Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 27,140Document Cost
₹ 2,500Tender Fee
Refer Documents
Summary
Construction Of Pcc Road And R.c.c. Drain At Ward No. 27 Chintkarnibag New Colony Baijnathpur Bajrangbali Mandir To Nirmal Bera House To Rajesh Pradhan House Under Nagar Nigam Deoghar
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ZPDEO_95992_1Bid Award Id
ViewTender No
Re NIT - 13/2024-25 (Gr. No. 60)Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://jharkhandtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
61
1680
102498.3
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
91.5
4961
453998.3
... More
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
60
194
11670
... More
Carriage of material
Sand:-(lead-20 km)
39.25
412
16194.55
... More
Stone chips :- (lead -50 km)
120.17
859
103226.03
... More
S/Dust :-(lead -50 km)
19.52
859
16767.68
... More
Earthwork in excavation in foundation trenches in hard soil (vide classification of soil item-B) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l.
58.62
151
8899.64
... More
Extra for earthwork in hard soil as per specification and direction of E/l (vide classification of soil item-B)
58.62
15
909.19
... More
Providing coarse clean sand in filling in foundation trenches or in plinth including, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement compacted volume).
4.9
589
2886.85
... More
Providing designation75B one brick on flat soling joints fitted with local sand including cost of watering, taxes royalty all complete as per building specification and direction of E/I.
65.13
330
21516.04
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
28.32
5218
147777.9
... More
providing Tor steel reinforcement of 10mm,12mm,& 16mm. dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
1.56
82096
127849.93
... More
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
256.84
194
49954.6
... More
Carriage of material
Sand:-(lead-20 km)
18.07
412
7455.01
... More
Stone chips :- (lead -50 km)
24.34
859
20908.44
... More
Bricks :-(lead -15 km)
2.17
967
2100.76
... More
Add Cost of Sighboard & Photo
1
5000
5000
... More
G.S.T. @ 18%
1134418.58
-
204195.34
... More
Labour Cess @ 1%
1338613.92
-
13386.14