Archaeology And Museums Department Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Archaeology And Museums Department Tender

Opening Date17 Mar 2021
Closing Date31 Mar 2021
Tender Amount₹ 1,05,79,933 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Numbering and removing Adhistana Stone the stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Only length of stone should be measured) (Data Rate)

768

-

441600

... More
Numbering and removing Pillar Stone the stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

121.6

-

89376

... More
Numbering and removing Pillar Capitals Stone the stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

100

-

52000

... More
Numbering and removing Pillar base Stone the stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

16

-

8320

... More
Numbering and removing Door Base stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

8

-

4600

... More
Numbering and removing Door jams stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

14.4

-

11304

... More
Numbering and removing Door Lintels stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

8

-

5880

... More
Numbering and removing Beams stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

180.4

-

132594

... More
Numbering and removing Veener stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

169.64

-

111962.4

... More
Numbering and removing Chejja stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

44.85

-

36777

... More
Numbering and removing teeth stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

69

-

63480

... More
Numbering and removing Ceiling stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

321.26

-

245763.9

... More
Numbering and removing Flooring stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

165.6

-

63756

... More
KSRB 2-2.2: Earthwork in surface excavation for foundation of buildings, culverts water supply, sanitary lines and electrical conduits either in pits or in trenches 1.5m. and above width, in Ordinary soil not exceeding 1.5m. in depth including dressing the bottom and sides of pits and trenches stacking the excavated soil clear from edgesof excavation with lead upto 50m. after breaking of clods complete as per specifications. Specification No. KBS 2.1 (a) 2.3.5.

230.4

-

68889.6

... More
KSRB-4-1.3 : Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180kgs, with 40mm and down size graded granite metal coarse aggregates @ 0.85cum and fine aggregates @ 0.57cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation including cost all materials, labour, HOM of machinery, curing complete as per specifications.

28.8

-

151747.2

... More
KSRB 2.8 : Providing and Filling in foundation with granite / trap broken metal 100mm. and down size, with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift. complete as per specifications.

76.8

-

190540.8

... More
KSRB 5.1-3 : Providing and constructing granite / trap / basalt rubble stone masonry in foundation with cement mortar 1:6 (uncoursed), bond stones at two m. apart in each course including cost of materials, labour, curing complete as per specifications.KBS 5.1.12

204

-

781524

... More
KSRB 5-2.3 Providing and constructing granite/trap/basalt size stone masonry in foundation with cement mortor 1:6, stone hammred dressed courses not less than 20cms high, bond stones at two m. part in each course including cost of materials, labour, curing, complete as per specifications. KBS 5.1.13

15.36

-

80778.24

... More
Supplying of Solid granite stone all sizes of from Doddaballapura /Chikkaballapura quarry to work spot with all lead and lift and labour charges including hiring charges for chain and pulley block transportation etc., complete as directed by Engineer-in-charge of work (Data rate)

84.11

-

1463514

... More
KSRRB M100-4.1 Cost of Haulage Excluding Loading and Unloading MORTH - 100 / Chapter 1 Case-I : Surface Road

84.11

-

113440.84

... More
Providing Dressing to Adhistana stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

102

-

401370

... More
Providing Dressing to Veener stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

159.25

-

564382

... More
Providing Dressing to Chejja stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

86.4

-

307584

... More
Providing Dressing to Celing stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

9.6

-

37536

... More
Providing Dressing to Pillar stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

21.6

-

94392

... More
Providing Dressing to Pillar capitals stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

23.04

-

120499.2

... More
Providing Dressing to Beams stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

25.11

-

93911.4

... More
Providing Dressing to Door Base stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

10.8

-

38124

... More
Providing Dressing to Door jams stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

19.44

-

90687.6

... More
Providing Dressing to Door Lintels stone members all sizes of the existing structure the stones should be removed carefully in such a manner that no damages should be made to the existing sculptures and stacking the stones with in the monument premises including cost and conveyance of all materials, labour charges etc; complete as per the directions of the Engineer incharge of the Work (Data Rate)

10.8

-

40392

... More
Providing two line dressing to granite stone slab / granite stone masonry as per specification.

269

-

402155

... More
Resetting of Adhisthana stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

768

-

668160

... More
Resetting of Pillar Base stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

16

-

10880

... More
Resetting of Pillar stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

121.6

-

119168

... More
Resetting of Pillar Capitals stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

100

-

92500

... More
Resetting of Beams stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

180.4

-

176792

... More
Resetting of Door Base stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

8

-

6960

... More
Resetting of Door Jams stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

14.4

-

13680

... More
Resetting of Door lintels stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

8

-

6960

... More
Resetting of Ceiling stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

321.26

-

310015.9

... More
Resetting of Veener stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

169.64

-

145890.4

... More
Resetting of Chejja stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

44.85

-

43280.25

... More
Resetting of Teeth stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

69

-

75210

... More
Resetting of Flooring stone members including conveying from stocked position lifting by chain and pully blocks and setting on its proper position to correct line and plumb and level with all lead, lifts and labour charges, including hire charges for chain and pully block etc, Complete including hire charges of scaffiloding materials and as directed by the engineer in charge of work.

269

-

102220

... More
Providing approved M-sand to site for laying of flooring slabs etc., complete as per direction of engineer incharge of work

20.18

-

35315

... More
Providing lime concrete terracing on roofing, for weather proof course, average thickness 100mm, laid to slope with 25mm nominal size brick jelly and 50% lime surkhi mortar 1:2 (one lime putty two surkhi ) rammed and finished with gur and Belgiri treatment rounding off junctions with parapets including cost of materials, labour complete as per specifications.

186.26

-

294290.8

... More
KSRB-10.2: Providing and laying in position Yelahanka tiles of size 250 x 250 mm of approved quality and make, over a bed of cement mortar 1:3 an average thickness 25mm over weather proof course and pointed with cement mortar 1:3 mix with red oxide including curing cost of materials, labour complete as per specifications.

186.26

-

185514.96

... More
Stone cleaning specification :Cleaning unpolished granite surface by application of Proven, Readily Biodegradable, VOC free, stabilised, Non-Dilutable, Water Base & Ready to use (RTU) liquid chemical formulation with no contact time restriction over the heavily soiled unpolished granite stone surface using a 30 psi spraying equipment / Roller / Brush spreading & thoroughly wetting the chemical @ minimum 0.25 ltr to cover 1sq.mtr on the surface to be treated. Allow the penetration & chemical reaction time for a minimum of 24 hrs time. The surface is then low pressure water rinsed with rotary nozzle @ 700 psi after scrubbing the surface till the organic & inorganic contamination, dirt, hydro-carbon soils, algae & rust stains from both the surface & pore of the substrate is completely removed, the stone is returned to its natural colour & permeability restored. The formulation being used should be free from corrosive acids such as Hydrochloric or Muriatic acid, Hydrochloric acid, caustics or Sodium Hydroxide, bleach or sodium Hypochlorite, abrasives and petroleum distillates. No free Acids or Alkalis to be used. The process should include all chemical materials, labour, application tools, spraying equipment, Low pressure washer, safety procedures, hand gloves, face shields, goggles, protective wear clothing, scaffolding & working platform, lead & lift, transportation, all incidental charges etc., complete as per the directions of the Engineer-in-charge of the work.

260

-

117260

... More
Providing and Constructing Gopur's of Temple as per ancient style of such a manner that sculptures, ornamental flower, stucco figures, small domes of different sizes pillars at alternate height and width has to be constructed with a most care. After completion of brick masonry work of Vimana Gopura structure. (Excluding brick masonry work) Structures like sculptures, ornamenal flower, stucoo figures, small domes of different sizes pillars are to be designed and these structures has to be finished by doing cornice work in lime mortar 1:3, necessary formwork, scaffolding has to be provided in such a manner by giving sufficient space for easy movement of pilgrims, for conveyence of construction materials from ground level up to the Vimana Gopura top, and also making provision for easy approch for inspection by the higher Authorities and officer in charge of work. The sacffolding should be removed after completion of Gopura work proper curing is to done for entire Vimana Gopura structure until painting work. (Minimum 30-45 days curing is required).After proper curing of masonry work and plastering work water proof lime painting using ISI make materials one coat primer and 2 coat of water proof lime painting is to be done as per the direction of Higher Authorities. Proper curing s to be done and proper care is to be taken before and during the Exhibition of Vimana Gopura work, the entire work should be completed with in stipulated period in all respect as per the direction of the competent Authorities from time to time. (Full work) Size: 3.60 x 3.60 x 3.90m

2

-

949400

... More
Providing and Constructing Corner Idols of Temple as per ancient style of such a manner that sculptures, ornamental flower, stucco figures, small domes of different sizes pillars at alternate height and width has to be constructed with a most care. After completion of brick masonry work of Vimana Gopura structure.Structures like sculptures, ornamenal flower, stucoo figures, small domes of different sizes pillars are to be designed and these structures has to be finished by doing cornice work in lime mortar 1:3, necessary formwork, scaffolding has to be provided in such a manner by giving sufficient space for easy movement of pilgrims, for conveyence of construction materials from ground level up to the top, and also making provision for easy approch for inspection by the higher Authorities. (Minimum 30-45 days curing is required). .of Size : 1.20 x0.60 x 1.00m)

12

-

178800

... More
KSRB-6.4.3: Providing and constructing burnt brick masonry with approved quality of modular bricks ground moulded of standard size of class designation 3.5 Newton per sqmm with cement mortar 1:6 for basement and superstructure with cost of materials, labour charges, scafflolding, curing complete as per specifications.

44.5

-

300553

... More
Providing a fresh lime mortar plaster in 1:2 propon. As a base coat to a thickness of 20-25mm and with lime mortar 1:1 propn 10mm thick as afine coat including preparation of moulding as per original design including using fibre material such as black jaggary, jute, balefruit and egg etc., including lead charges for lime and sand, lift charges above 3mt height including higher charges for scafolding materials, grinding machine etc., complete as per the direction of higher authorities.(Non Schedule items)

83.4

-

65719.2

... More
Providing and finishing external walls in two coats over one coat of 100% acrylic silicon glazed primer with antifungal paint top coat of approved brand and shade to give an even shade after thoroughly brooming the surface to remove all dirt and loose powdered material, free from mortar drops and other foreign matter cost of materials, labour, complete as per specifications.

83.4

-

15012

... More
Providing ruled pointing to coursed stone masonry with lime mortar 1:3, 20mm deep, after raking joints to depth of 20mm nicely lining, including cost of materials, labour, curing complete as per specifications.

939.95

-

197389.5

... More
Removing debris such as brick bats,concrete,earth wastage materials etc., beyond 5km outside the monument through vehicle including hire cherges of vehicle, crew charges, labour charges for loading & unloading etc., complete as dircted by the higher authorities. (Data Rate)

83.82

-

11818.62

... More
Providing and Fixing Teak wood Door as per existing style for the temple including Preparing, including cost of materials, labours, transportation charges and HOM of machinery complete as per specification (Data rate)

2

-

97400



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.