Airports Authority Of India

  • Tender Amount

    ₹ 2,83,58,317

  • EMD

    ₹ 5,67,166

  • Opening Date

    21 Mar 2019

  • Closing Date

    08 Apr 2019

Tender
Summary

Modification Expansion Of Existing Integrated Terminal Building At Mangaluru International Airport Sh Sitc Of Substation Equipments

A 1 NAME OF WORK: MODIFICATION / EXPANSION OF EXISTING INTEGRATED TERMINAL BUILDING AT MANGALURU INTERNATIONAL AIRPORT SH: SITC OF SUBSTATION EQUIPMENTS. (E - Bid No: 2019_AAI_24600_1) e-TENDER DOCUMENT MANGALURU INTERNATIONAL AIRPORT MANGALURU A 2 AIRPORTS AUTHORITY OF INDIA MANGALURU INTERNATIONAL AIRPORT MANGALURU NAME OF WORK : MODIFICATION / EXPANSION OF EXISTING INTEGRATED TERMINAL BUILDING AT MANGALURU INTERNATIONAL AIRPORT. SH: SITC OF SUBSTATION EQUIPMENTS. INDEX SL. NO. PARTICULARS Page Nos. 1 COVER PAGE A 1 to A 1 2 INDEX A 2 to A 2 3 PRESS NOTICE AND NOTICE INVITING e-TENDER A 3 to A 8 4 CHECK LIST A 9 to A 12 5 INSTRUCTIONS FOR ONLINE BID SUBMISSION A 13 to A 16 6A ACCEPTANCE LETTER - FORM “A” A 17 to A 17 6B AFFIDAVIT FOR PAYMENT OF MINIMUM WAGES - FORM “B” A 18 to A 18 7 DE – 6 B 1 to B 4 8 GENERAL CONDITIONS OF CONTRACT (GCC) (i) GCC INDEX 1 – 1 (ii) GENERAL GUIDELINES 2 – 2 (iii) TENDER FORM D.E.-7/8 3 – 4 (iv) GENERAL RULES AND DIRECTIONS 5 – 12 (v) CONDITIONS OF CONTRACT 13– 15 (vi) CLAUSES OF CONTRACT 16–77 (vii) AAI SAFETY CODE 78–82 (viii) MODEL RULES 83–87 (ix) AAI CONTRACTOR’S LABOUR REGULATIONS 88–92 (x) VARIOUS FORMS (APPENDIX I To XVII) 93–123 (xi) SCHEDULES 124– 130 (xii) ANNEXURE TO CLAUSE 34 (X) 131– 132 9 SPECIAL CONDITION OF CONTRACT SCC 01 – 09 10 TECHNICAL SPECIFICATIONS TS 01 – 24 11 SCHEDULE OF WORK SoW 1 - 6 Certified that this Tender Document consists of A1 to A18, B1 to B4, 1 to 132, SCC 01 – 09, TS 01 – 24, and SoW 1-6 Pages Sequentially. A 3 PRESS NOTICE AIRPORTS AUTHORITYOF INDIA TENDER NOTICE (E - Bid No: 2019_AAI_24600_1) Airports Authority of India invites Item Rate Tenders through CPP e-Tendering Portal on behalf of the Chairman, AAI from the Eligible Contractors for the Work of “MODIFICATION / EXPANSION OF EXISTING INTEGRATED TERMINAL BUILDING AT MANGALURU INTERNATIONAL AIRPORT. SH: SITC OF SUBSTATION EQUIPMENTS” for an Estimated Cost of Rs. 2,83,58,317.00 (Excluding GST) with Period of Completion 06 (SIX) Months. Last Date and Time of Sale and Submission of Bid Document is 08.04.2019 up-to 1730 Hours. For Detailed Information, log on to CPP e-Procurement Portal https://etenders.gov.in/eprocure/app or www.aai.aero. Further Clarification/Corrigendum if any will be notified through e-Procurement Portal https://etenders.gov.in/eprocure/app A 4 AIRPORTS AUTHORITY OF INDIA MANGALURU INTERNATIONAL AIRPORT MANGALURU No.: AAI/ENGG/ELECT/MGL/2019/ Dated: 21/03/2019 NOTICE INVITING e-TENDER (THREE ENVELOPES OPEN TENDER) (E - Bid No: 2019_AAI_24600_1) 1. Item Rate Tenders are invited through the CPP e-tendering Portal by the Senior Manager (Engg.-Electrical), AAI, Mangaluru International Airport, Mangaluru, on behalf of the Chairman, AAI, New Delhi from the Eligible Contractors for the Work of “MODIFICATION / EXPANSION OF EXISTING INTEGRATED TERMINAL BUILDING AT MANGALURU INTERNATIONAL AIRPORT SH: SITC OF SUBSTATION EQUIPMENTS”, for an Estimated Cost of Rs. 2,83,58,317.00 (Excluding GST) with Period of Completion 06 (Six) Months. 2. The Tendering Process is online at NIC e-Portal URL Address http://etenders.gov.in/eprocure/app. Aspiring Bidders may go through the Tender Document by Login CPP Portal. 3. Prospective Tenderers are advised to get themselves acquainted for e- tendering participation requirements available at “INSTRUCTION FOR ONLINE BID SUBMISSION”, register themselves at NIC e-tender Portal, obtain ‘User ID’ & ‘Password’ and go through the ‘Self Help Files’ available in the Home Page after log into the Portal “http://etenders.gov.in.” They should also obtain Class II or Class III Digital Signature Certificate (DSC) in parallel which is essentially required for submission of their application. The process normally takes 03 days time. The tenderer may also take Guidance from AAI He

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.