Water Resources Department Tender
... More
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 50,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Summary
Construction Of Contact Road In C.h.c Jainagar (group No. 01)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_WRD_99829_1Bid Award Id
ViewTender No
SPUF/MID/KODERMA/F2-11/2024-25 (2nd Call)Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://wrdjharkhand.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Carriage of Materials :- (i) Cement
87.5
549
48046.25
... More
(iv) Stone Metal
88.26
357
31573.25
... More
Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. BCD.5.1.1
362.49
151
55033.23
... More
(iii) Stone Chips
138.19
338
46735.86
... More
Providing and laying in position cement concrete of specified grade 1:2:4(1 cement:2 coarse sand(zone III):4 graded stone aggregate 20 mm nomonal size) excluding the cost of centering and shuttering-all work upto Plinth Level. B.C.D 5.3.1.2
17.13
4598
78767.68
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 40 mm nominal size) BCD.5.3.1.5
94.31
4027
379799.57
... More
Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by
table vibratory method using PU mould, laid in required colour & pattern over 50mm thick ompacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding ayer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge
80mm thick D.S.R- 16.91.2
618.03
893
552469.38
... More
GST 18%
2083414.71
-
375014.65
... More
Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) BCD.5.1.10
141.39
589
83350.82
... More
Labour Cess 1%
2458429.36
-
24584.29
... More
Centering and shuttering including strutting, propping etc. and removal of form for foundation footing , base of Column etc. for mass concrete. BCD.5.3.17.1
154.83
194
30114.44
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements