Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Agricultural Produce Market Committee - APMC Tender

Civil And Construction
Building Construction
Construction Works
Opening Date6 Sep 2022
Closing Date10 Oct 2022
Tender Amount₹ 97,27,941 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
KSRB 2.8 :Providing and Filling in foundations with granite/ trap broken metal 100mm. and down size, with approved sand Including hand packing, ramming watering. Including cost of all materials and labour with lead and lift .complete as per specifications. specification. No.KBS 2.10.2 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

36.98

-

85587.99

... More
KSRB 4-1.3 Providing and laying in position plain cement concrete of Mix 1:4:8 with OPC@ 180kgs, with 40mm and down size graded granite metal coarse aggregates @0.85cum and fine aggregates @ 0.57cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation, including cost of all materials, labour, HOM curing complete as per specifications. Specification No. KBS 4.1, 4.2 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

66.69

-

391745.06

... More
KSRB 2.5 : Earthwork excavation in all soil deposits and filling sides of foundation upto plinth in layers not exceeding 20cms. in depth, compacting each deposited layer by ramming after watering with all lead and lift including cost of all labour complete as per specifications. specification. No. KBS 2.9.9 / 2.9.10.1 / 2.1.1 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

409.5

-

178230.78

... More
4.10 KSRB 4.2.1 Providing and laying in position reinforced cement concrete of Design Mix M25 with OPC @ 340kgs, with 20mm and down size graded granite metal coarse aggregates @0.70 cum and fine aggregtes@0.47cum, with super plasticisers @ 3 liters confirming to IS 9103-1999 reafirmed-2008 at machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness) including attached pilasters, columns pillars, posts, struts, buttresses, bed blocks, anchor blocks & plinths etc., including cost of all materials, abour, HOM curing, complete but excluding cost of reinforcement as per specifications. Specification No. KBS 4.1, 4.6 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

101.95

-

683978.47

... More
4.10 KSRB 4.2.1 Providing and laying in position reinforced cement concrete of Design Mix M25 with OPC @ 340kgs, with 20mm and down size graded granite metal coarse aggregates @0.70 cum and fine aggregtes0.47cum, with super plasticisers @ 3 liters confirming to IS 9103-1999 reafirmed-2008 at machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness) including attached pilasters, columns pillars, posts, struts, buttresses, bed blocks, anchor blocks & plinths etc., including cost of all materials, abour, HOM curing, complete but excluding cost of reinforcement as per specifications. Specification No. KBS 4.1, 4.6 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

2.58

-

17476.3

... More
KSRB 4-2.3 : Providing and laying in position reinforced cement concrete of design mix M-25 with OPC cement @ 340kgs, with 20mm and down size graded granite metal coarse aggregates @0.70cum and fine aggregtes @ 0.47cum,with super plasticisers @3lts confirming to IS9103-1999 Reaffirmed-2008,machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation plinth and ground floor level for roof slabs, staircase, lintles, beams retaining walls, return walls, walls ( any thickness ) including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of machinery, curing, complete but excluding cost of reinforcement as per specifications. Specification No. KBS 4.1, 4.6 (PWD SR 18-19 Page No.14 Item No. 4.12) ( Ground Floor) The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

81.46

-

567010.48

... More
KSRB 4.2.10 : Providing and laying in position reinforced cement concrete of design mix M20 with OPC @ 24kgs, with 12mm and down size graded granite metal coarse aggregates @0.05175cum and fine aggregtes @ 0.0345cum, with superplastisiser @0.225lts, machine mixed, well compacted for plain chajja of 7.5 cms. average thickness, upto ground floor level, including cost of all materials, labour, HOM finishing, curing, complete but excluding cost of reinforcement as per specifications. Specification No. KBS 4.1, 4.6 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

60

-

30326.4

... More
KSRB 6-1.3 : Providing and constructing burnt brick masonry with CM 1:6 for basement and superstructure with approved quality of non-modular bricks of standard size of class designation 3.5Newton per sqmm with cement mortar1:6 including cost of materials, labour charges, scaffolding, curing complete as per specifications. Specification No. KBS 6.2 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

68.35

-

456711.97

... More
KSRB 6-1.3 : Providing and constructing burnt brick masonry with CM 1:6 for basement and superstructure with approved quality of non-modular bricks of standard size of class designation 3.5Newton per sqmm with cement mortar1:6 including cost of materials, labour charges, scaffolding, curing complete as per specifications. Specification No. KBS 6.2 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

14.84

-

92705.48

... More
KSRB 4-1.5 Providing and laying in position plain cement concrete of Mix M20 with OPC @ 300kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes@0.43cum, machine mixed, concrete laid in layers not exceeding 15 oms thick well compacted, in foundation, plinth and cills, including cost of all materials, labour, HOM curing complete as per specifications Specification No. KBS 4.1, 4.2 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

17.5

-

107654.4

... More
KSRB 4.9.2 Providing T.M.T steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and/or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM complete as per specifications. Specification No. KBS 4.6.3 TMT bars Fe 500 (PWD SR 18-19 Page No. 18 Item No. 4.46.2) (Ground floor) The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

23.5

-

1784391.66

... More
KSRB 4.9.2 Providing T.M.T steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and/or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM complete as per specifications. Specification No. KBS 4.6.3 TMT bars Fe 500,Lift charges for steel of all diameters for additional floors over ground floor per floor height of 3.5 m. or part thereof cost of labour, complete as per specifications.( First floor) The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

0.5

-

38369.7

... More
KSRB 4-6.1 : Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for foundations, footings, bases of columns for mass concrete including cost of all materials, labour complete as per specificaitons. Specification No. KBS 4.6.2 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

86.4

-

24074.5

... More
KSRB 4-6.5 : Providing and removing centering, shuttering, strutting, propping etc.,and removal of form work for columns, pillars, post and struts, square / rectangular/ polygon in plan including cost of all materials, labour complete as per specifications. Specification No. KBS 4.6.2 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

389.23

-

191687.99

... More
KSRB 4-6.7 :Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for sides and soffits of beams, beam haunchings, cantilever girders, bressumers and lintels not exceeding 1m in depth including cost of all materials, labour complete as per specifications. Specification No. KBS 4.6.2 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

756.57

-

238591.92

... More
KSRB 4-6.10 :Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for chajjas, corbels etc., including edges including cost of all materials, labour complete as per specifications. Specification No. KBS 4.6.2 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

60

-

20930.4

... More
KSRB 4-6.2 : Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for suspended floors, landings, balconies and likes, thickness upto 200 mm including cost of all materials, labour complete as per specificaitons for heights more than 3.50m from ground level. Specification No. KBS 4.6.2 0 to 5 mts The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

417.17

-

180217.44

... More
KSRB 4-6.11 :Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for Stairs (excluding landing) except spiral staircase including cost of all materials, labour complete as per specificaiton. Specification No. KBS 4.6.2 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

36.78

-

20695.37

... More
KSRB 4-5 : Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja, facia, backing to cup boards including cost of all materials, labour, providing and removing form work HOM of machineries, curing, complete as per specifications. Specification No. KBS (Ground floor) The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

37.61

-

44558.82

... More
KSRB 7.5 : Providing and fixing pull and push type rolling shutters of approved make out of 18 guage, 75mm wide cold rolled steel laths of convex corrugation, with side guides and bottom rail, with interlocking arrangements for steel laths by means of alternate clips, suspension shaft with High tension coil type springs two numbers, mounted on specially designed pipe shaft, with bracket plates, guide channels, ball bearing arrangements, for inside & outside locking with push & pull operations complete including pulling hooks, 4Nos. handles with all fittings and accessories, painted with a coat of red lead paint (without top cover) cost of materials, labour, HOM of machinery complete as per specifications. Shutter size 3mx2.8 m. Specification No. KBS 7.10 / 7.12 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

131.1

-

369119.92

... More
KSRB 7.6 : Providing and fixing top covers made out of 20 guage M.S. sheet over pull and push rolling shutters bent to shape including cost of red lead primer coat of painting , materials, labour, HOM of machinery complete as per specifications. Specification No. KBS 7.10.6 / 7.12 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

38

-

21381.84

... More
KSRB 7.1 : Providing and fixing in position collapsible steel shutters with single or double leaf with vertical channel 20mmx10mmx2mm braced with flat iron diagonals 20mmx5mm size, with top and bottom rails of T iron sections of 40x40x6 mm with 38mm dia steel pulleys complete with bolt and nuts, locking arrangements, stoppers, handles on both sides with 7.5cms openings at 10 cms. c to c applying a priming coat of red lead paint. cost of materials, labour, HOM of machinery complete as per specifications. size of gate 2.4mx1.4m. Specification No. KBS 7.7 / 7.12 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

9.9

-

57747.49

... More
KSRB 7.8 : Providing and fixing in position in cement concrete 1:3:6 steel glazed windows and ventilators side hung/top hung 2/3 openable 1/3 fixed as per approved drawings using Z angles of 25x33x3mm, weighing 1.419 kg/m both for outer and inner frames and central mullion section of size 25x46x3mm, weighing 2.28kg/m all duly providing T section 19x19x3mm weighing 0.839 kg/m for glazing of windows, not more than 34 cms. c to c including providing and fixing 4mm. thick reeded glass with teakwood beading of required size, all steel sections should confirm to I.S 7452:1990, 4nos. of holdfasts of approved size, section should be cut to length welded and grinded electrically subdividing frames of unit shall be tenonned and revetted into the frames electrically. All the steel surface shall be throughly cleaned free of rust and painted with one coat of anti-corrosive paint and finishing two coats of ready mix paint of approved colour and make including cost of materials, fixtures, labour charges and HOM of machinery complete as per specifications. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

7.92

-

29176.33

... More
KSRB15-3.11 : Providing 20mm thick cement plaster in single coat with cement mortar 1:4, to stone masonry & concrete surface including rounding off corners wherever required smooth rendering,: Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications. (ground floor ) The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

510.13

-

152059.55

... More
KSRB15-3.11 : Providing 20mm thick cement plaster in single coat with cement mortar 1:4, to stone masonry & concrete surface including rounding off corners wherever required smooth rendering,: Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications. (First floor ) The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

55.14

-

17150.75

... More
KSRB15-3.8 : Providing 18mm thick cement plaster in single coat with cement mortar 1:4, to brick masonry including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications. ( Ground floor) The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

710.28

-

202515.03

... More
KSRB15-3.8 : Providing 18mm thick cement plaster in single coat with cement mortar 1:4, to brick masonry including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications.( First floor) The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

51

-

14871.6

... More
KSRB15-3-13 : Providing 12mm thick cement plaster in single coat with cement mortar 1:3, to ceiling including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications. ( Ground floor) The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

521.05

-

133930.69

... More
KSRB 14.10-3: Providing flooring with 20mm thick polished Cadapa slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, including cost of materials, labour, curing, polishing complete as per specifications. Specification No. KBS (ground floor ) The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

350.4

-

489691.01

... More
Providing and finishing external walls in two coats over one coat 100% acrylic silicon glazed primer with antifungal paint for top coat of approved brand and shade to give an even shade after thoroughly brooming the surface to remove all dirt and loose powdered material, free from mortar drops and other foreign matter cost of materials, labour, complete as per specifications. ( Ground floor) The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

585.34

-

113790.1

... More
Providing and finishing external walls in two coats over one coat 100% acrylic silicon glazed primer with antifungal paint for top coat of approved brand and shade to give an even shade after thoroughly brooming the surface to remove all dirt and loose powdered material, free from mortar drops and other foreign matter cost of materials, labour, complete as per specifications. ( First floor) The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

55.14

-

11195.63

... More
Providing applying two coats of wall putty to inside plastered walls and ceiling using white cement putty. Scrapping and levelling the surface using steel blade and preparing the surface even and smooth by using different grade sand papers, including cost of all materials, cost of labour and scaffolding etc., complete as per the specification. ( Ground fllor & First floor) The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

1162.33

-

97914.68

... More
KSRB 15-15.1 : Providing and applying painting in two coats with plastic emulsion paint of approved brand on wall surface to give an even approved shade after thoroughly brushing the surface, free from mortar drops and other foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour, complete as per specifications. - with primer The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

1162.33

-

112978.48

... More
KSRRBM800-9. Painting New Letter and Figures of any Shade with synthetic enamel paint black or any other approved colour to give an even shade complete as per specifications. (“i) Hindi ( Matras commas and the like not to be measured and paid for half letter shall be counted as half) “ MORTH Specification No. 803 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

10000

-

10800

... More
KSRB 15-18.2 : Providing and applying enamel metal paint two coats (excluding priming coat ) over new steel or other metal surface brushing to give an even shade after cleaning oil, grease, dirt and other foreign matter, including cost of materials, labour, complete as per specifications. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

296.04

-

30373.7

... More
KSRRB M300-53. Construction of embankment with approved material Gravel/Murrum with all lifts and leads, transporting to site, spreading,gradingto required slope and compacting to meet requirement Table 300-2 complete as per specifications. (which includes cost of gravel/murrum,watering charges & compaction by vibratory roller) MORTH Specification No.305 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

496

-

251233.92

... More
Construction of granular sub-base Grading-V as Sub-base and drainage layer by providing coarse graded crushed stone aggregates of granite/trap/ basalt material, mixing by mix in place method by rotavator at OMC, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the 98 % proctor density, complete as per specifications.Clause 401 of MORTH V Revision. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

39.6

-

85022.78

... More
KSRB 14.6-2 :Providing and laying heavy duty cobble stones 75mm thick interlock pavers, using cement and course sand for manufacture of blocks of approved size, shape and colour with a minimum compressive strength of 281 kg per sqm over 50mm thick sand bed (average thickness ) and compacting with plate vibrator having 3 tons compaction force thereby forcing part of sand underneath to come up in between joints, final compaction of paver surface joints into its final level, including cost of materials, labour and HOM of machineries complete as per specifications. Specification No. KBS The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

220

-

265399.2

... More
Fabrication supplying and erecting M.S. tubular trusses of all spans as per approved drawing & design with prefabricated steel applications using quality material and are durable, reliable and corrosion and abrasion resistant. Welding shall confirm to latest structural welding code. Quality shall be on various parameters like shape, size, design gauge and polish. The entire trusses is anchored in RCC column by using 4 nos of M.S. anchor bolts at each support with 10mm thick base plate and shoe plate. The work includes cutting,traightening,placing in position of M.S. pipes and welding wherever necessary and applying one coat of redoxide primer coat to all the members including cost of all materials, labour charges, and hire charges of machineries for cutting, welding, grinding and erection equipments, with all lead and lift, transportation, letc., complete as per specification The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

127.33

-

15126.8

... More
PROVIDING TRAPEZOIDAL PROFILED SHEET Providing and installing of pre painted Galvolume iron Trapezoidal profiled sheet of approved make 1060 mm width (1000 mm cover width), 28-30 mm crest height with crest distance of 200 mm c/c with 2 ribs at the centre for stiffening. The total coated thickness (TCT) of the sheet will be 0.47 mm +/- 0.02 mm tolerance Zinc-Alu Alloy coating AZ150 gsm as per ASTM 1397/A755-550 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 20-22 microns using self drilling/self tapping screws of 25 mm length, to be fixed over the existing purlins, rafters, channels and trusses The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

27.68

-

23018.69

... More
Providing and fixing 304 - grade stainless steel hand rails of 14-gauge pipes for Ramps or Staircase are made out of stainless steel hallow pipes, using 50mm dia for verticals @1.60 mtr c/c are fixed to the ramps or steps by drilling with bolts and 100mm dia MS base plates 10mm gauge for fixing of Vertical pipes 4 - Nos anchor bolts & 40mm dia pipes are fixed horizontally for 2-rows top, one pipes are fixed with vertical pipes another one are fixed with elbows and 25mm dia pipes are fixed horizontally for 2-rows below top measure @ equal intervals including cutting, welding, bending wherever necessary with suitable caps @ tops, bottoms & corners finishing with mat / shining etc., complete including cost and conveyance of all materials, labour for all items of work, HOM of equipment with all lead and lift, loading and unloading, transportation charges and all other incidental charges etc., complete as per specification and directions of the Engineer-in-charge of the work. Ramps or Staircase for physically challenged. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

7.56

-

43910.29

... More
KSRRB 300-1. Earthwork excavation by mechanical means for roads, drains & similar works in all types soils involving an average horizontal through upto 2 mtrs and an average lift upto 1.5 mtr to 2 mtr excavated surface levelled and sides neatly dressed, the dispose earth to be leveled neatly after breaking of clods complete as per specifications. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

200

-

6480

... More
KSRRB M2900- PCC M10 in Foundation KSRRB M2900-1. Plain cement concrete M10 mix with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 408 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

15

-

71992.8

... More
Providing and laying plain/reinforced cement concrete for side drains using M20 nominal mix concrete with OPC cement at 300 kgs. with 20mm and down size granite metal coarse aggregates at 0.69 cum and fine aggregates at 0.43 cum machine mixed, well compacted for walls and bottom including centering, shuttering, cost of materials, HOM of machinery, curing etc., complete excluding cost of steel as per MORTH specification No. 1500,1700, 2200.including cost of all materials, labour, HOM complete as per specifications. Wall & bottom thickness 15cm The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

43.5

-

331819.74

... More
KSRRB M2100-17.2. Plain / Reinforced Cement Concrete idesign mix M25 with OPC cement @ 340kgs, with 20mm and down size graded granite metal coarse aggregates @0.70cum and fine aggregates @ 0.47cum, with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008,Open Foundation complete as per Drawing and Technical Specification Case - II : With Batching Plant, Transit Mixer and Concrete Pump MORTH Specification No. 1500,1700 & 2100 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

18.75

-

110038.5

... More
KSRRB M2200-6. Providing T. M.T. steel reinforcement for R.C.C. work including straightening, cutting, bending, hooking, placing in position, lapping and/or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per disign (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM complete as per specification. MORTH Specification No.1600 & 2200 TMT Bars Fe 500 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

5.7

-

415794.71

... More
KSRRB 300-58 : Compaction of original ground by mechanical means including filling in depression occurring during rolling including cost of all labour, HOM of machinery complete as per specifications.MORTH Chapter 3The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

250

-

1620

... More
KSRRB M300-53. Construction of embankment with approved material Gravel/Murrum with all lifts and leads, transporting to site, spreading,grading to required slope and compacting to meet requirement Table 300-2 complete as per specifications. includes cost of gravel/murrum,watering charges & compaction by vibratory roller to 95% of modified prodtors density MORTH Specification No.305 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

37.5

-

18994.5

... More
Construction of granular sub-base Grading-V as Sub-base and drainage layer by providing coarse graded crushed stone aggregates of granite/trap/ basalt material, mixing by mix in place method by rotavator at OMC, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the 98 % proctor density, complete as per specifications. Clause 401 of MORTH V Revision. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

37.5

-

80514

... More
KSRRB M600-1. Providing and Constructing dry lean cement concrete h1 mix CC 1:5:10 base with OPC 25mm and down size graded granite metal coarse aggregate at 0.86cum and fine aggregates @o.58cum over a prepared sub-base, coarse and fine aggregate conforming to IS: 383-2016, aggregate cement ratio not to exceed 15:1, Aggregate gradation after blending to be as per Table 600-1,optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver, compacting with 8-10 tonnes vibratory roller, finishing and curing complete as per specifications. Clause 601of MORTH V Revision and IS 456 Table-5 with OPC at 150 kg/cum and coarse aggregate 0.86cum, fine aggregate 0.58cum using Concrete Batch mix Plant at 75 cum/hr capacity with fixed form paver The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

25

-

108945

... More
Constructing un-reinforced, plain cement concrete for pavements using Grade concrete M30 over a prepared base with OPC coarse aggregate at 0.69 cum, fine aggregates at 0.46 cum,Coarse and fine aggregate conforming to IS:383-2016, with Superplastizer at 3 Its conforming to IS 9103-2008. mixed in a concrete mixer of not less than 0.6 cum capacity and appropriate weigh batcher as per approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing). & Spreading the concrete with shovels, rackers compacted using needle, screed and plate vibrator and finished with floaters in a continuous operation including provision of contraction, expansion, construction and longitudinal joints,including groove cutting charges, joint filler, separation membrane of impermiable plastic sheet of 125 micron, sealant primer, joint sealant, admixtures as approved, curing compound, finishing to lines and grades, textured with texturing machine, and curing including cost of all materials, labour,hire charges of machineries,all lead & lift charges etc., complete as per specifications. with OPC at 360 kg/cum and coarse aggregate 0.69cum, fine aggregate 0.46cum The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

62.5

-

346072.5

... More
Vaccum de-watering with vaccum pump and suction mat and compaction with skin floater clubbed with floating disc including cost of generator, HOM of machinery, Screed Vibratory, Power Floater, blade and disc etc., with all lead and lift. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

250

-

18360

... More
Open Conduit : Supplying heavy gauge PVC conduit pipe 19/20mm dia 2mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc., and fixing using inverted wood plugs in case of RCC ceiling and RCC wall / stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

350

-

17500

... More
Concealed Conduit : Supplying heavy gauge PVC conduit pipe 25mm dia 2mm thick confirming to IS 2509 with suitable size bends, metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

400

-

21200

... More
Groove cutting. Supplying heavy gauge PVC Conduit Pipe 25mmdia 2mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

400

-

21600

... More
Supplying PVC/GI flexible conduit pipe 25mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300mm using NF screws and on either end of the pipe terminated completely. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

50

-

1400

... More
Supplying and flush mounting 1-3 Way powder coated/galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ( stair case). The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

11

-

1045

... More
Supplying and flush mounting 4-5 Way powder coated/galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ( stair case). The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

1

-

105

... More
Supplying and flush mounting 6 Way powder coated/galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

4

-

500

... More
Supplying and flush mounting 10-12 Way powder coated/galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

12

-

1980

... More
Supplying and fixing 1 to 3 Module superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

11

-

1210

... More
Supplying and fixing 4 Moudule superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

1

-

125

... More
Supplying and fixing 6 Moudule superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

4

-

700

... More
Supplying and fixing 10-12 Moudule superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

12

-

2760

... More
Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 1100V grade, copper conductor flexible multistrand FRLS PVC insulate, 2x1.5 sqmmcable confirming to the GTP, with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point up to 3Mtr from tapping point to out let via switch. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

13

-

2600

... More
Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 1100V grade, copper conductor flexible multistrand FRLS PVC insulate, 2x1.5 sqmmcable confirming to the GTP, with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3Mtr up to 6Mtr from tapping point to out let via switch The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

10

-

2750

... More
Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 1100V grade, copper conductor flexible multistrand FRLS PVC insulate, 2x1.5 sqmmcable confirming to the GTP, with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Long point above 6Mtr up to 10Mtr from tapping point to out let via switch. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

37

-

14800

... More
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100v grade, multistrand Copper with low conductor resistance single core wirein open or concealed system of wiring with specified IS-694;1990 & confirming to GTP of GROUP-A 1.5 SQMM. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

700

-

14350

... More
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100v grade, multistrand Copper with low conductor resistance single core wirein open or concealed system of wiring with specified IS-694;1990 & confirming to GTP of GROUP-A 2.5 SQMM. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

1000

-

32000

... More
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100v grade, multistrand Copper with low conductor resistance single core wirein open or concealed system of wiring with specified IS-694;1990 & confirming to GTP of GROUP-A 4 SQMM. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

500

-

22500

... More
Supplying and fixing of 6 Amps one way modular switch on existing modular switch plate.as per IS3854and IS 1293. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

14

-

980

... More
Supplying and fixing of modular 6 Amps 3 way socket on existing modular switch plate.as per IS3854and IS 1293. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

14

-

1470

... More
Supplying and fixing of modular 6/16 Amps universal socket on existing modular switch plate.as per IS3854and IS 1293. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

14

-

2268

... More
Supplying and fixing of 16 Amps one way modular switch on existing modular switch plate.as per IS3854and IS 1293 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

14

-

1610

... More
Supplying and fixing of Stepped Fan Regulator. on existing modular switch plate.as per IS3854and IS 1293. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

14

-

4060

... More
Extra for supplying 4mm thick white plastic plate and covering for junction boxes of size …110…mm conduit using necessary machine screws. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

80

-

880

... More
Supplying & Fixing of 70-150 Watts lamp holder 2 Pin. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

17

-

1802

... More
Supplying of 1 x 4 ' feet - PVC Batten with integrated LED tube 20/22Watts with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI > 80. Power Input: 220-240V @ 50/60Hz & Power factor >0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

28

-

10500

... More
Fixing all types and all capacities of fluorescent/false ceiling/spot light/CFL /LED fittings indoor on the wall / ceiling/ rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. On wall / ceiling / Raffer / Girders. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

28

-

3080

... More
supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc. for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system. 48" Sweep (1200mm) Regular model. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

14

-

29260

... More
Fixing a ceiling/wall mounting fan of all capacities and all types with necessary clamps and S hook made out of 15mm dia MS rod, with 5 amps ceiling rose of approved quality with necessary length of 23 / 0.0076 inch PVC insulated twin twisted wire of approved quality with regulator mounted on a suitable size wooden board and wired complete. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

14

-

3640

... More
Supplying and fixing 4 way SP & N regular MCB distribution boards on wall/wood board/flush mounting using required clamps, bolts, nuts etc.. With provisions for fixing suitable type capacity MCB's single phase /3 phase/single door with powder coated painting. Made out of 14 SWG MS encloure. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

12

-

9324

... More
Supplying and fixing 6-32 Amps SP miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve , indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required.confirming to IEC 60898. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

24

-

10416

... More
Supplying and fixing 6-32 Amps DP miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve , indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required.confirming to IEC 60898. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

12

-

10908

... More
Fabricating,supplying comprising of 12 no's of single phase Energy meter bank panel : 170000 sqcm of MS sheet 16 SWG,1 no of 0-600v volt meter, 1 no of 0-30amps Ammeter, 1 nof LED panel, 12 no' of Single Phase electronic energy meter, 12 nos of DP 32A MCB, 35000 sqcm of Hylum sheet, 12 mtrs of 50x50x6mm Angle iron, 0.50 mtrs of 100 amps bus bar, 1 no of 4 pole 160amps MCCB, 4pole 63A Load Change over swicth etc The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

1

-

111752

... More
supplying, fixing , wiring, earth electrode for grounding conduits. I.C, cutouts and other equipment's on the meter board using 40mm dia 2.90 mm thick GI pipe 2.5 mtr long buired in a pit… The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc. is to be established through GI wire of size as per ISI specification 7.3.3 of IS 732 using 12mm dia bolts, nuts, washers and check nuts etc. the pipe shall have 16 through holes of 122 mm dia. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

4

-

11998.8

... More
Supplying of 4 core 16 sqmm, 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated, PVC extruded Inner sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness in average +5% and resistivity 14 Ohms/Kms (Max) as per IS-3975. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

100

-

15000

... More
Labour charges for laying of 1.1 KV class UG cable in existing trench GI pipe/stoneware pipe/on wall/on pole as required. 6sqmm to 16sqmm. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

100

-

1188

... More
Digging of trench of 0.6 m deepx0.50 mtr wide in hard soil refilling the trench to the required ground level and consolidating etc complete. In soil (hard). The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

80

-

8160

... More
Supplying and fixing of class A 40mm (medium duty) GI pipe of wall thickness not less than 3.25mm on pole/wall/drain crossing with necessary clamping arrangements for UG cable of 1.1 KV. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

10

-

3350

... More
supplying and fixing LT cast Iron pot heads suitable for 1.1 kv class 25 sqmm UG cable filled with necessary bitumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

2

-

700

... More
supplying and fixing of heavy duty cable glands suitable for UG cable of 1.1 kv class (metal only) 25 mm. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

2

-

168

... More
Supply of 90 W LED streetlight with pressure die cast aluminum housing body with optimal heat sink for better thermal dissipation. Diffuser with injection moulded & is made of polycarbonate material with high transmission indes delivering superior light output . Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70% CCT>5500K, IP 66 optical and electrical compartment & impact rsistance of complete luminare>IK08. power Factor>0.9 with mains current should not be greater than 0.1A to 0.7A & Surge Protection-Min 4KV along with over voltage /Overload, short circuit/miswiring protection. Compatible for pole mounting with outer dia of 40 mm to 50 mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60 Hz application. Over load & short circuit protection ensures reliable operation in spite of problem in output side. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL aproved MCPCB Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools . LED Light fixture with.....W System power consumption. LED Efficiency>130lm/w at 1W & Fixture Efficiency>80lm with nominal CRI>75. Luminaire manufacturer should have in house facility accredited by NABL/CPRI & any Government ISO 9001:2008. Housing with supplier word mark/name shall be Engraved/Embossing on the die cast housing/Body part. Warrantly of 5 years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED source manufacture. Suitable for B1/B2 Roads as per IS 1944 part I & part II . The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

10

-

71600

... More
Supplying and Fixing 32mm dia class A GI pipe bracket up to 2.7 meters long terminated with a reducing collar of 40x25mm to which extra pipe of 175mm length is fixed for fixing MV/SV/MH/FTL street light fitting of all capacities on rail/RCC/wall/tubular pole, using suitable clamps, bolts ,nuts and wiring using suitable capacity wires etc complete The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.

10

-

10520



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.