Bengaluru Water Supply And Sewerage Board Tender
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.
Bengaluru Water Supply And Sewerage Board - BWSSB Tender
Civil And Construction
Drainage Work
Opening Date24 Dec 2024
Closing Date7 Jan 2025
Tender Amount₹ 33,57,258.05
Costs
EMD
₹ 79,500Document Cost
Refer DocumentsTender Fee
₹ 840
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
BWSSB/2024-25/WS/WORK_INDENT1960Tender No
BWSSB/2024-25/WS/WORK_INDENT1960Tender Authority
Bengaluru Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://kppp.karnataka.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
a03b - Depth exceeding 1.5 m, but not exceeding 3 m
33.06
331
10942.86
... More
a04 - Providing and Filling in foundation with granite / trap broken metal 100mm and down size with approved M-Sand including hand packing, ramming, watering including cost of all materials and labour with all lead and lift complete as per specifications.
14.93
2682
40042.26
... More
a05 - Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey. 450mm Dia RCC NP-3 class Pipe
76.6
2353
180239.8
... More
a05a - 600mm Dia RCC NP-3 class Pipe-For Trenchless Portion
49.8
3140
156372
... More
a06 - Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading, danger lighting and using of sight rails and boning rods wherever necessary, shoring and strutting wherever required using Ordinary Port Land Cement, using 1:1.5:3 proportion RCC with 20 mm and down graded jelly, well graded sand and steel of approved quality, 200 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft alround the chamber as in approved drawing, benching concrete with 1:6 slope towards the central drain finished smooth, including fixing and grouting of pipes, including conveying to work spot supply and fixing SFRC Machinehole cover and frame (Heavy duty) conforming to IS:12592 with latest amendments, on a bed of CC 1:2:4 Providing and fixing of minimum 3 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia. Grade Fe-500 steel bar (as per IS 1786) staggered at 300 mm apart as detailed in Technical specifications, including stone grit beding wherever required, watering, curing, engraving Machinehole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Pre-cast RCC Machinehole are for various diamters and depths as stated below and as per detailed drawings, specifications and direction of the Engineer. For 1.2m dia Machinehole, 1.3 M depth & SFRC cover & frame Constructing Pre-cast RCC Machinehole 1.2 m internal dia. , 1.90 M depth & SFRC cover & frame MH1=1.90m, MH3=1.90m
1
49213
49213
... More
a06a - Constructing Pre-cast RCC Machinehole 1.2 m internal dia. , 1.90 M depth & SFRC cover & frame MH2=2.10m
2
58357
116714
... More
a06b - Constructing Pre-cast RCC Machinehole 1.2 m internal dia. , 2.00 M depth & SFRC cover & frame MH2=2.10m
1
61322
61322
... More
a06c - For Every 0.10 m depth between 2.0m to 3.0 m depth MH2=2.10m
0.1
17166
1716.6
... More
a07 - Excavating of ramming/jacking/driving pit and receiving pit of size 5.00m(length) x 3.00m (breadth), up to 6.00 m depth in all soil strata including shoring and strutting including cutting of Asphalt/CC/Macadam road surface and removing the excavated stuff with all lead and lifts. The work includes formation of CC/RCC of 1:3:6 with or without 20mm steel with suitable spacing. The work also to receive the impacts driving pushing operation of encasing pipe. The cost includes driving the horizontal bore by pushing/jacking methods (trenchless technology method) by using construction agencies' cranes, jacks, jacking materials, generator, welding machineries, compressor, jack hammer and other equipments etc., without interfering and causing any hindrance to the movement of traffic or any other vehicles, without any disturbances to the railway/road/canal formation etc., The cost also includes bailing / pumping of water where ever necessary without affecting any installation like water supply and sanitary pipeline/telephone cable, electric cables etc. The work comprises of water for curing, carriage and fixing charges, concrete up to plinth for erecting and conducting the hydraulic pushing arrangements apart from passing through and scooping the earth inside the pipes and pit and depositing and disposing the surplus earth to a designated/ approval place and levelling the site after completion of entire work as directed by Engineer in Charge. The rate is excluding the cost of MS pipes size up to 5 m X 3 m - depth up to 4 m
1
173559
173559
... More
a08 - Installation of product pipe by manual jacking method - Manufacturing,providing, transporting, rolling, lowering, laying & jointing, testing, commissioning of ERW (Electric Resistance Welded), SAW (Submerged Arc Welded) MS pipe (Fe-410 grade) conforming to IS 3589-2001 with latest ammendments including perfect linking welding of joints to correct position including cost and conveyance of pipes and materials with all lead ,lift, cost of labour, loading and unloading of pipes for the following diameters with specified thickness of plate as noted below including bailing out of water wherever necessary for laying of carrier pipe of suitable dia including inside and outside of casing pipe painted with two coats of Anti corrossive tankmastic paint. Installation of steel pipe by Ramming / Jacking method to cross Railway track / NH /BDA /BBMP/Other roads/Existing utilities / NALA crossings, filling the gap between casing pipe and carrier pipe with quarry grit using compressor with all necessary equipments, plants etc, complete. Suitable spacers of HDP/MS or other similar material should be provided in between carrier & casing pipe to prevent carrier pipe forming metallic contact with casing pipe. Note : a. The cost of jacking is inclusive of cost M.S. casing pipe of specified thickness b. The cost of carrying pipe is separate and provision shall be made as per site requirement c. The cost of Jacking includes all leads lifts, cost of consumables, fuel charges, labour. d. The cost of jacking and receving pits shall be proposed seperatelly as per site requirement Jacking of 900 mm dia & 12mm thick M.S. Casing Pipe.
51
44344
2261544
... More
a09 - Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications
53.48
160
8556.8
... More
a10 - Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work.
84.33
85
7168.05
... More
a11 - Dewatering the sewage / storm water by using reqired HP submersible pump for the diversion of storm / sewage during the execution of work. Considering for one Pump.10 hp pump
180
426
76680
... More
a12 - Providing M-Sand : Supplying and filling in plinth,foundations / UG cable work with approved M-sandincluding watering, ramming, consolidating anddressing.The rate includes the cost of material, labour charges,required tools and plants etc., complete. Work shall becarried out as per the instructions of Engineer- in-charge ofworks as per the standard procedure
23.7
1965
46570.5
... More
a13 - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
23.7
2559
60648.3
... More
a14 - Providing and applying primer coat with SS1 grade Bituminous Emulsion on prepared surface of granular Base including cleaning with mechanical Broom of road surface and spraying primer at the rate of 0.90 kg/m2 using mechanical means.
79
53
4187
... More
a15 - Providing and laying Bituminous Macadam with 120 tphcapacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.3% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction
3.95
7536
29767.2
... More
a16 - Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom
79
14
1106
... More
a17 - Providing and laying Bituminous Concrete with 120 TPH capacity hot mix plant batch type using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.2 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
3.16
10705
33827.8
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements