code44 - KSRB-10.2: Providing and laying in position Yelahanka tiles of size 250 x 250 mm of approved quality and make, over a bed of cement mortar 1:3 an average thickness 25mm over weather proof course and pointed with cement mortar 1:3 mix with red oxide including curing cost of materials, labour complete as per specifications.

101.375

666

67586.7125

... More
code45 - Providing and Constructing Gopur's of Temple as per ancient style of such a manner that sculptures, ornamental flower, stucco figures, small domes of different sizes pillars at alternate height and width has to be constructed with a most care. After completion of brick masonry work of Vimana Gopura structure. (Excluding brick masonry work) Structures like sculptures, ornamenal flower, stucoo figures, small domes of different sizes pillars are to be designed and these structures has to be finished by doing cornice work in lime mortar 1:3, necessary formwork, scaffolding has to be provided in such a manner by giving sufficient space for easy movement of pilgrims, for conveyence of construction materials from ground level up to the Vimana Gopura top, and also making provision for easy approch for inspection by the higher Authorities and officer in charge of work. The sacffolding should be removed after completion of Gopura work proper curing is to done for entire Vimana Gopura structure until painting work. (Minimum 30-45 days curing is required)After proper curing of masonry work and plastering work water proof lime painting using ISI make materials one coat primer and 2 coat of water proof lime painting is to be done as per the direction of Higher Authorities. Proper curing s to be done and proper care is to be taken before and during the Exhibition of Vimana Gopura work, the entire work should be completed with in stipulated period in all respect as per the direction of the competent Authorities from time to time. (Full work) Size of Vimana Gopura 3.2x3.2x5.6m

1

533714

533714

... More
code46 - Providing and Constructing Prabhavali with idol of Temple as per ancient style of such a manner that sculptures, ornamental flower, stucco figures, small domes of different sizes pillars at alternate height and width has to be constructed with a most care. After completion of brick masonry work of Vimana Gopura structure.Structures like sculptures, ornamenal flower, stucoo figures, small domes of different sizes pillars are to be designed and these structures has to be finished by doing cornice work in lime mortar 1:3, necessary formwork, scaffolding has to be provided in such a manner by giving sufficient space for easy movement of pilgrims, for conveyence of construction materials from ground level up to the top, and also making provision for easy approch for inspection by the higher Authorities. (Minimum 30-45 days curing is required). .of Size : 1.20 x0.60 x 1.00m)

9

71862

646758

... More
code47 - Providing and Constructing Corner Idols of Temple as per ancient style of such a manner that sculptures, ornamental flower, stucco figures, small domes of different sizes pillars at alternate height and width has to be constructed with a most care. After completion of brick masonry work of Vimana Gopura structure.Structures like sculptures, ornamenal flower, stucoo figures, small domes of different sizes pillars are to be designed and these structures has to be finished by doing cornice work in lime mortar 1:3, necessary formwork, scaffolding has to be provided in such a manner by giving sufficient space for easy movement of pilgrims, for conveyence of construction materials from ground level up to the top, and also making provision for easy approch for inspection by the higher Authorities. (Minimum 30-45 days curing is required). .of Size : 1.20 x0.60 x 1.00m)

12

17582

210984

... More
code48 - Providing Brick work with common burnt clay modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.

30.121

9403

283240.41382

... More
code49 - Providing fresh lime plaster to brick masonry of 10mm lime mortar (slaked lime : sand) 1:2 proportion as base coat and finishing coat of 10mm of lime mortar (slaked lime : sand) 1:1 proportion including rounding or chamfering corners, arrises, junctions, etc wherever re quired smooth rendering, including jute netting, lead charges for lime and sand, lift charges above 3mt height providing and removing scaf folding, grinding machine, cost of materials, labour, curing etc., The dashing of the first coat to be done using a strong whipping motion at right angles to the face of the wall. The plaster shall be trowelled hard and tight forcing it into joints to obtain a good bond and surface rubbed smooth with a plaster’s trowel complete as per specification and IS 2394 (1984). Curing shall be started 24 hrs after finishing the plaster. The plaster shall be kept wet for a period of 7 days etc complete as per direction of the Engineer in charge of the work.

60.48

1178

71295.0336

... More
code50 - Providing and finishing external walls in two coats over one coat of 100% acrylic silicon glazed primer with antifungal paint top coat of approved brand and shade to give an even shade after thoroughly brooming the surface to remove all dirt and loose powdered material, free from mortar drops and other foreign matter cost of materials, labour, complete as per specifications.

60.48

210

12703.2192

... More
code51 - Providing ruled pointing to coursed stone masonry with lime mortar 1:3, 20mm deep, after raking joints to depth of 20mm nicely lining, including cost of materials, labour, curing complete as per specifications.

641.79

247

159035.562

... More
code52 - Removing debris such as brick bats,concrete,earth wastage materials etc., beyond 5km outside the monument through vehicle including hire cherges of vehicle, crew charges, labour charges for loading & unloading etc., complete as dircted by the higher authorities. (Data Rate)

214.42

153

33018.5358

... More
code53 - Providing and Fixing Teak wood Door as per existing style for the temple including Preparing, including cost of materials, labours, transportation charges and HOM of machinery complete as per specification (Data rate)

3

57466

172398

... More
code54 - Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.n area of thorny jungle

32

1323

42366.72



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.