Zilla Parishad Tender

... More
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Zilla Parishad Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date16 Feb 2023
Closing Date21 Feb 2023
Tender Amount₹ 99,02,550 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling in foundation trenches and plinth in layer not exceeding 150 mm thick well watered rammed fully compact -- do --do- complete job

643.5

-

128.8

... More
Centering and shuttering including strutting , proping etc and removal of form for foundations etc

643.5

-

194.5

... More
E/W in ecavation of foundation of structures as per drawing and technical specification, including setting out , construction of shoring and bracing, removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.(upto 3.00 m depth)RCD 12.01(A) ii

78.72

-

177.8

... More
Providing and laying boulder apron on river bed for protection against scour with stone boulders weighing not less 40 kg each complete as per drawing and technical specification .(A) Boulder laid dry without wire crates.) RCD 16.01

11.7

-

1158.4

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15) S.O.R. Item No. RCD 12.08(A) case ii

11.7

-

3754.4

... More
Stone masonary work in cement mortar 1:3 in foundation complete as per drawing and technical specification .. (b)Random Rubble Masonary in C.M. 1:3 in foundation S.O.R. Item No.RCD 12.07(B)

41.16

-

3458.6

... More
Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. Random Rubble Masonary in C.M. (1:3) in sub-structure. S.O.R. Item No. RCD 13.04 A

27

-

3468.8

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-15) S.O.R. Item No. 12.08(A) case ii

0.32

-

3754.4

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (R.C.C. Grade M-20) S.O.R. Item No.RCD 13.05 (E) (p)

5.04

-

4208

... More
Furnishing and placing reinforced cement concrete in super structure as per drawing and technical specification. (P.C.C. Grade M-25 in Deck Slab) S.O.R. Item No. RCD 14.01 A (i)(p)

8.56

-

4543.5

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications S.O.R. Item No. 14.04

2.07

-

10876.5

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications S.O.R. Item No. RCD 14.02(A)

1.27

-

87893.8

... More
Providing 12 mm thick cement plaster (1:4) with clean course sand of f.m. 1.5 including screening curing with all leads and lifts of water do… do as per E/i. & 1204 S.O.R. Item No. 5.7.2

67.06

-

174.07

... More
Providing weep holes with day grades stone filter of 53 mm to 22.4 mm size in abutment and wing wall all complete job as per specification and direction of E/I. S.O.R. Item No. 13.08

32

-

110.5

... More
Backfilling behind abutment, wing wall and return wall with Sandy Material complete as per drawings & technical specification Clause 1204.3.8 S.O.R. Item No13.09 (B).

62.4

-

874.6

... More
Centerin and shuttering including strutting , proping etc and removal of form for roofs.S.O.R 5.3.17.3

12.96

-

435.82

... More
E/W in ecavation of foundation of structures as per drawing and technical specification, including setting out , construction of shoring and bracing, removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.(upto 3.00 m depth)RCD 12.01 A(ii)

30.24

-

177.8

... More
Providing and laying boulder apron on river bed for protection against scour with stone boulders weighing not less 40 kg each complete as per drawing and technical specification .(A) Boulder laid dry without wire crates.) RCD 16.01

2.21

-

1158.4

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15) S.O.R. Item No. RCD 12.080(A) case-ii

8.82

-

3754.4

... More
Stone masonary work in cement mortar 1:3 in foundation complete as per drawing and technical specification .. (b)Random Rubble Masonary in C.M. 1:3 in foundation S.O.R. Item No.RCD 12.07 B

19.43

-

3458.6

... More
Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. Random Rubble Masonary in C.M. (1:3) in sub-structure. S.O.R. Item No. RCD 13.04 A

12.6

-

3468.8

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-15) S.O.R. Item No. 12.08 A case-ii

0.28

-

3754

... More
Providing 12 mm thick cement plaster (1:4) with clean course sand of f.m. 1.5 including screening curing with all leads and lifts of water do… do as per E/i. & 1204 S.O.R. Item No. 5.7.2

16.1

-

174.07

... More
Providing weep holes with day grades stone filter of 53 mm to 22.4 mm size in abutment and wing wall all complete job as per specification and direction of E/I. S.O.R. Item No. 13.08

8

-

110.5

... More
Backfilling behind abutment, wing wall and return wall with Sandy Material complete as per drawings & technical specification Clause 1204.3.8 S.O.R. Item No13.09 (B).

11.03

-

874.6

... More
Carriage of material

-

-

-

... More
cement

359.86

-

558.4

... More
Boulders

114.09

-

760.76

493.12

-

382.84

... More
stone dust

402

-

576.28

1.27

-

558.4

1407.83

-

576.28

... More
ADD GST(18%)

1

-

1495602.8

... More
LABOUR CESS

1

-

98045.07



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.