Archaeological Survey Of India Tender
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.
Archaeological Survey Of India - ASI Tender
Civil And Construction
Civil Works Others
Electrical and Electronics
Electrical Works
Eprocure
Opening Date28 Dec 2023
Closing DateCancelled
Tender Amount₹ 21,58,400
Costs
EMD
₹ 54,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Summary
Mcew Cons Emergency Work To Laying Of Electrical Cable Line And Shifting Of Poles And Transformer At The Entrance Of The Fort Chitradurga 2023 24
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_ASI_787817_1Bid Award Id
ViewTender No
T-15011/128/2023-Bangalore CircleTender Authority
Archaeological Survey Of India ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Shifting Transformer: PART-I:Material::11 kV, 45 KN
Polymeric Insulator
3
-
-
... More
Shifting Transformer: PART-I:Material::Guy Set Complete with No. 15 Strain Insulator & Concreting materials
4
-
-
... More
Shifting Transformer: PART-I:Labour::Guy Set Complete with No. 15 Strain Insulator & Concreting materials
4
-
-
... More
Shifting Transformer: PART-I:Material::Earthing materials pipe type for grounding (Single Electrode with accessories)
3
-
-
... More
Shifting Transformer: PART-I:Labour::Earthing materials pipe type for grounding (Single Electrode with accessories)
3
-
-
... More
Shifting Transformer: PART-I:Material::Caution/Danger
Board
1
-
-
... More
Shifting Transformer: PART-I:Labour::Caution/Danger Board
1
-
-
... More
Shifting Transformer: PART-I: Material::Anti Climbing Device (12 Mtr GI Barbed Wire)
2
-
-
... More
Shifting Transformer: PART-I: Labour::Anti Climbing Device (12 Mtr GI Barbed Wire)
2
-
-
... More
Shifting Transformer: PART-I:Labour::Guy concreting with Boulders, Mud and Sand
4
-
-
... More
Shifting Transformer: PART-I:Material::GI Wire 8 SWG
5
-
-
... More
Shifting Transformer: PART-I:Material::Guy wire 7/10 SWG
10
-
-
... More
Shifting Transformer: PART-I:Material::11 kV Lightning Arrester, Metal Oxide 9 kV, 5 kA Polymeric type with ground disconnector
1
-
-
... More
Shifting Transformer: PART-I:Labour::11 kV Lightning Arrester, Metal Oxide 9 kV, 5 kA Polymeric type with ground disconnector
1
-
-
... More
Shifting Transformer: PART-I:Material::a) LT Distribution box for 250 kVA with MCCB
1
-
-
... More
Shifting Transformer: PART-I:Labour::a) LT Distribution box for 250 kVA with MCCB
1
-
-
... More
Shifting Transformer: PART-I:Material::b) LT Wiring (From DTC to LT Line via Metering Box & LT Protection Kit) DOUBLE
CIRCUIT:i) Al Lead Wire - 240 Sq mm
45
-
-
... More
Shifting Transformer: PART-I:Material::b) LT Wiring (From DTC to LT Line via Metering Box & LT Protection Kit) DOUBLE
CIRCUIT::ii) Heavy Duty Long Barrel Copper Lug - 240 Sq mm
12
-
-
... More
Shifting Transformer: PART-I:Material::b) LT Wiring (From DTC to LT Line via Metering Box & LT Protection Kit) DOUBLE
CIRCUIT::iii) PG Clamp - Rabbit to 240 Sq mm
4
-
-
... More
Shifting Transformer: PART-I:Material::b) LT Wiring (From DTC to LT Line via Metering Box & LT Protection Kit) DOUBLE
CIRCUIT::iv) Spacer for DTC Wiring
8
-
-
... More
Shifting Transformer: PART-I:Material::b) LT Wiring (From DTC to LT Line via Metering Box & LT Protection Kit) DOUBLE
CIRCUIT::v) Fish Plate with necessary Clamps, bolts & nuts etc complete (Galvanized)
2
-
-
... More
Shifting Transformer: PART-I:Labour::b) LT Wiring (From DTC to LT Line via Metering Box & LT Protection Kit) DOUBLE CIRCUIT::From Item No-20 to 24
1
-
-
... More
Shifting Transformer: PART-I::Material::c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS - 39)
1
-
-
... More
Shifting Transformer: PART-I::Labour::c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS - 39)
1
-
-
... More
Shifting Transformer: PART-I::Material::d) LT Electronic Tri- Vector Meter 5 Amps, -0.5/1.0 Accuracy Class
1
-
-
... More
Shifting Transformer: PART-I::Labour::d) LT Electronic Tri- Vector Meter 5 Amps, -0.5/1.0 Accuracy Class
1
-
-
... More
Shifting Transformer: PART-I::Material::11 kV, Solid Core Type HG Fuse Unit
1
-
-
... More
Shifting Transformer: PART-I::Labour::11 kV, Solid Core Type HG Fuse Unit
1
-
-
... More
Shifting Transformer: PART-I::Material::11 kV, 200 Amps, Single Break GOS
1
-
-
... More
Shifting Transformer: PART-I::Labour::11 kV, 200 Amps, Single Break GOS
1
-
-
... More
Shifting Transformer: PART-I:Labour::11kV/433V, 250 kVA, 3 Phase, 50 Cys Distribution Transformer BEE - 4 Star Rated with oil
1
-
-
... More
Shifting Transformer: PART-II::Double Pole Structure complete including 5 Kg, 8 SWG GI Wire for Structure Grounding
3
-
-
... More
Shifting Transformer: PART-II::Strain Clamp, 3 Bolt type for 70/90 kN Disc Insulator
6
-
-
... More
Shifting Transformer: PART-II::Material::11 kV, 3 Core, XPLE HTUG Cable with pressure extruded inner sheet, ROUND WIRE ARMOURED as per IS-7098 (Part-2) Armoring wires dia and Resistivity as per IS-3975
0.45
-
-
... More
Shifting Transformer: PART-II::Labour::11 kV, 3 Core, XPLE HTUG Cable with pressure extruded inner sheet, ROUND WIRE ARMOURED as per IS-7098 (Part-2) Armoring wires dia and Resistivity as per IS-3975
0.45
-
-
... More
Shifting Transformer: PART-II::Material::Heat Shrinkable Outdoor Type Cable Termination Kit for XLPE Cable
12
-
-
... More
Shifting Transformer: PART-II::Labour::Heat Shrinkable Outdoor Type Cable Termination Kit for XLPE Cable
12
-
-
... More
Shifting Transformer: PART-II::Material: Route & Joint indicating slab with MS Anchor rod
10
-
-
... More
Shifting Transformer: PART-II::Labour: Route & Joint indicating slab with MS Anchor rod
10
-
-
... More
Shifting Transformer: PART-II::Material: GI Pipe B - Class as per IS-1239 GI Pipe - 100 mm Dia
36
-
-
... More
Shifting Transformer: PART-II::Labour:GI Pipe B - Class as per IS-1239: Laying the GI Pipe 80 mm to 150 mm dia at Drainage Water Supply Crossing including fixing collars elbows, bends, Tees and other fitting with Cuts and Threads wherever necessary complete.
36
-
-
... More
Shifting Transformer: PART-II::Earth Work::Earth work excavation for cable trench of 0.5 to 0.75 Mtr. Width and Depth up to 1 Mtr including trial pits, depositing on bank up to a lead of 50 Mtr, Supplying and Displaying necessary Danger Boards and Lighting, Using sight Rails and Sign Boards at every 100 Mtr wherever necessary as directed.
271
-
-
... More
Shifting Transformer: PART-II::Earth Work::Refilling the cable trenches with selected available earth from trench excavation including watering, consolidation in layers of 15 cm. Thickness including depositing of the surplus earth with a lead of 200 Mtr
248
-
-
... More
Shifting Transformer: PART-II::Earth Work::Filling artificial sand/Manufacture sand around laying LTUG Cable etc., complete
27.12
-
-
... More
Shifting Transformer: PART-II::Labour::Double Pole Structure complete including 5 Kg, 8 SWG GI Wire for Structure Grounding
3
-
-
... More
Shifting Transformer: PART-III:: Laying 1.1 kV, XLPE or Heat resistant PVC insulated, PVC extruded Inner Seath Armored LTUG Cable as per IS-1554 (Part- 1) or IS7098 Part-1, Armoring strip thickness and resistivity as per IS- 3975
0.52
-
-
... More
Shifting Transformer: PART-III::Material::Three Phase Distribution Box for 6 Connection
2
-
-
... More
Shifting Transformer: PART-III::Labour::Three Phase Distribution Box for 6 Connection
2
-
-
... More
Shifting Transformer: PART-I: Labour Charges for Re fixing of 250 KVA Transformer at new place etc.,
1
-
-
... More
Shifting Transformer: Other Charges 2% Material Cost and Labour Charges
1
-
-
... More
Shifting Transformer: Employees Cost 20% on Labour Charges
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements