Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Water Resources Department - WRD Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date6 Jan 2024
Closing DateCancelled
Tender Amount₹ 93,24,982 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royality all complete job as per specification and direction of E/I. (5.6.3. BCD)

102.7

33925

330.34

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) (5.3.1.2) BCD

8.62

39636

4598.23

... More
Centering and Shutterting including strutting, propping etc. and removal of form for Foundations, footings, bases of coulmns, etc for mass concrete 5.3.17.1 BCD

5.95

1157

194.5

... More
Centring and shuttering including strutting propping etc and removal of form for lintels, beam, plinth beam, girders,bressumers and cantilevers. 5.3.17.5 BCD

72.44

26365

363.97

... More
Centring and shuttering including strutting propping etc and removal of form for weather shade, chajjas, corbets etc, including edges. 5.3.17.19 BCD

10.78

4803

445.55

... More
Centring and shuttering including strutting propping etc and removal of form for suspended floors, roofs, landings, balconies and access platform. 5.3.17.3 BCD

111.01

48380

435.82

... More
Centring and shuttering including strutting propping etc and removal of form for Columns, pillars,piers, abutments, posts and struts. 5.3.17.6 BCD

35.75

16637

465.38

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) (5.3.9.1

26.59

138746

5218

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) (5.3.10) BCD In Column

9.52

57904

6082.45

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). (5.3.11) BCD

21.24

134000

6308.87

... More
Providing 75A brick work in C.M. (1:6) in Foundation and Plinth -d-do- all complete job as per specification and direction of E/I. (5.2.3) BCD

33.32

170273

5110.26

... More
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size). (5.3.5) BCD

7.95

2212

278.35

... More
Providing 75A brick work in C.M. (1:4) in Superstructure -do- -do- all complete job as per specification and direction of E/I. (5.2.10) BCD

60.72

349264

5752.05

... More
Providing 50mm thick first class patent stone flooring (1:2:4) with 20 mm to 6 mm.size gradede stone chips fibished with floor ig coat of neat cement in pannels -d- -do- all complete job as per specification and direction of E/I. (5.6.9) BCD

65.06

32873

505.28

... More
Supplying, fitting and fixing local make fully glazed steel door, windows or ventilation of standard rolled 'Z' and mullion steel section and size -do-do- all complete job as per specification and direction of E/I.(5.5.18) BCD

8.92

39930

4476.55

... More
Supplying, Fitting and fixing M.S grill made of 20 x 6mm M.S. flat -do- -do- all complete job as per specification and direction of E/I. (5.5.12) BCD

420.67

34625

82.31

... More
Providing TOR steel Reinforcement of 8mm dia rods as per approved design and drawing with cutting, bending, binding and placing in postion all complete job per specification and direction of E/I. (5.5.4 BCD) 8mm

1.15

95477

83314.02

... More
Providing cost of M.S. Reinforcement with cutting, bending, binding and placing in postion -do- -do- all complete job per specification and direction of E/I. (5.5.5(a) BCD) 10mm

3.27

268127

82096.54

... More
Providing cost of M.S. Reinforcement with cutting, bending, binding and placing in postion -do- -do- all complete job per specification and direction of E/I. (5.5.5(C) BCD) 16mm

4.41

357000

80879.07

... More
Providing 6mm thick C.P. (1:4) in ceiling with clean coarse sand of FM 1.5 -do -do- all complete job as per specification and direction of E/I. (5.7.6) BCD

91.65

16869

184.06

... More
Providing 12mm thick C.P. (1:6) with clean coarse sand of FM 1.5 including screening ,curing with all leads and lift of water ,scafolding taxes and royalty all complete job as per specification and direction of E/I. (5.7.3) BCD

347.15

57557

165.8

... More
Providing 12mm thick C.P. (1:3) with clean coarse sand -do- -do- all complete job as per specification and direction of E/I. (5.7.1) BCD

106.87

19300

180.6

... More
Providing 12mm thick C.P. (1:4) with clean coarse sand -do- -do- all complete job as per specification and direction of E/I. (5.7.2) BCD

186.56

32474

174.07

... More
Providing two coats of snowcem of approved shade and make over a coat of cement primer on new surface -do- -do- all complete job as per specification and direction of E/I. (5.8.24) BCD

438.8

47859

109.07

... More
Providing two coats of primer over steel surface -do- -do- all complete job as per specification and direction of E/I. (5.8.41) BCD

64.59

3731

57.77

... More
Providing two coats of painting with ready mixed paint over steel surface -do- -do- all complete job as per specification and direction of E/I. (5.8.43) BCD

64.59

4560

70.61

... More
Supplying, fitting and fixing collapsible gate of approved size and make properly fabricated with verticle double channels 20 x 10 x 2mm -do- -do- all complete job as per specification and direction of E/I.(5:5:14) BCD

3.9

21594

5537.11

... More
Supplying and laying boulder in rock toe in trenches of the dam as per design, drawing including the cost of materials royalty and taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/l.(5.6.4) Comm.

12.5

18638

1491.06

... More
Providing shuttering including structing, propping etc. and its removal after use in foundation as per specification and direction of E/I.(5:3:17) WRD

19.86

8302

418.03

... More
Providing shuttering including structing, propping etc. and its removal after use in super structure portion of various components -do- as per specification and direction of E/l.(5.3.18) WRD

103.37

46514

449.98

... More
Supplying, fitting and fixing 20 guage G.C.I. Sheet gate fitted on M.S. Angle frame of size 60X60X6mm. Including cost of fabrication, providing necessary locking arrangement with haskal and domny duly fixed in P.C.C. (1:2:4) blocks of required size applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/I.

13.01

55736

4284.14

... More
Providing 1.5 mm thick neat cement punning including curing, scaffolding, royalty and all taxes etc. complete job as per specification and direcition of E/l. (5.7.11)BCD

293.43

15971

54.43

... More
Supplying labour and equipment for digging well (vide classification of soil item-A) includin removing the soils to a safe distance upto 50m from the edge of the well all complete Job as per specificition and direction of E/l.(3.1.64) PHED

308.37

50147

162.62

... More
Extra for earth work in each additional lift of 1M -do- -do- all complete Job as per specificition and direction of E/l.(3.1.67) PHED 1M to 4M

49.34

8841

179.2

... More
4M to 5M

49.34

9659

195.78

... More
5M To 6M

49.34

10477

212.36

... More
6M to 6.25 M

12.34

2825

228.94

... More
E/W in filling in foundation trenches or back filling in foundation trenches or back filling of masonary structure with suitable earth in layers not exceeding 150mm thick well watered raqmmed and fully compacted and finally dressed with earth obtained from excavatin of foundation trenches and kept at lead of 30m and initial lift of 1.5m all complete job as per specification and direction of E/I.(6.1.16) WRD

45.62

5223

114.5

... More
Providing rough dressed coarse stone masosry in cm. (1:4) in superstructure with approved quality of coarse sand of requisite rn (2.5 to 3) washed and screened with risking out joints to 12mm depth, curing scaffolding and its removal where required royally and all taxes etc. complete Job as per specificition and direction of E/l.(5.2.31) BCD

65.45

190260

2906.96

... More
Providing R.C.C. M-150 with nominal mix of (1:2:4) in lintel with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of requisite F.M (2.5 to 3) including screening, shuttening, mixing cement mortar in mixer and placing in position, vibriting, striking, curing (but excluding the cost of reinforcement) tax and royalty all complete as per building specification and direction of E/l.(3.1.68)PHED

26.69

142940

5355.59

... More
Supplying and laying sand filter blanketing in horizontal portion of the dam as per design and drawing with watering, compaction including cost of sand, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.(5.6.1) COMM

2.72

3307

1216.17

... More
Supplying and laying good quality of stone metal filter (20mm to 63mm size) in the rock toe, heel trenches, toe drain as per design and drawing including the cost of materials, royalty, all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.(5.6.3) COMM.

8.9

15770

1771.92

... More
Supplying and laying gravel filter (size 5mm to 15mm ) in filter blanket and in the toe drain ( in horizontal portion) of the dam as per design, drawing including the cost of materials royalty and all taxes etc. but excluding the cost of carriage all as per specification and direction of E/I.(5.6.2) COMM.

2.72

3209

1179.93

... More
L/C for fitting and fixing 600mmx300mm C.I. grating in the steining walls of intake well as per specification and direction of E/I.(8.59)WRD

144

17552

121.89

... More
Providing 25mm precast R.C.C. M-150 with nominal mix of (1:2:4) jali with approved quality of stone chips of 6mm nominal size and clean coarse sand of F.M 2.5 to 3 with 1.6mm thick M.S. wire as per approved design and drawing and placing the same in position true to plumb and level and properly grouted with cement mortar (1:3) including cost of curing, scaffolding and finishing all complete as per building specification and direction of E/l.(5.3.21.3) BCD

26.77

20769

775.85

... More
Supplying materials and labour for fixing 20mm dia M.S. bar steps in steining wall of 0.30 M interval and staggered in (1:2:4) cement concrete including scaffolding and curing etc. all complete as per specification and direction of E/I.(3.1.71)PHED

30

6358

211.94

... More
Providing 25mm thick C.P. (1:4) with clean coarse sand with clean coarse sand of FM 1.5 includig screening curing with all leads and lift of water scaffoldinf taxeses an royalty ,all complete job as per specification and direction of E/I. (5.7.12 BCD)

151.18

39135

258.87

... More
Hire charge of diesel operated pump for bailing out of water during construction all complete as per building specification and direction of E/l.WRD pg 48-12

250

86212

344.85

... More
.Cost of carriage of materials : Cement

58.6

30700

523.9

... More
Sand :

339.37

126340

372.28

... More
Stone Chips :

80.64

42019

521.08

... More
Boulder :

77.95

54109

694.16

... More
Stone Metal

8.9

4953

556.61

... More
Bricks

41.52

28292

681.4

... More
E/W in filling in foundation trenches and plinth in layers not exceeding 150mm thick well watered raqmmed and fully compacted and finally dressed with earth obtained from excavatin of foundation trenches and kept at lead of 50m and initial lift of 1.5m all complete job as per building specification and direction of E/I.(5.1.7) B.C.D

2110.39

116662

55.28

... More
Labour charge for laying of 8" dia P.V.C. rising main G.I. pipes (Pump House to Distribution Tank) ( 3.1.37 E) PHED

1000

78930

78.93

... More
Labour charge for laying of 4" dia P.V.C. G.I. pipes for distribution (3.1.37 B) PHED

2300

150213

65.31

... More
Labour charge for fitting & fixing of 125mm to 150mm foot valve (8.01)WRD

2

1270

635.15

... More
Labour charge for fitting & fixing P.V.C. Tail Piece (8.62)WRD

9

966

107.35

... More
Labour charge for fitting & fixing of G.I. Bend (8.05)WRD

52

1348

25.94

... More
Labour charge for fitting & fixing of reducer (8.09)WRD

2

378

189.26

... More
Labour charge for installation of 20 HP to 35 HP electric motor (8.54)WRD

2

6405

3202.63

... More
Labour charge for fitting & fixing of 150mm P.V.C. Bend (8.70)WRD

12

1120

93.39

... More
Labour charge for fitting & fixing of P.V.C./G.I. Tee (8.67)WRD

12

1932

161.03

... More
Labour charge for fitting & fixing of N.R. valve & sluice valve (8.15)WRD

33

17335

525.31

... More
Labour charge for threading of M.S. pipe - 4" dia to 5" dia (8.04)WRD

20

1800

90.01

... More
Labour charge for fitting and fixing 100mm, 150mm reducing socket (8.07)WRD

3

54

18.16

... More
Carriage of materials to work site (pipe fittings, electric pump) by Truck (Page - 44, [{Sl. - 1(b) x 10% + 10%]

1

6521

6521.66

... More
63A TPM 415/440 V main switch(item -187) C.E. Lt 2873 Dt 31/12/2013

2

13922

6961.37

... More
25/30 HP motor starter ( Item -186) C.E Lt 2873 Dt 31/12/2013

2

30850

15425.14

... More
Voltmeter - 500 V (item-188)C.E Lt 2873 Dt 31/12/2013

2

1738

869.02

... More
Ampere Meter - 60 A (item -189)C.E Lt 2873 Dt 31/12/2013

2

1520

760.39

... More
Wooden panel board for fitting main switch, volt meter, amp. meter etc.(202)C.E Lt 2873 Dt 31/12/2013

2

10738

5369.31

... More
7/20 Copper Wire (194)C.E Lt 2873 Dt 31/12/2013

150

9655

64.37

... More
7/18 Copper Wire (197)C.E Lt 2873 Dt 31/12/2013

100

7931

79.31

... More
Batten Holder (198)C.E Lt 2873 Dt 31/12/2013

20

1344

67.24

... More
Piano type Switch (214)C.E Lt 2873 Dt 31/12/2013

20

1138

56.9

... More
100 Watt BulbC.E Lt 2873 Dt 31/12/2013 (203)

10

223

22.3

... More
PVC TapeC.E Lt 2873 Dt 31/12/2013 (195)

15

217

14.48

... More
1½" P.V.C. Flexible PipeC.E Lt 2873 Dt 31/12/2013 (199)

30

1117

37.24

... More
63A Copper bushbar - 3 Phase 4 PoleC.E Lt 2873 Dt 31/12/2013 (201)

1

2879

2879.15

... More
Supply of 25 HP Kirlosker Electric Motor PumpC.E Lt 2873 Dt 31/12/2013

2

315882

157941.3

... More
6" dia G.I. (Suction) pipe=2x30 C.E Lt 2873 Dt 31/12/2013

60

111662

1861.04

... More
4" dia Delivery Pipe = 2 x 7.5M C.E Lt 2873 Dt 31/12/2013

31

39030

1259.05

... More
6" dia C.I. Foot Valve (COMM. PART A M1063 PAGE 134)

2

11035

5517.6

... More
8" dia G.I Bend - 6mm thick C.E Lt 2873 Dt 31/12/2013

2

7478

3739.32

... More
6" dia G.I. Bend - 6mm thick C.E Lt 2873 Dt 31/12/2013

3

8659

2886.39

... More
6" dia G.I. Flange - 10mm thick C.E Lt 2873 Dt 31/12/2013

35

19794

565.55

... More
4" dia G.I. Flange - 10mm thick C.E Lt 2873 Dt 31/12/2013

120

42760

356.34

... More
4" dia G.I. Nipple (COMM. PART A M930 Jix page 94)

6

1979

329.9

... More
4" dia N.R. Valve (COMM. PART A M1039A(4) PAGE 118)

2

10208

5104

... More
4" dia Sluice Valve( COMM. PART A M1039 B4 PAGE 120)

27

210672

7802.69

... More
4" x 8" Reducer C.E Lt 2873 Dt 31/12/2013

4

5365

1341.46

... More
8" H.D.P.E Rising main pipe (grade-PE80-PN10)(Common Part A M-1028, PG-104)

1000

1923820

1923.82

... More
4" dia HDPE Pipe (grade-PE80-PN06)(Common Part-A, M-1028, PG-104)

2300

908845

395.15

... More
8" P.V.C. Bend C.EC.E Lt 2873 Dt 31/12/2013

3

2565

855.22

... More
8" P.V.C. Tee C.EC.E Lt 2873 Dt 31/12/2013

1

1373

1373.65

... More
4" P.V.C Tee (C.E. Lt-2873, dt-31/12/2013, Sl.no-105)

25

11437

457.5

... More
4" G.I Bend (C.E. Lt-2873, dt-31/12/2013, Sl.No.-111)

35

36571

1044.9

... More
4" dia P.V.C. Tail Piece (C.E. Lt-2873, dt-31/12/2013)

4

537

134.49

... More
4" dia P.V.C. Flange (C.E. Lt-2873, dt-31/12/2013)

20

21564

1078.23

... More
Solvent Cement (C.E. Lt-2873,dt-31/12/2013, item-134)

53

16266

306.91

... More
M-Seal C.E(C.E. Lt-2873,dt-31/12/2013, item-136)

32

1241

38.8

... More
Commissioning charge of complete work including fuels and lubricants at site as per direction of E/I.

1

3641

3641

... More
Goods & Services Tax (G.S.T.) @ 18%

7824283.88

1408371

18

... More
Labour Cess @ 1%

9232654.98

92326

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.