Zilla Parishad Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Zilla Parishad Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date8 Oct 2024
Closing Date15 Oct 2024
Tender Amount₹ 22,63,939 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
plain cement concrete in open foundation complete as per drawing and technical specifications .PCC M 20 Grade ( 1:1.5:3)

43.91

182380

4153.5

... More
Earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation frenches within a lead of 50 M. and lift of 1.5 M all complete as per building specification and direction of E/l (Mode of measurement compacted volume).

8.78

485

55.28

... More
Carriage of material BRICKS

15.49

14988

967.6

... More
CEMENT

18.1

9097

502.6

49.48

13052

263.8

... More
STONE CHIPS

37.76

12770

338.2

... More
Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l.

63.72

9673

151.82

... More
Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including' cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement complacted volume).

21.24

12521

589.51

... More
Providing designation 75 B one brick on edge soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/l.

278.81

146456

525.29

... More
plain cement concrete in open foundation complete as per drawing and technical specifications .PCC M 20 Grade ( 1:1.5:3)

42.5

176523

4153.5

... More
Earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation frenches within a lead of 50 M. and lift of 1.5 M all complete as per building specification and direction of E/l (Mode of measurement compacted volume).

8.5

469

55.28

... More
Carriage of material BRICKS

14.99

10600

707.2

... More
CEMENT

17.51

8800

502.6

48.88

12894

263.8

... More
STONE CHIPS

36.55

12361

338.2

... More
Earthwork in excavation in foundation trenches in Hard soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l.

147

22317

151.82

... More
Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including' cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement complacted volume).

36.75

21664

589.51

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level :1:2:4 .

6.46

29704

4598.23

... More
Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. 60 mm thick C.C. paver block of M-30 grade with approved color design and pattern.

448

357504

798

... More
Carriage of material SAND

39.66

10462

263.8

... More
STONE CHIPS

5.81

1964

338.2

... More
CEMENT

2.32

1058

456.1

... More
BRICKS

12.61

7510

595.6

... More
Excavation in cutting in soil by manual means with lead up to 50M Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with all lift uo to 1.5M and lead uoto 50 metres as per Technical Specification Clause 302.3

44.61

10996

246.5

... More
Construction of Sub Grade & Earthen Shoulder (Construction of subgrade and earthen shoulders with approved material obtained form borrow pits with all lift & leads , transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) with lead up to 250 m as per Technical Specification claouse 303.1 Flank

8.92

1171

131.3

... More
Granular Sub base with close Graded Material (Table:- 400-1) By mix in place method (Construction of granular sub-base by providing well graded material, spreading in uniform layers with moter grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with sooth wheeel roller to achieve the desired density, complete as per clause 401) (ii) For Grading-II Material

44.61

58737

1316.7

... More
Providing P.C.C M – 200 in nominal mix of (1:1.5:3) in foundation with approved quality of 20mm to 6mm size graded and clean coarse sand of F.M (2.5 to 3.0) including screened, shuttering. Mixing cement concrete in mixer and placing in position. vibrating, striking, curing taxes and royalty all complete job as per building specification and direction of E/I.

44.61

185287

4153.5

... More
Carriage of Materials CEMENT, LEAD- 10 KM

18.37

8378

456.1

... More
SAND, LEAD - 10 KM.

19.18

4488

234.04

... More
STONE CHIPS, LEAD -15KM.

72.71

17017

234.04

... More
STONE DUST/MOORUM, LEAD -15KM.

22.75

5430

238.69

... More
Earthwork in excavation for structure as per drawing and technical specification in ordinary soil by mechanical means upto 3m

87

4993

57.4

... More
Sand filling in foundation trenches as per Drawing and Technical specification.

8.7

4939

567.8

... More
P.C.C. M10 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days)

13.05

44058

3376.1

... More
random rubble masonry work in cement mortar (1:3) for foundation complete as per drawing and technical specification.

45.88

158680

3458.6

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification. Granular material

19.4

6408

330.34

... More
Random Rubble masonry work in cement mortar 1:3 for sub–structure complete as per drawing and technical specification.

39.5

137017

3468.8

... More
Providing weep holes in Brick Masonry/Plain/ Reinforced Concrete Abutment, Wing Wall/Return Wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and technical specification.

40

4420

110.5

... More
P.C.C.M15 (1:2:4) in sub structure (Plain Cement Concrete 1:2:4 nominal mix in sub structure complete as per drawings and technical specifications

2.03

7604

3746.2

... More
CARRAIGE OF MATERIALS CEMENT

20.96

9559

456.1

49.92

11683

234.04

... More
STONE CHIPS

6.14

1437

234.04

... More
STONE METAL

12.3

3404

276.82

... More
BOULDER

85.35

34442

403.55

... More
Less 2300.00 per thousand for kiln burn bricks

30.48

-70104

2300

... More
GST @ 18%

1899596.25

341927

0.18

... More
Labour cess @ 1%

2241523.58

22415

0.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.