Zilla Parishad Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Zilla Parishad Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date25 Jan 2025
Closing Date31 Jan 2025
Tender Amount₹ 7,20,376 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
PROVIDING P.C.C.M 150 IN NOMINAL MIX OF (1:2:4) IN FOUNDATION WITH APPROVED QUALITY OF STONE -----DO ------

1.49

5626

8360.55

... More
REINFORCED CEMENT CONCRETE WORK IN WALLS. (ANY THICKNESS) INCLUDING ATTACHED PILASTERS, BUTTERSSES ,PLINTH AND STRING COURSES ,FILLETS, COLUMNS, PILLARS ,PIERS, ABUTMENTS , POSTS, AND STRUTS ETC ABOUT PLINTH LEVEL UP TO FLOOR FIVE LEVEL EXCLUDING COST OF CENTRING SHUTTERING FINISHING AND REINFORCEMENT

2.37

6082

14437.3

... More
REINFORCED CEMENT CONCRETE WROK IN BEAMS,SUSPENDED FLOORS , ROOFS HAVING SLOPE UP TO 15* LANDINGS , BALCONIES , SHELVES CHAJJAS , LINTELS BANDS PLAIN WINDOW SILLS , STAIRCASES AND SPIRAL STAIR CASES ABOVE PLINTH LEVEL UP TO FLOOR FIVE LEVEL , ESCLUDING THE COST OF CENTERING , SHUTTERINGS FINISHING AND REINFORCEMENT WITH (1:1.5:3)

1.04

6308

6547.35

... More
REINFORCED CEMENT CONCRETE WROK IN BEAMS,SUSPENDED FLOORS , ROOFS HAVING SLOPE UP TO 15* LANDINGS , BALCONIES , SHELVES CHAJJAS , LINTELS BANDS PLAIN WINDOW SILLS , STAIRCASES AND SPIRAL STAIR CASES ABOVE PLINTH LEVEL UP TO FLOOR FIVE LEVEL , ESCLUDING THE COST OF CENTERING , SHUTTERINGS FINISHING AND REINFORCEMENT WITH (1:1.5:3)

4.15

6308

26212.09

... More
PROVIDING DESIGNATION 75A BRICK WORK IN C.M. (1:6) IN FOUNDATION AND PLINTH LEVEL - DO -

1.57

5439

8535.12

... More
REINFORCED CEMENT CONCRETE WROK IN BEAMS,SUSPENDED FLOORS , ROOFS HAVING SLOPE UP TO 15* LANDINGS , BALCONIES , SHELVES CHAJJAS , LINTELS BANDS PLAIN WINDOW SILLS , STAIRCASES AND SPIRAL STAIR CASES ABOVE PLINTH LEVEL UP TO FLOOR FIVE LEVEL , ESCLUDING THE COST OF CENTERING , SHUTTERINGS FINISHING AND REINFORCEMENT WITH (1:1.5:3)

5.36

5573

29871.53

... More
REINFORCED CEMENT CONCRETE WROK IN BEAMS,SUSPENDED FLOORS , ROOFS HAVING SLOPE UP TO 15* LANDINGS , BALCONIES , SHELVES CHAJJAS , LINTELS BANDS PLAIN WINDOW SILLS , STAIRCASES AND SPIRAL STAIR CASES ABOVE PLINTH LEVEL UP TO FLOOR FIVE LEVEL , ESCLUDING THE COST OF CENTERING , SHUTTERINGS FINISHING AND REINFORCEMENT WITH (1:1.5:3)

0.22

6308

1408.77

... More
REINFORCED CEMENT CONCRETE WROK IN BEAMS,SUSPENDED FLOORS , ROOFS HAVING SLOPE UP TO 15* LANDINGS , BALCONIES , SHELVES CHAJJAS , LINTELS BANDS PLAIN WINDOW SILLS , STAIRCASES AND SPIRAL STAIR CASES ABOVE PLINTH LEVEL UP TO FLOOR FIVE LEVEL , ESCLUDING THE COST OF CENTERING , SHUTTERINGS FINISHING AND REINFORCEMENT WITH (1:1.5:3)

0.15

6308

964

... More
REINFORCED CEMENT CONCRETE WROK IN BEAMS,SUSPENDED FLOORS , ROOFS HAVING SLOPE UP TO 15* LANDINGS , BALCONIES , SHELVES CHAJJAS , LINTELS BANDS PLAIN WINDOW SILLS , STAIRCASES AND SPIRAL STAIR CASES ABOVE PLINTH LEVEL UP TO FLOOR FIVE LEVEL , ESCLUDING THE COST OF CENTERING , SHUTTERINGS FINISHING AND REINFORCEMENT WITH (1:1.5:3)

1.81

6308

11433.57

... More
REINFORCED CEMENT CONCRETE WROK IN BEAMS,SUSPENDED FLOORS , ROOFS HAVING SLOPE UP TO 15* LANDINGS , BALCONIES , SHELVES CHAJJAS , LINTELS BANDS PLAIN WINDOW SILLS , STAIRCASES AND SPIRAL STAIR CASES ABOVE PLINTH LEVEL UP TO FLOOR FIVE LEVEL , ESCLUDING THE COST OF CENTERING , SHUTTERINGS FINISHING AND REINFORCEMENT WITH (1:1.5:3)

1.45

6308

9166.16

... More
REINFORCED CEMENT CONCRETE WROK IN BEAMS,SUSPENDED FLOORS , ROOFS HAVING SLOPE UP TO 15* LANDINGS , BALCONIES , SHELVES CHAJJAS , LINTELS BANDS PLAIN WINDOW SILLS , STAIRCASES AND SPIRAL STAIR CASES ABOVE PLINTH LEVEL UP TO FLOOR FIVE LEVEL , ESCLUDING THE COST OF CENTERING , SHUTTERINGS FINISHING AND REINFORCEMENT WITH (1:1.5:3)

3.4

6308

21452.05

... More
PROVIDING 12MM THICK WATER PROF CEMENT PLASTER (1:3) WITH 5 % CICO DO … …… DO……… ALL COMPLETE JOB PUMP HOUSE

10.56

189

1997.4

... More
PROVIDING 12MM THICK WATER PROF CEMENT PLASTER (1:3) WITH 1.5MM CEMENT PUNING INCLUDING CURING CARRIAGE OF WATER WITH ALL LEADS AND LIFTS AS PER BUILDING SPECIFICATION AND DIRECTION - DO -

54.97

243

13387.76

... More
PROVIDING TOR STEEL REINFORCEMENT OF 10MM , 12MM, 16MM DIA BARS AS PER APPROVED DESIGN AND DRAWING DO …………. ALL COMPLETE JOB FOUNDATION

1.16

82096

95281.2

... More
SUPPLYING FITTING AND FIXING 20 GUAGE G.C.I SEAT GATE FITTED ON MS ANGLE FRAME OF SIZE 60x60x6MM INCLUDING COST OF FIBRECATION PROVIDING NECESSARY LOCKING ARRANGEMENT WITH HOSKAL AND DOMINY DULY FIXED IN PCC (1:2:4) BLOCK OF REQUIRED SIZE , APPLYING A PRIMING RED LEAD PAINT OVER STEEL WORK , TAXES ALL COMPLETE AS PER DRAWING SPECIFICATION AND DIRECTION OF E/I

4.83

4283

20699.13

... More
SUPPLYING FITTING AND FIXING MS GRILL GATE WITH MS GRILL MADE OF 20x6MM MS FLATS OR 16 MM MS SQUARE BARS FITTED ON 25x25x6MM MS ANGLE FRAME

60

118

7138.8

... More
PROVIDING 12 MM CEMENT PLASTER WITH CLEAN COURSE SAND OF F.M 1.5 INCLUDING SCREENING CURING WITH ALL LEADS AND LIFTS OF WATER SCAFFOLDING TAXES ANDROID ALL COMPLETE AS PER BUILDING SPECIFICATION AND DIRECTION OF E/ I WITH 1.5MM CEMENT PUNING INCLUDING CURING CARRIAGE OF WATER WITH ALL LEADS AND LIFTS AS PER BUILDING SPECIFICATION AND DIRECTION - DO -

8.3

235

1951.67

... More
PROVIDING 6 MM CEMENT PLASTER(1:4) IN CELLING WITH CLEAN COURSE SAND OF F.M 1.5

23.15

184

4261.36

... More
PROVIDING 12 MM CEMENT PLASTER (1:6) WITH CLEAN COURSE SAND OF F.M 1.5

57.84

165

9590.54

... More
PROVIDING TO COAT OF SNOWCEM OF APPROVED SHADE AND MAKE OVER A COAT OF CEMENT PRIMER ON NEW SURFACE INCLUDING PREPAIRING THE PLASTERED SURFACE SMOOTH WITH SANDPAPER SCAFFOLDING CURING AND TEXAS ALL COMPLETE AS PER BUILDING SPECIFICATION AND DIRECTION OF E/I

81

109

8834.23

... More
EXTRA FOR EACH COAT OF CEMENT WASH, DISTEMPER , PANT OP SNOWSEEM OVER EXTERIOR SURFACE FOR EACH CONSECUTIVE FLOOR ABOVE FIRST FLOOR INCLUDING SPECIFICATION ETC ALL COMPLETE AS PER SPECIFICATION AND DIRECTION OF E/I

15.43

20

314.42

... More
EXTRA COST OF RCC / PCC WORK FOR EACH CONSUTIVE FLOOR ABAVE FIRST FLOOR DO………DO……..AL COMPLETE JOB

6.07

6725

40796.66

... More
EXTRA FOR PLASTER WORK OVER EXTERIOR SURFACE FOR EACH CONSECUTIVE FLOOR ABOVE FIRST FLOOR INCLUDING COST OF SCAFFOLDING ETC ALL COMPLETE AS PER DIRECTION OF E/I

54.97

20

1120.23

... More
EXTRA FOR CENTERING AND SHUTTERING IN RCC WORK OF BEAM , STIFFNER AND COLUMN ROOF JOINTS OF 100MM GAP DO ……. DO…… ALL COMPLETE JOB BEAM

1.45

4089

5941.36

... More
EXTRA FOR CENTERING AND SHUTTERING IN RCC WORK OF BEAM , STIFFNER AND COLUMN ROOF JOINTS OF 105MM GAP DO ……. DO…… ALL COMPLETE JOB BEAM

1.27

4612

5857.9

... More
CARRIAGE COST OF MATERIALS(I) CEMENT LEAD FROM (14+1)KM

7.7

561

4320.47

... More
(II) ROD LEAD FROM (14+1)KM

1.16

561

649.75

... More
(III) SAND LEAD FROM (27+3) KM

15.54

619

9619.26

... More
(IV) CHIPS LEAD FROM (27+3)KM

12.76

619

7898.44

... More
(V) BRICK LEAD FROM (42+5)KM

3.44

2267

7789.55

... More
Cost of transportation and other miscellaneous charges for setting the rig machine at site all complete job as per direction of E/I.

1

5482

5482

... More
Cost of drilling 200mm x 165mm x 125m deep bore well in all kinds of soil and rock in rural or any other area for installation of pump set with hydraulic DTH rig machine, all complete including supplying all materials, tools drilling rig and Air Compressor and equipments, as well as fuel, lubricants and cost of transportation of rig machine and other vehicles up to the site flushing charges, geological investigation etc. all complete job. (A) From 0 - 50 meter (add C.P. @ 10% = 770+77=847)

50

847

42350

... More
(B) From 51 - 125 meter (add C.P. @ 10% = 804+80.4=884.4 )

15

884

13266

... More
Supplying all material tools, tackles and lowering of 200mm nominal dia UPVC Casing pipe confirming relevant for specification solving arrangement, cost of pipe etc. Including all taxes excise duty, freight charges with inspection charges etc, as applicable all complete job.

24

1595

38280

... More
Supplying all tools equipments and labour and doing washing , flushing and development of drilled tube well to give clean and clear water all complete as per direction of E/I

5

3691

18459.8

... More
Providing and fixing MS, GI or CI cap for 180mm NB dia UPVC pipe (add C.P. @ 10% = 200.00+20.00=220.00 )

1

220

220

... More
Supplying Submersible pump (2HP) sets confirming to IS 8034 and motor confirming to IS 9283. Pump shall be suitable for various delivery head and discharge with stainless steel pump shaft and polypropylene/noryl impeller. Motor suitable for working on 415 V + 10%, 3PH, 50HZ, A.C. supply with cable guard, thrust carbon/fiber bearing to with stand entire hydraulic thrust, water proof winding shall be provided. The pump set shall be suitable for direct coupling. Pump shall be suitable outlet as per manufacturers design. Anti thrust stream lined non return valve shall be provided with pump. 3 meter submersible copper conductor cable in single/double run shall be provided with each pump

1

20428

20428

... More
Cost of 32mm dia UPVC pipe (schedule 80) of approved make including lowering of pipe in the bore and transportation to work site etc. as per specification and direction of E/I.

49

330

16170

... More
commissioning of panel board suitable for the motor pump as mentioned in the item including lamps, starters, main switch,fuses,inter connection in the panel board including cost of wires etc. all complete job. As per specification and direction of E/I.

1

12000

12000

... More
S/F/F Of PVC insulated copper conductor cable25 sqmm ISI marked,FR LS PVC insulated, single core copper conductor cable

50

194

9723.5

... More
Supplying and commissioning of 5 KVA Servo stabilizer of Sen And Pandit of Pagaria or approved equipment make (Range 140V-280 V) single phase with cable, change over switch for submersible pump etc.all complete as per direction of E/I

1

4614

4614

... More
Supplying and drawing following size of FR PVC insulated copper conductor single core cable in existing surface/ recessed steel / PVC conduit including dismantling as required.

16.42

143

2348.06

... More
Earthing with copper earth plate 600x600mmx3mm thick including accessories and providing masonry enclosure with cover plate having locking arrangement and washing pipe etc. as required salt charcoal for GI or copper plate earth electrode as required.

1

8059

8059

... More
Supplying fitting and commissioning off automatic electronic sensor device to stop the motor at time of over flow of water from over head tank etc. and when the water level in bore well goes down specified depth

1

9300

9300

... More
Supplying 32mm dia GI elbow confirming IS specification including cost of all material labours jointing material all complete job.

4

175

703.44

... More
Supplying and fixing G.I. Reducing tee plain 32nmm dia

1

190

190.63

... More
add 18 % GST

600247.98

-

108044.64

... More
add S/B & PHOTOGRAPHY all estimated

1

5000

5000

... More
add 1 % labour cess

708292.62

-

7082.93



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.