Agricultural Produce Market Committee Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Agricultural Produce Market Committee - APMC Tender

Opening Date4 Sep 2021
Closing Date15 Sep 2021
Tender Amount₹ 2,61,65,564 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

2020-21 Annual Action Plan Package-1, 8 Works

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying, spreading and compacting specified graded, gravel or any other course material 60% and Crushed Stone aggregate of Granite/trap/basalt 40% in sub-base course, close grading-1 including premixing the material at OMC in mechanical mixir (pug mill) carriage of mixed material, spreading in uniform layers with motor grader on a prepared base and compacting with power roller to achieve the desired density including all material, labour, HOM, lighting, guarding, barricading and maintenance of diversion complete as per specification as per Direction of the Engineer InchargeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

265.55

-

341348.59

... More
Providing and Constructing of dry lean cement concrete mix CC 1:5:10 base with OPC 25mm and down size graded granite metal coarse aggregate at 0.86cum and fine aggregates @ 0.58cum Sub-base over a prepared sub-grade with (coarse and fine aggregate conforming to IS:383:2016) aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per Table 600-1, optimum moisture content not to be less than 160 kg/ Cum., optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing complete as per specifications. Clause 601 of MoRTH V Revision and IS 456 Table - 5 as per Direction of the Engineer InchargeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

123.78

-

457063.84

... More
Cement concrete pavement :- Providing and Constructing of un reinforcement, dowel jointed , plain cement pavement Quality Concrete for Pavements using Grade concrete M40 having flexural strength not less than 4.50Mpa over a prepared sub base with OPC, Coarse aggregate at 0.64 cum, fine aggregate at 0.36 cum, coarse and fine aggregate conforming to IS: 383-2016 and Table 600-3 of MoRTH V Revision, with Superplasizer at 3 lts conforming to IS 9103-2008. as per drawing complete as per specifications.loading materials to batch mix plant as per approved mix design, transported to site in transit truck agitator 5 cum capasity, laid with Paver, compacted and finished in a continues operetion as per IRC-15 including cost for providing of constraction, expansion, construction and longitudinal joints, joint filler, separation membrane of impermiable plastic sheet of 125mm micron, grove cutting, sealant primer joint sealant, debonding srip, dowel bars at 9 kg/cum, tie rods at 1.15 kg/cum, admixtures as approved, curing compound, finishing to lines and grades, textured with texture machine, and curing including cost of all materials, labour, hire charges of machineries, all lead & lift charges etc., complete as per specification. Clause 601 of MoRTH V REVISON and IS 456 Table -5 with OPC at 420 kg/cum and coarse aggregate 0.64cum, fine aggregate 0.36cum using concrete batch mix plant at 75cum/hr capacity with slip form paver with electronic sensor.as per Direction of the Engineer InchargeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

247.55

-

1253464.47

... More
Vacuum de-watering with vacuum pump and suction mat and compaction with sking floater clubbed with floating disc including cost of generator, HOM of machinery, screed vibratory, power floater, blade and disc, etc. with all lead and lift. (as per Direction of the Engineer InchargeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1237.75

-

86692.01

... More
Earthwork excavation for foundation of buildings, water supply, sanitary lines and electrical conduits either in pits or in trenches 1.5m and above in width, in ordinary soil not exceeding 1.5 m. in depth including dressing the bottom and sides of pits and trenches, stacking the excavated soil clear from edges of excavation with lead upto 50 m. including breaking of clods complete as per specifications.as per Direction of the Engineer InchargeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1084.56

-

334011.94

... More
Providing and laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220 kgs, with 40mm and down size graded granite metal coarse aggregates @ 0.892cum and fine aggregates @ 0.465cum machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation including cost all materials, labour, HOM of machinery, curing complete as per specifications. for Kerbas per Direction of the Engineer InchargeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

181.43

-

970617.84

... More
Providing and laying in position Reinforced Cement Concrete of design Mix M-20 with OPC cement @ 320 Kgs with 20mm and down size graded granite metal of coarse aggregates @ 0.69 Cum. and fine aggregates @ 0.46 Cum., with superplastisiser @ 3 Ltrs conforming to IS 9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers not exceeding 15cms thick, vibrated for all works in foundation plinth and ground floor level for roof slabs, staircase, lintels, retaining walls, return walls, walls (any thickness) including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM , curing complete but excluding cost of reinforcement as per Specifications as per Direction of the Engineer InchargeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

121.03

-

734502.02

... More
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for foundation ,footings ,bases of columns for mass concrete including cost of all materials, labour complete as per specifications. as per Direction of the Engineer InchargeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1186.08

-

315188.9

... More
Providing T.M.T steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per specifications. as per Direction of the Engineer InchargeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

97.76

-

7145765.24

... More
Filling available excavated earth (excluding rock) in sides of foundations upto plinth in layers not exceeding 20 cms. in depth, compacting each deposited layer by ramming after watering with lead upto 50 m. and lift upto 1.5 m. including cost of all labour complete as per specifications.as per Direction of the Engineer InchargeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1315.71

-

272391.44

... More
Earthwork excavation for foundation of Structures upto 3.0mtr by mechanical means as per drawing and technical specification including setting out, providing shoring, strutting and bracing, removal of stumps and pther deleterious matter, dressing of sides and bottom, filling back the excavated earth to th extent required and utilizing / transporting the remainig earth upto 1.00KM lead. including cost of labour, materials and HoM etc., complete - In All types of Soils as per Direction of the Engineer InchargeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1304.88

-

69889.37

... More
Providing and laying in position R.C.C of design mix M25 with OPC cement @ 340kgs, with 20mm and down size graded granite metal coarse aggregates @0.70cum and fine aggregtes @ 0.47cum, with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation plinth and ground floor level for roof slabs, staircase, lintles, retaining walls, return walls, walls ( any thickness ) including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of machinery, curing, complete as per specifications.as per Direction of the Engineer InchargeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

176.38

-

1055874.18

... More
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for Suspended floors, landings, balconies and likes, thickness upto 200mm including cost of all materials, labour complete as per specifications. for heights more than 3.50m from ground level as per Direction of the Engineer InchargeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1609.02

-

593310.03

... More
Construction of Embankment with approved material Gravel/Murrum with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement table 300-2 complete as per specifications. Including cost of gravel/murrum, watering charges & compaction by vibratory roller to 95% of modified proctors density MORTH Specification No.305as per Direction of the Engineer InchargeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

745.96

-

249710.11

... More
Providing and Filling in foundation with granite / trap broken metal 100mm. and down size, with approved sand including hand packing, ramming, watering, including cost of all materials and labour with lead upto 50m. and lift of 1.5 m. complete as per specifications as per Direction of the Engineer InchargeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

74.34

-

185989.02

... More
Supplying and fixing M.S. Rectangular poles made out of 2 equal angles of 65x65x6 mm welded together and fixed in CC (1:2:4) WITH 2 NOS 16mm dia M.S. hold fast rods each if length 25 cms. Including cost of all materials cutting, bending scaffolding wherev complete as per specifcation andas per Direction of the Engineer InchargeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

306

-

270739.62

... More
Providing chain link fencing 50mm size of 8 guage properly stretched between rectangular poles and fixed with suitable bolts & nuts, the free ends shall be welded to the pole and block pipe at top and bottom as required including cost of all materials, la complete as per specifcation and as per Direction of the Engineer InchargeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

600

-

441870

... More
Providing and fixing MS block pipe of 38mm dia of heavy guage of 14 including removing the bends,cutting the pipes and fixing the pipe in between the two vertical poles( M.s rectangular poles ) and spot welding the chain link with MS block pipe including complete as per specifcation andas per Direction of the Engineer Incharge) The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

671.4

-

282149.14

... More
Geophysical Investigation of site for sinking Borewell Geophysical Investigation of site for sinking Borewell for supplying drinking water to the habitation either through a hand pump, Mini Water Supply scheme, or Piped Water Supply Scheme by vertical electrical sounding by adopting venner or Schlumberger's method, including reconnaissance survey of geological formation, geophysical investigation of existing ground water in the vicinity, its quality, quantity & acceptability of the users indicating the location of site, recommended depth of casing pipe required to seal the top unconsolidated formation incluing an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instrument and accessories to work site, engaging technical personal and labour required etc., complete .With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

4

-

15524.16

... More
Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 0 to 50m . With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

200

-

69400

... More
Sinking borewells sinking borewell of 165 mm dia clear using super fast hydrallic rig of capacity 250 PSIG & above 900 CMC & above in all strata including over burden up to 20m fixing of casing pipes,collars and cap with necessary cutting,treading and welding including transportation of rig and supporting vehicle,crew charges and cost of consumables etc., complete including yeild testing at the final depth with a minimum working of compresor for one hour (excluding cost of casing pipes,collars,cap erc.,) 50 to 100mtr. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

200

-

88400

... More
Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 100 to 150mtr . With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

200

-

91200

... More
Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 150 to 200m. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

200

-

107200

... More
Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 200 to 250mtr. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

200

-

126800

... More
Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 250 to 300mtr. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

200

-

140000

... More
Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 300 to 350mtr. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

200

-

165000

... More
Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 350 to 400mtr. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

90

-

81000

... More
Supply of ISI mark 175mm nominal bore,plain end steel casing pipe- grade of steel Fee 410 of wall thickness 5.4 mm thick confirming to IS 1387/1993 and manufactured by basic open hearth electric or basic oxygen process in random length of 5 to 7 mts. Both ends threaded confirming to IS 554/1985, one end fixed with a socket confirming to IS 4270;2001 and the other end with screwed pipes.All pipes shall be reasonably free from defects. The tube shall be reasonably straight should be with ISI marking, weighing 25.10kg/mtr. (Inclusive of all taxes) Casing Pipe. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

90

-

119250

... More
Providing 175 mm dia MS Collar. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

15

-

2250

... More
Providing 175 mm dia MS Cap. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

3

-

300

... More
Supplying and delivery of Submersible Pump Sets of 150mm dia suitable for bore well and confirming to IS 8034 specifications and its latest ammendments, 3-Phase, SS Bowl and impeller with low volt motor with testing as per instructions of Engineer incharge of work.15.00HP-135 LPM @ 266m=19 STG Outlet Dia-2.00".With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

61851

... More
Supply installing testing and commissioning COMMON Control panel consisting of the following INCOMING:1No Set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1 no with Phase selector switch, Isolating Switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection like single Phase preventor, Under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Outdoor type 6 to 15HP pumps. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

2

-

29870

... More
Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments 50mm Size .With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

4

-

4841

... More
Supply and delivery at site of brand new best make gate valve as per IS 778/1984 with ISI Mark and as per its latest amendments 50mm size .With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

1190

... More
Supply and delivery at site best indigenous brand new power capacitor as per IS 2834/1986 with latest amendments with KPTCL authorities and erection, electrification and commissioning of the same at the location of respective pump sets. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

2

-

900

... More
Earthing: Supplying and fixing and wiring earth electrode for grounding circuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of salt and charcoal 150mm around the pipe to complete depth. The connection from the pipe to the conduits etc. is to established through GI wire of sizes as per clause 7.3.3 of IS 732 using 12mm bolts, nuts, washers and check nuts, the pipe shall have 16 through holes of 12mm dia. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

2

-

7483.98

... More
Supply and delivery of galvanized mild steel tubes of 6 mtr standard length heavy class (C Class) as per IS 1239 (Part-I) 1990 with latest amendments with ISI Mark (one end fitted with heavy duty collar and other end fitted with protective cover) 50mm dia pipe. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

117

-

334776.78

... More
Supply and delivery at site Accessories for Single Phase pumpset like SS Groove Nipples,SSStuds & Nuts,Screw Clips &water proof Insulation Tape etc complete with ISI mark. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

4125

... More
Labour charges for Erection of outdoor type panel board and meter board units with all necessary materials and labour tools and equipments including providing cement concrete foundation bed etc., complete. as per specifications, with testing of as per instructions of engineer incharge of work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

1233.94

... More
Labour charges for Providing main connection from pole - PVC insulated sheathed steel wire cable as per IS 1554/ 1988 with latest amendments with ISI mark from KPTCL pole to meter board unit, with all necessary materials and labour tools and equipments, as per specifications, with testing of as per instructions of engineer incharge of work 3 1/2 *16sqmm. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

790

-

193550

... More
Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments 1x3x4 Sqmm. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

790

-

85320

... More
Providing main connection from pole PVC insulated sheathed steel wire cable in new trench as per IS 1554/ 1988 with latest amendments with ISI mark from KPTCL pole to meter board unit. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

30

-

3690

... More
Dismantling of existing structures like culverts,bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts complete as per specifications. iii) Dismantling Stone Masonry.B. Rubble stone masonry in cement mortar as per Direction of the Engineer incharge of the work The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

756

-

273316.68

... More
Dismantling of existing structures like culverts,bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lift and Lead of 1000m complete as per specification by II. by Mechanical means. a. cement Concrete grade M15 & M20as per Direction of the Engineer incharge of the work The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

49.5

-

37677.92

... More
Dismantling of existing structures like culverts,bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lift and Lead of 1000m complete as per specification by Manual means........C Reinforced Cement Concrete Grade M-20 and above as per Direction of the Engineer incharge of the work The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

209.49

-

342866

... More
Providing and laying in position R.C.C of design mix M25 with OPC cement @ 340kgs, with 20mm and down size graded granite metal coarse aggregates @0.70cum and fine aggregtes @ 0.47cum, with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation plinth and ground floor level for roof slabs, staircase, lintles, retaining walls, return walls, walls ( any thickness ) including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of machinery, curing, complete as per specifications. as per Direction of the Engineer incharge of the work The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

516

-

3306337.08

... More
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for Suspended floors, landings, balconies and likes, thickness upto 200mm including cost of all materials, labour complete as per specifications. for heights more than 3.50m from ground level as per Direction of the Engineer incharge of the work The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1861.55

-

766958.6

... More
Providing & Constructing granite / trap / basalt size stone masonry in Superstructure with Cement Mortar 1:6, edges of stones chistle dressed in courses not less than 15cms high, bond stones at 2 m. apart in each course including cost of materials, labour, scaffolding, curing complete as per specification. (KPWD SR 2018-19; Page - 25/ Item No. 5.1.13) & no 59. Rubble Stone (KPWD SR 2018-19; Page - III, Item No. 0330) with all lead and lift and as per the direction of engineer incharge of the work The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

114.75

-

536440.18

... More
Providing and finishing external walls in TWO COATS with WATERPROOF CEMENT PAINT of approved brand and shade to give an even shade after throughly brooming the surface to remove all dirt and loose powdered material, free from mortar drops and other foreign matter cost of materials, labour, complete as per specifications. do With Primeas per Direction of the Engineer incharge of the work The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1380

-

144982.8

... More
Loading and Unloading of Stone Boulder/Stone agrregate/Sand/Kankar/Moorum. KSRRB M100 -1 : Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip complete as per specification. MORTH -100/Chapter 1 (KPWD SR 2018-19; Page - 136 / Item No. 17.1) & KSRRB M100-4.1. Cost of Haulage Excluding Loading & Unloading as per Direction of the Engineer incharge of the work The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

369.75

-

33133.3

... More
Providing and laying in position plain cement concrete of mix M7.5 (1:4:8) with OPC cement @180 kgs, with 40mm and down size graded granite metal coarse aggregates @ 0.85 cum and fine aggregates@ 0.57 cum machine mixed, concrete laid in layers not exceeding 15cms thick, well compacted, in foundation, including cost of all materials, labour, HOM of machinery, curing complete as per specification. with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

6.19

-

32532.16

... More
Providing and laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 180kgs, with 20mm and down size graded granite metal coarse aggregates @0.85cum and fine aggregates @ 0.57cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

20.72

-

113302.55

... More
Providing & Constructing granite / trap / basalt size stone masonry in foundation with Cement Mortar 1:6, stone hammered dressed in courses not less than 20cms high, bond stones at two m. apart in each course including cost of materials, labour, curing complete as per specification. with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

5.4

-

25562.95

... More
Providing & Constructing granite / trap / basalt size stone masonry in Basement with Cement Mortar 1:6, edges of stones chistle dressed in courses not less than 15cms high, bond stones at two m. apart in each course including cost of materials, labour, curing complete as per specification.with all lead and lift and as per the direction of engineer incharge of the work The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

73.64

-

415881.16

... More
Providing and removing centering, shuttering, strutting, propping etc., for columns, pillars,post and struts, square/ rectangular /polygon in plan including cost of all materials, labour complete as per specification. with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

41.68

-

19576.26

... More
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for sides and soffit of beams, beam haunchings, cantilever girders, bressumers and lintels not exceeding 1m depth including cost of all materials, labour complete as per specification. with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

48.08

-

14460.54

... More
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for flat surface such as roofs, landings, balconies and likes, thickness upto 200 mm including cost of all materials, labour complete as per specifications. with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

3

-

2332.95

... More
Providing and laying in position Reinforced Cement Concrete of design Mix M-20 with OPC @ 27.20Kgs with 12mm and down size graded granite metal of coarse aggregates @ 0.05865 Cum. and fine aggregates @ 0.0391 Cum., with superplastisiser @ 0.225 Ltrs, machine mixed, well compacted for plain chajja of 8.5cms, average thickness, upto ground floor level, including cost of all materials, labour, HOM finishing, curing, complete but excluding cost of reinforcement as per specification Specification No. KBS 4.1, 4.6 as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

10

-

5108.8

... More
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for chajja, corbels etc., including edges including cost of all materials, labour complete as per Specifications. as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

10

-

3326.9

... More
Providing and fixing M.S.grill work for windows and ventilators weighing 21kg/sqm using M.S. flats, or M.S. square rods, or combination of M.S. flats and square rods as per approved design, drawing including cutting steel sections and welding the same to required pattern with a coat of red lead primer, cost of materials, fixtures, labour and HOM of machinery complete as per Specification No. KBS 7.12 as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

289.69

-

28346.17

... More
Providing, and Fixing in position aluminium windows and ventilators as per apprved drawings with sliding shutters using double track window frame section of size 61.85 x 31.75mm. With 1.2mm thick, bottom section weight 0.695 kg/m, sides and top sections 1.3mm thick weight 0.659kg/m: and shutter comprising top and bottom section of size 40mm x 18mm, 1.25mm thick 0.417kg/m, shutter outer side 40mmx26.7mm, 1.1mm thick weight 0.417kg/m, shutter interlock section 40mmx26.7mm, 1.1mm thick, weight 0.469kg/m. the shutters mounted on nylon rollers with approved quality of fixtures such as aluminium handles tower bolts etcc., and Providing and fixing 5.5mm thickplain glass for shutters fitted with rubber beading aluminium sections including cutting to reqiured length , joints mitred subdividing the frame tenonned and rivetted in the assembled frame stiffned with end clips at corners angles etc., and fixed to the walls, lintels, floor beams/cilles as the case may be with neccessary steel srews, rawls plugs, or teak wood gatties including cutting masonry or concrete and making good the original surface using cement mortar, aluminium sections pretreated for removal of any Specification No KBS -do- using aluminium section powdered coated to a minimum of 60-70 microns with exterior durable pure polyster grade powder of approoved quality. as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

5.94

-

26767.12

... More
Providing and applying Enamel paint on new Metal Surface brushing to give an even shade after cleaning oil, grease, dirt and other foreign matter, complete as per specification as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

33.94

-

3321.03

... More
Providing and constructing Load Bearing wall with solid Concrete blocks having block density not less than 1800kg/m3 having a minimum average compressive strength 5.0 Newton per sqmm Conforming to IS 2185 ( Part-1) 2005 and constructed with CM 1:4 as per IS 2572 :2005 including cost of all materials labour charges, scaffolding, curing, hire charges of machinaries etc., complete as per specifications.do with Solid Blocks of Size 400x200x200mm with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

40.84

-

38363.46

... More
Providing 18mm thick cement plaster in single coat with cement mortar 1:3 to brick masonry including rounding off corners wherever required smooth rendering, .:Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications. with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

27

-

7675.56

... More
Providing 15mm thick rough cement plaster in single coat with cement mortar 1:4 to wall masonry for base of dadooing works with sand of approved quality, Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications.with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

77.07

-

16273.33

... More
Providing 12mm thick cement plaster in single coat with cement mortar 1:3 to CEILING including rounding off corners wherever required smooth rendering, .:Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications.with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

20.16

-

4381.37

... More
Providing vitrified tiles 60 x 60cms of approved make, shade and size for flooring laid on a bed of 12mm thick cement mortar 1:3 mix, flush pointing with white cement using colour pigment, including cost of materials, labour, curing complete as per specification.with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

20.16

-

20266.44

... More
Providing skirting, dado, rises of steps with white colour glazed tiles of size 30X45cms 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications.with all lead and lift and as per the direction of engineer incharge of the work The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

66.11

-

86818.96

... More
Providing and fixing pull and push type rolling shutters of approved make out of 18 guage, 75mm wide cold rolled steel laths of convex corrugation, with side guides and bottom rail, with interlocking arrangements for steel laths by means of alternate clips, suspension shaft with High tension coil type springs two numbers, mounted on specially designed pipe shaft, with bracket plates, guide channels, ball bearing arrangements, for inside & outside locking with push & pull operations complete including pulling hooks, 4Nos. handles with all fittings and accessories, painted with a coat of red lead paint (without top cover) cost of materials, labour, HOM of machinery complete as per specifications. with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

10

-

26852.1

... More
Providing precast chequered mosaic tiles light shade using white cement for steps anf flooring, 20mm thick, using marble chips of 7 to 10 nominal size laid in floors, steps and landings on a bed of 12mm thick cement mortor 1:3 mix, and jointed with neat cement slury mixer with pigment to match the shade of tilescuring, rubing, polishing, oxalic acid wash, wax polish, including cost of materials, Specification as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

12

-

14498.28

... More
Providing and finishing external walls in two coats over one coat of 100 % acrylic siliconglazed primer with antifungal paint for top coat of approved brand and shade onwall surface to give an even shade after thoroughly brooming the surface to remove dirt & loose powdered material, free from mortar drops & other foreign matter, complete as per specification with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

36

-

6674.4

... More
Providing T.M.T Steel Reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping or welding required, tying with binding wire & anchoring to the adjoining members wherever necessary complete as per design (laps, hooks & wastage shall not be measured & paid) including cost of all materials, labour , HOM of machinery, complete as per specifications. with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1.08

-

78975.95

... More
Water Purification Plants: Supplying, installation and Commissioning of automatic water purification plant(RO+UF) with all accessories piping, product water tank on single phase power supply on turnkey/EPC basis as per the enclosed detailed technical specifications including cost of materials loading and unloading and as directed by the engineer in charge (ref-detailed specification enclosed seperatly before procurement h) 1000 LPH SS (annexure -HThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

520000

... More
Supplying and drawing 3 core flat PVC sheathed submersible pump cable manufactured with electrolytic grade copper with flexible copper with low resistance conductor confirming to IS:8130-1984 and virgin grade PVC insulation and powder coating extruded PVC sheathed suitable for working voltage upto 1100Volts as per IS-694:1990. 3C X 4.0 Sqmm.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

130

-

18746

... More
Supplying and Delivery of Submersible Pump Sets of 150mm dia Suitable for bore well and confirming to IS 8034 Specifications and its latest ammendments, 3-Phase, SS Bowl and impeller with low volt motor with testing as per instructions of Engineer incharge of work. 20 HP-155 LPM, 280 280 M, 20 stages. The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

78544.71

... More
Power Capacitor: Supply and Delivery of brand new best make capacitor conforming to IS:2834-1986 with latest amendments with ISI mark of required capacity tested and approved by KPTCL anthorities and erection, electrification and commissioning of the same at the location of the respective pumpsets. Supply & Delivery of best indigenous brand new MCB (Miniature Circutit Breaker) of required capacity as per IS:8828-1978 and its latest amendment with ISI mark 6/10/20/25/40 amps with sealble box with MCB 3 KVARThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

544.87

... More
Supplying 2 mm dia 2.5mm thick heavy gauge PVC conduit pipe with suitable size bends, metal/PVC junction boxes adhesive pase etc., and running before cocreting the slab. The conduit should be tiled to the reinforcement rods by using binding wires and unused ways of junction boxes and plpe ends should be covered using PVC end enclosuers. Run with 18SWGGI fish wire wherever necessaryThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

5

-

270

... More
Supplying of TPST with rewirable porcelain channels in SM enclosure. The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

1800

... More
Supplying and fixing polished wood board made of not less than 15 mm thick plan on both sides with planks made out of more than two pieces and fixing the same to the wall using wooden plugs, screws etcThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

2

-

180

... More
Supplying and wiring adopting loop system in existing PVC Conduit/casing caping using Copper PVC insulated multistrand 2x1.5 Sqmm copper wire with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/gang box. The other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet Short PointThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

200

... More
Supplying and wiring adopting loop system in existing PVC Conduit/casing caping using Copper PVC insulated multistrand 2x1.5 Sqmm copper wire with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/gang box. The other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet Medium PointThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

400

... More
Supplying 6 A flush/projected type socket and a 6Amps flush/projected type SP switch either surface/flush mounting in a existing gang box or a 4mm thick plastic sheet and fixing over a flush mounted wooden box and wiring using necessary capacity wires as requiredThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

132

... More
Wiring for lighting /power circuit using one of PVC insulated 1100V grade multis and Copper conductor single core cable in open or consealed system of wiring The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

25

-

512.5

... More
Supplying and fixing of 70-150 watts lamp holders 2 pinThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

3

-

318

... More
Supplying of LT UG cable having aluminium conductor PVC insulated. Sheathed. Galvanished. Steel wire/steel tape armoured cable with PVC outer sheathing 1.1KV class (conforming to IS 1554) Class-AThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

45

-

6750

... More
Lobour charges for laying of 1.1KV class UG cable when supplied departmentally/ agency in existing trench GI pipe/stoneware pipe/on wall/on pole as requiredThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

45

-

534.6

... More
Digging of trench of 0.6mtrs deepx0.5 mtrs wide refilling the required gorund level and consolidating etc., completeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

30

-

2280

... More
Supplying and fixing of class 'A' GI pipe on pole /wall/drain crossing with necessary clamping arrangement for UG cable of 1.1KV classThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

6

-

2010

... More
Supplying and fixing of heay duty cable glands suitable for UG cable of 1.1KV class metal only The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

84

... More
Supplying and fixing miniature circuit breakers on existing MCB disitribution boards using necessary fixing materials and wiring complete as requiredThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

909

... More
Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers etc., complete a) 32AmpsThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

174

... More
Supplying and fixing L.T. cast Iorn pot heads suitable for 1.1. KV class UG cable filled with necessary bitumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc., a) 16SqmmThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

350

... More
Supplying, fixing, wiring, earth electrode for gounding conduits, I.C cotouts and other equipments on the meter board using 40mm dia 2.90 thick GI pipe 2.5 mtr long buried in a pit… The pit should be filled with equal proprotion of salt and charcoal 150mm alround the pipe to complete depth. The connection from the to the conduit etc., is to be established through GI wire of size as per ISI specification 7.3.3. of IS 732 using 12mm dia bolts, nuts, washers and checkunts etc., the pipe shall have 16 through holes of 122mm dia The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

2999.7

... More
Supply of 40Watts LED Street light luminare with pressure dig cost aluminium housing body for optimal thermal Missiption lamp comparment compressing of anti of one clear diffuses with injection moulder The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

3360

... More
Supplying & fixing mm dia class A GI pipe bracket up to 2 mtrs long bent at suitable angle and fixing to this bracket 1x40/2x40 watts fluroscent tube street light fitting of all capacities of GI or CI or rail or RCC pole/ wall using suitable clamps. bolts. and nuts and wiring using suitable capacity wires completeThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

775

... More
Supplying heavy gauge PVC conduit pipe…… dia confirming to IS 2509 with suitable size benda, junction boxes, adhesive paste etc., and fixing using inverted wood plugs in case of RCC ceiling and RCC wall stone structure or rawl plugs in case of brick walls and cement plastering damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the work 25mm dia 2mm thickThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

25

-

1625

... More
Supplying 2 mm dia 2.5mm thick heavy gauge PVC conduit pipe with suitable size bends, metal/PVC junction boxes adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures. run with 18SWG GI fish wire wherever necessary. as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the work 25mm dia 2mm thickThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

25

-

1325

... More
Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of approved make etc.as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the work- 135x75x65mmThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

95

... More
Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of approved make etc.as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the work- 180x90x65mmThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

102

... More
Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of approved make etc.as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the work- 200x90x65mmThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

1

-

111

... More
Deep junction box 32mm deep junction box, as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

2

-

120

... More
Supplying and wiring adopting loop system in existing PVC Conduit / casing capping using copper PVC insulated multi strand 2x1.5Sqmm copper wire with C 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block complete for each outlet. -Short point upto 3 Mtr from tapping point to outlet via switchThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

2

-

400

... More
Supplying and wiring adopting loop system in existing PVC Conduit / casing capping using copper PVC insulated multi strand 2x1.5Sqmm copper wire with C 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block complete for each outlet. -Medium point above 3Mtr up to 6Mtr from tapping point to out let via switch The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

2

-

550

... More
Supplying and wiring adopting loop system in existing PVC Conduit / casing capping using copper PVC insulated multi strand 2x1.5Sqmm copper wire without switch, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the work. Short point upto 3Mtrfrom tapping point to outlet via switch boxThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

2

-

320

... More
Supplying and wiring adopting loop system in existing PVC Conduit / casing capping using copper PVC insulated multi strand 2x1.5Sqmm copper wire without switch, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the work. Medium point above 3Mtr up to 6Mtr from tapping point to out let via switch boxThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

2

-

500

... More
Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

5

-

875

... More
Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/dimmer/telephone socket etc on existing modular switch plate.. as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the work I.Using Group ''A'' materials 6Amps one way.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

2

-

140

... More
Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/dimmer/telephone socket etc on existing modular switch plate.. as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the work I.Using Group ''A'' materials 32Amps DP switchThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

2

-

364

... More
Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/dimmer/telephone socket etc on existing modular switch plate.. as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the work I.Using Group ''A'' materials 6/16Amps universal socketThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

2

-

324

... More
Supplying and fixing 32Amps security and energy saving DP switch with key tag suitable to operate on 230 Volts, 50Hz AC supply &completely wired on existing box.as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

2

-

1360

... More
Wiring for lighting /power circuit using one of FRIS PVC insulated 1100V grade multis and Copper conductor single core cable in open or consealed system of wiring as per the direction of engineer incharge of the work. 1 sqmm.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

60

-

840

... More
Wiring for lighting /power circuit using one of FRIS PVC insulated 1100V grade multis and Copper conductor single core cable in open or consealed system of wiring as per the direction of engineer incharge of the work. 1.5 sqmm.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

60

-

1230

... More
Wiring for lighting /power circuit using one of FRIS PVC insulated 1100V grade multis and Copper conductor single core cable in open or consealed system of wiring as per the direction of engineer incharge of the work. 6 sqmm.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

53

-

3710

... More
Supplying and fixing of PVC casing and capping on the wall or ceilng using necessary materials like bends, screws at an interval of 300mm …. Etc as required. as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

10

-

220

... More
Supplying PVC/GI flexible conduit pipe….mm dia fixing on surface over inverted wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300mm using NF screws and either end of the pipe terminated completely. as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

12

-

264

... More
Extra for supplying 4mm thick white plastic plate and covering for junction boxes of size 110mm conduit using necessary machine screws. as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

12

-

132

... More
Supplying a 50mm wooden plug, tapered from 50x50mm to 25x25mm and fixing by using binding wire before concreting a roof slap. as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

20

-

140

... More
KSRB13-9.1 : Providing and fixing to wall, ceiling and floor, high density polyethylene pipes 6.00 kgf/sq.cm working pressure 63 mm outside diameter with special flange, compression type fittings, wall clips, making good the wall, ceiling and floor, including cost of all materials, labour charges, HOM of equipments and testing complete as per specifications. Specification No.KBS 13.2.15.2 / 13.9 (KPWD SR 2018- 19; Page - 96 / Item No. 13.73.2) The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

70

-

4398.1

... More
Providing and fixing Chlorinated Poly Vinyl Chloride (CPVC) pipes conforming to IS 15778, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete. (internal work exposed on wall) -Do-25mm dia (KPWD SR 2018- 19; Page - 98 / Item No. 13.85.3) The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

50

-

10091.5

... More
KSRB 8.6-8:- Providing and Fixing on wall surface 4.0kg/sq.cm H.D.P.E Rain down water pipes 110mm outer dia. Apprved make and brand with necessary specils like shoes, bends and offsets fixed with iron clamps, wall plags, scews, including cost of materials, labour, complete as per specifications.(KPWD SR 2018- 19; Page - 49 / Item No. 8.19) The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

8

-

4218.88

... More
KSRB 13-11.1: Providing and placing on terrace, Polyethylene water storage tanks as IS:12701:1996 with manhole lid and suitable locking arrangements, making holes of suitable diameter for inlet, outlet & overflow pipes including cost of all materials, labour and transport charges, HOM of equipments and testing complete as per specification No:KBS 13.22,I-13.78(KPWD SR 2018- 19; Page - 96 / Item No. 13.78) FOR 1000 Litre capacityThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

2

-

14065.68

... More
KSRB13.23 Providing and fixing in position brass bib cock of approved quality 20mm nominal bore including cost of all materials, labour and HOM of equipments with all leads complete as per specifications. Specification No. KSRB 13.23 (KPWD SR 2018- 19; Page - 93/ Item No.13.24)The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

2

-

356.38

... More
KSRB13-6.3 Providing and fixing in position brass gate valve of 20mm nominal bore with C.I wheel of approved quality ( screwed end ) 32mm nominal bore including cost of all materials, labour and HOM of equipments with all leads complete as per specifications. Specification No. KSRB 13-6.3 (KPWD SR 2018- 19; Page - 93/ Item No.13.33)The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

2

-

692.16

... More
Providing and fixing of Aluminium Composite Panal of approved make and colour for wall cladding for straight Brick/RCC/Stone Walls & Coloumn/Beams With Necessary aluminium frame works at required level made out of 50x25x3mm C Section or equalent. The panel should consist of 2.5 mm thermoplastic core of antitoxic LDPE sandwiched between 0.25 skins thick aluminium sheet making a total panel thickness of 3mm. The surface will be finished wit PVDF based coating on topsides and services coating on reverse sides would be in polyster paint. The System shall be fixed using GI brackets, aluminium L Cleats and stainless steel bolts and nuts complete with spring washer and cap nuts and all othe necessary accessories , sealing shall be done using weather sealeant of dow corning 789 with neccessary rods etc., complete.. (KPWD SR 2018- 19; Page - 39 / I.No7.18)The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

9.6

-

38958.72

... More
Earthwork for levelling and lowering the ground manually ( other than foundation by mechanical means uoto 3.0 depth, including providing shoring, strutting. Bracing, removal of stumps and other deletiores matter, dressing of sides and bottom, filling back the excavated earth to the extent required and utilizing / transporting the remaining earth upto 1.0km lead. including cost oflabour and HoM as per drawing and technical specification The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

845.17

-

53102.03

... More
Providing and laying heavy duty cobble stones 60mm thick interlock pavers, using cement and course sand for manufacture of blocks of approved size, shape and colour with a minimum compressive strength of 281 kg per sqm over 50mm thick sand bed(average thickness) and compacting with plate vibrator having 3 tons compaction force thereby forcing part of sand underneath to come up in between joints, final compation of paver surface joints into its final level, including cost of materials, lobour and HOM complete as per specifcation as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

511

-

554225.49

... More
Earthwork excavation in all soil deposits and filling sides of foundation upto plinth in layers not exceeding 20 cms. in depth, compacting each deposited layer by ramming after watering with all lead & Lift including cost of all labour complete as per specifications. as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

14.4

-

5977.3

... More
Providing and fixing Pre cast solid concrete kerb stones made out of CC 1:2:4 and finished with CM 1:3 plastering and finishing cutting etc., complete. of size 450 x 200 x 400 mm. as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

356

-

165006

... More
Providing and applying floor painting with ready mix paint in two coats (excluding priming coat) on new concrete / asbestos cement sheet / plastered surfaces brushing to give an even shade after preparing the surface after thoroughly cleaning of oil, dirt, dust other foreign matter, and sand papering including cost of materials, labour, complete as per specifications. as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

96

-

7020.48

... More
Supply and fixing polished grey granite slab benches of size 5 fet width of seating slab with bottom slab of 75 mm th. With 1.5 feet width with two stands strong base with back slab (support) machine cutting top slab mirror polish with 50 mm th. with 1.5 feet depth side slab of 100 mm th. 2.5 feet height. including loading & unloading and with all lead and lift etc., complete and executing the work as per the direction of engineer incharge of the work. The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

5

-

54332.5

... More
Loading and Unloading of Stone Boulder/Stone agrregate/Sand/Kankar/Moorum. KSRRB M100 -1 : Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip complete as per specification. MORTH -100/Chapter 1 Cost of Haulage Excluding Loading & Unloading The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

845.17

-

95757.76

... More
Providing and fixing M.S. Gate as per Chief Architect Drawing, using 50mm x 50mm 14 guage M.S. hollow pipe frame work bent to ornamental shape as shown in the drawing and 35mm x 6mm and 16 x 16mm Square rods for verticals alternatively spaced at 4cms c/c in two halves and 40mmx6mm M.S. flats for horizontal member and at the top cast iron spikes are provided at alternate vertical members as shown in the drawing etc., complete. All the steel surface should be thoroughly cleaned free of rust and painted with anti corrosive paint (shop paint) etc., complete. The work includes cost of all materials, labour charges for all items of work, hire charges for welding, cutting and grinding equipment, and electricity charges, with lead and lift, loading and unloading charges, etc., complete as per specifiocation. complete as per specifcation and direction of Engineer in Charge. as per specification, as per specification with all lead and lift and as per the direction of engineer incharge of the workThe rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

15

-

46535.4

... More
Providing and laying in position reinforced cement concrete of Design mix M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.460 cum, with super plasticisers @ 3 liters confirming to is 9103-1999 reafirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness) including attached pilasters, columnspillars, posts, struts, buttresses, bed blocks, anchor blocks & plinths etc., including cost of all materials, labour, HOM of machinery, curing, complete but excluding cost of reinforcement as per specifications.With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

12.58

-

73325.93

... More
Disposing of earth out side the yard, with all lead and lift charge as per the direction by the engineer incharge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

272.43

-

41880.66

... More
Providing wire mesh 50mm x 50mm. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

8

-

2298.96

... More
Providing and fixing to wall, ceiling and floor unplasticised PVC 6.00 kgs/sqcm working pressure with pipe fittings, wall clips etc., and making good the wall, ceiling and floor for sanitary pipelines including cost of all materials, labour charges, HOM of acquirements and testing complete as per specifications. - 110mm dia. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

180

-

80463.6

... More
Dismantling size stone masonry in clay mortar and stacking the size stone within a radius of 50m and removing the debris out side the yard. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

55.26

-

15424.72

... More
KSRB 5.3-3 : Providing and constructing granite / trap / basalt size stone masonry in basement with cement mortar 1:6, edges of stones chistle dressed in courses not less than 15 cms high, bond stones at two m. apart in each course including cost of materials, labour, curing complete as per specifications. By Using available Stones.With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

38.68

-

199473.15

... More
KSRB 4-1.6 ; Providing and laying in position plain cement concrete of mix 1:2:4 with cement @ 240kgs, with 20mm and down size graded granite metal coarse aggregates @ 0.69 cum and fine aggregtes @ 0.459cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation, plinth and cills, ncluding cost of all materials, labour, HOM of machinery, curing complete as per specifications.With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

13.82

-

77180

... More
KSRB 15.1.1 Providing flush pointing to square rubble, course or uncoursed stone masonry with cement mortar 1:3, 20mm deep, after raking joints to depth of 20mm nicely lining, including cost of materials, labour, curing complete as per specifications. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

245.6

-

35668.49

... More
Disposing of earth out side the yard, with all lead and lift charge as per the direction by the engineer incharge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

55.26

-

6602.46

... More
Disposing of earth out side the yard, with all lead and lift charge as per the direction by the engineer incharge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

180.12

-

21659.43

... More
Earthwork excavation for foundation of buildings, water supply, sanitary lines and electrical conduits either in pits or in trenches 1.5m and above in width, in hard soil not exceeding 1.5 m. in depth including dressing the bottom and sides of pits and trenches, stacking the excavated soil clear from edges of excavation with lead upto 50 m. after breaking of clods complete as per specifications. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

180.12

-

83300.1

... More
Providing and laying in position plain cement concrete of mix M20 with OPC cement @ 300kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.43cum, with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation, plinth and cills, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

15.41

-

84567.61

... More
Providing laying reinforced cement concrete for side drains using M20 nominal mix concretge with OPC at 300kgs with 20mm and down size granite metal coarse aggarefataes at 0.69cum and fine aggregataes at 0.43cum, machine mixed, well compactd for walls and bottom including centering shuttering, cost of mataerials, HOM of machinery,curing etc., complete excluding cost of steel as per MORTH specification No. 1500,1700,2200 including cost of materials, labour HOM complete as per specification - wall & bottom thickness 15cm With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

52.14

-

358207.01

... More
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for flat surface such as suspended floors, roofs, landings, balconies and likes, thickness above 200 mm including cost of all materials, labour complete as per Specification.With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

314.28

-

142431.7

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts complete as per specifications. i) Lime /Cement Concrete. I. By Manual Means :B. Cement Concrete Grade M-15 & M-20. MORTH Specification No. 202.With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

26.78

-

15363.95

... More
Removing and resetting of footpath slab / Cobble Stones. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

429

-

87048.39

... More
Removing and resetting of kerb stones. With all lead and lift charge as per the direction by the engineer in charge of the work.The rates inclusive of cost of all materials, labour, HOM of all machinaries and equipements includung all lead and lift charges etc. complete and work should be carried out as per specifications and as per the directions of engineer-in-charge of the work.

195

-

19884.15



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.