Bruhat Bengaluru Mahanagara Palike Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Bruhat Bengaluru Mahanagara Palike - BBMP Tender

Civil And Construction
Civil Works Others
Opening Date6 Apr 2022
Closing Date13 Apr 2022
Tender Amount₹ 94,11,298 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Planting of Shrubs ( b) Cost of the plant(8 plants per sqm) (Including Transportation and Handling charges)

1748.5

-

1049100

... More
Hedges: Developing hedges by digging of trenches of size 0.45mX0.45m and Filling up to 50% of the pits top excavated soil and Remaining 50% withmixture of sand (0.0112cum),Fym(0.0224cum),Red earth(0.021 cum)(i.e in the proportion of 1:2:3 & planting with well established plants.exclusive of cost of plants & inclusive of ingredients

1000

-

195000

... More
( b) Cost of the plant(7 plants per rmt) (Including Transportation and Handling charges)

1000

-

210000

... More
:(Scraping and Removing of Top Soil) a. Cleaning the site by scraping and Removing Top layer of Soil.removing unwanted debries grass,along with excavated earth to a distance of 500m from the spot including lead lift loading and unloading charges (1X1X0.15m)

3093.75

-

213592.5

... More
1st digging for lawn Earthwork digging for lawn removing weeds debries if any and breaking of clumps watering etc

3093.75

-

300588.75

... More
2nd digging for lawn digging for second time and removing weeds debries if any minor levelling to a depth of 0.45m

3093.75

-

150294.38

... More
Soil Filling for lawn Supply and stocking good quality red earth etc for the filling of top layer to a depth of 0.15m 1.0X0.15 (1X1X0.15)

3093.75

-

203599.69

... More
Providing Sand,FYM and Red earth in the ratio of 1:3:6 and spreading to a depth 7.5cm at the required site

3093.75

-

166443.75

... More
Chemical Fertilizer :super Phosphates (50gm/sqm:Rs 0.1.00sqm),Neem oil cake (250gm/sqm:Rs 6.00/sqm), Bonemeal250gm/sqm:4.00/sqm) Potash(50gm/sqm: Rs1.00/sqm), Furdon(25gm/sqm:Rs.2.00sqm) Ammonium sulphate (100gm/ sqm :rs2.00/sqm)

3093.75

-

49500

... More
13.g.supply of lawn grass:4)Mexican grassb.Turf

1189.38

-

285451.2

... More
13.g.supply of lawn grass:4) Bermuda grass

1904.3

-

28564.5

... More
13.h.Other charge: Cost toward dibbling /laying of lawn inclusive of mixing of ingradients,application of manure and spreading (5X5cm)

3093.75

-

259875

... More
15.Sprinkler system:providing and Fixing of sprinkler system with in the site by using 25mm/10kg, 40mm/6kg good quality PVC pipes ,ISI marked sprinklers,controle valves and fittings etc.,Including excavation and backfilling trenches (Excluding of providing borewell ,Electrification and Pump),As per the specification and direction of the concerned officer.Rates may be quoted as per data rate specific to the field condition

100

-

400000

... More
Providing and placing Granite sitting benches

20

-

1200000

... More
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Ficus Benjimina Black ( 90cm - 150cmm ht) Ficus traingularis Including cost of plant, materials, transporation and handling & planting Cost) (Horticulture Division BBMP SR 2019-20 Page No.6 Item No-16 (9)

38

-

95000

... More
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Ficus Benjimina Starlight( 90cm - 150cmm ht) Ficus traingularis Including cost of plant, materials, transporation and handling & planting Cost) (Horticulture Division BBMP SR 2019-20 Page No.6 Item No-16 (9)

29

-

72500

... More
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Ficus Ponda ( 90cm - 150cmm ht) Ficus traingularis Including cost of plant, materials, transporation and handling & planting Cost) (Horticulture Division BBMP SR 2019-20 Page No.6 Item No-16 (9)

37

-

92500

... More
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Golden Cyprus ( 90 - 120 cm ht ) Including cost of plant, materials, transporation and handling & planting Cost) (Horticulture Division BBMP SR 2019-20 Page No.7 Item No-16 (16)

48

-

72000

... More
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Plumeria Alba / Rubra ( 150cm - 240cm ht ) Pulmeria Rubra ( 150cm - 240cm ht ) Including cost of plant, materials, transporation and handling & planting Cost) (Horticulture Division BBMP SR 2019-20 Page No.6 Item No-16 (12)

1

-

3000

... More
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Plumeria Pudica ( 150cm - 240cm ht ) Including cost of plant, materials, transporation and handling & planting Cost) (Horticulture Division BBMP SR 2019-20 Page No.6 Item No-16 (13)

210

-

210000

... More
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Roystonea Regia (180cm - 240cm ht)(Royal Palm) Including cost of plant, materials, transporation and handling & planting Cost) (Horticulture Division BBMP SR 2019-20 Page No.5 Item No-16 (3)

23

-

57500

... More
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Caryota Urens (240cm - 300cm ht) (Fish Tail Palm) Including cost of plant, materials, transporation and handling & planting Cost) (Horticulture Division BBMP SR 2019-20 Page No.5 Item No-16 (4)

24

-

60000

... More
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Woodyetia Bifurcata (Fox Tail Palm-120-150cm height) Including cost of plant, materials, transporation and handling & planting Cost) (Horticulture Division BBMP SR 2019-20 Page No.7 Item No-16 (15)

25

-

62500

... More
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Rapis Excelsa ( 90cm - 1200cm ht) Including cost of plant, materials, transporation and handling & planting Cost) (Horticulture Division BBMP SR 2019-20 Page No.5 Item No-16 (7)

50

-

75000

... More
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Cycas Revoluta Plant 60 cm dia 60 cm ht.(Including cost of plant, materials, transporation and handling & planting Cost) (Horticulture Division BBMP SR 2019-20 Page No.5 Item No-16 (8)

20

-

60000

... More
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Topiary plants of conica shape 6-7feet height bottom shape 2 feet dia (Including cost of plant, materials, transporation and handling & planting Cost) (Horticulture Division BBMP SR 2019-20 Page No.5 Item No-45

10

-

195000

... More
Rectangular cement olanter Box pots(3'x1.5x1.5 size)(Horticulture Division BBMP SR 2015-16 Page No.6 Item No-16 (8)

64

-

185600

... More
Maintainance of park : for parks of area from 4001 to 16000sqm, A.details of works to be done in the parks by concerned firm/agency/contractor a.Watering: b.weeding: C.Sweeping; d.maintainace of shrubs: e.Lawn moving: f.prunning and digging of soil: g.Transportation: h.Monitoring the park: i.tenderer/Agency: j.Any other instructions. B.General terms

9000

-

562500

... More
KSRB 4-1.2: Providing and laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @ 0.892 cum and fine aggregates @ 0.465 cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Specification No. KBS 4.1, 4.2. (P.No.12, I.No.4.2 of PW,P&IWTD S.R 2018-19)

17.28

-

103494.24

... More
Providing and constructing load bering wall with cement concrete solid blocks of size 400x150x200mm having block density not less than 1800kg/m3 having a minimum average compressive strength of 5.00N/mm2 confirming to IS 2185(Part 1):2005 and constructed with CM 1:4, as per IS 2572:2005 including cost of materials, labhour charges, scaffolding, curing, hire charges of machineries etc., complete as per specifications

38.4

-

38790.91

... More
Providing 18mm thick cement plaster in single coat with cement mortar 1:3 to brick masonry including rounding off corners wherever required smooth rendering,: providing and removing scaffolding, including cost of materials,labhour, curing complete as per specifications

76.8

-

22468.61

... More
Providing and laying/fixing cement base, precast, pre polished cement concrete, designer tiles 25mm thick for flooring conforming to IS 1237 heavy duty tiles for flooring, treads of steps and landing, laid on a bed of 12mm thick cement mortar 1:3 mis finished with flush pointing using white cement, including cost of materials, mortar, including cutting, griding the edge to half/full round wherever required, labour, curing complete as per specification.

115.2

-

150441.98

... More
KSRB 4-1.6: Providing and laying in position plain cement concrete of mix 1:2:4 with cement @ 240kgs, with 20mm and down size graded granite metal coarse aggregates @ 0.878 cum and fine aggregates @ 0.459 cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation and plinth, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Specification No. KBS 4.1, 4.2. (P.No.12, I.No.4.6 of PW,P&IWTD S.R 2018-19)

17.28

-

108430.1

... More
KSRRB M300-1. Earth work excavation by manual means in ordinary soil involving an average horizontal throw upto 2 meters and an average lift upto 0.5m, excavated surface levelled and sides neately dressed, the disposed earth to be levelled neatly after breaking of clods complete as per specification. MORTH / Chapter 3 (P.No.142, I.No.19.1 of PW, P&IWTD SR 2018-19)

125.55

-

17300.79

... More
KSRB 2.8 : Providing and Filling in foundation with granite / trap broken metal 100mm. and down size, with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift. complete as per specifications. specification. No. KBS

125.55

-

314109.78

... More
KSRB 2.6 : Providing and filling sand in foundation to required depth for sub soil treatment including watering ramming with all lead and lift complete as per specifications. specification. No. KBS 2.1 0.2

69.75

-

147995.55



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.