Water Resources Department Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 1,31,900Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_79809_1Bid Award Id
ViewTender No
WRD/MID MEDININAGAR/F2-01(01)/2023-24Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://wrdjharkhand.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Special Condition for F2 Online
BOQ Items
... More
Hire charge of diesel operated 10HP pump for b ailing out water from foundation trenches where necessary including cost of fuel, pay of operator with depreciation & major repair including profit ( Pump supplied by the Agency ). (Page 83 Item M-29 ) 50 Hrs
60
18000
300
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and suttering - all work up to plinth level : 1:2:4 ( 1 cement : 2 coarse sand zone III : 4 graded stone aggregate 20 mm nominal size ) SOR-BCD-(5.3.1.2)
366.48
1685159
4598.23
... More
Providing rough dressed random rubble stone masonry in cement mortar (1:4) in foundation --do-- complete job as per specification and direction of E/I. (SR.Item No. 5.4.8) COMMON SOR 4.28
188.05
515196
2739.68
... More
Providing do-do- in cement mortar (1:4) in Superstructure --do-- complete job as per specification and direction of E/I. (SR.Item No. 5.4.11) COMMON SOR 4.31
321.21
933744
2906.96
... More
Centering and suttering including strutting proping etc and removal of form fro foundation,footings ,bases of columns etc for mass concrete SOR-BCD (5.3.17.1)
645.69
125586
194.5
... More
Providing and laying in position specified grade of renforced cement concrete excluding the cost of centering and suttering - all work up to plinth level : 1:1.5:3 ( 1 cement : 1.5 coarse sand zone III : 3 graded stone aggregate 20 mm nominal size ) SOR-BCD-(5.3.10)
25.74
156562
6082.45
... More
Proiding tor steel reinforcement of 8mm dia rods as per approved design and drawing with cutting ,bending and binding with annealed wire with cost of wire removal of rust , placing the rods in position ( including carrage of bar at work site) all complete as per building specification and direction of E/I.TMT Fe 500 ( only valid for TATA TISCON ,SAIL, JSPL, ELECTROSTEEL STEEL Ltd BOKARO and VIZAG (RINL) SOR -BCD (5.5.4)
1.14
94977
83314.02
... More
Providing 25mm thick cement plaster (1:4) with -do- complete job as pr Specification and direction of E/I(SR.Item No. 5.5.5) COMMON SOR 3.12
140
36241
258.87
... More
Supplying and laying boulder in rock toe, heel trenches of the dam as pr design, drawing including the cost of materials royalty and all taxes etc. but excluding the cost of carriage all complete job as pr Specification and direction of E/I(SR.Item No. 5.6.4) COMMON SOR 6.4
40.63
60581
1491.06
... More
Earth work in filling foundation trenches or back filling of masonry structures with suitable earth in layers not excluding 150mm thick well watered, rammed and fully compacted and finaly dressed with earth obtained from excavation of foundation trenches and kept at a lead of 30m and initial lift of 1.5m complete job as pr Specification and direction of E/I(SR.Item No. 6.1.16)
237.56
27200
114.5
... More
Providing weep hole with dry graded stone filter of 20mm to 40mm size in abutment and wing wall as pr Specification and direction of E/I(SR.Item No. 6.7.6) COMMON SOR 6.9
64
10653
166.46
... More
Supplying of 300 mm dia. Hume Pipe (WRD SL.NO. 14, M 300)
6
3517
586.24
... More
Labour for laying, fitting and fixing NP2 hume pipe with collars in line, level and grade,as well as providing approved jointing materials and joints properly filled to make them water proof, all complete job as pr Specification and direction of E/I(SR.Item No. 7.6.1.3)
6
2171
361.9
... More
Carriage of Materials By mechanical transport including loading , unloading & stracking at site as pr direction of E/I.
-
-
-
... More
Cement - Lead 20 Km (P) + 5 Km (K)
204.14
171804
841.6
... More
Sand - Lead 5 km (P) +5 Km (K)
383.7
166602
434.2
... More
Stone Chips - Lead 5 Km (P) + 5 Km (K)
351.89
336054
955
... More
Boulder - Lead 5 Km (P) + 5 Km (K)
549.89
635700
1156.05
... More
Steel - Lead 20 Km (P) + 5 Km (K)
1.14
1065
934.6
... More
NP2 300 mm dia. - 20Km (P) + 5 Km (K)
6
587
97.88
... More
Add GST@18%
5532785.4
995901
1
... More
Add Labour Cess@1%
6528686.77
65286
1