Water Resources Department Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 1,55,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_87099_1Bid Award Id
ViewTender No
WRD/MID/DUMKA/F2-01/24-25/G10Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://wrdjharkhand.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and laying in position Ce ment conc. Of specified grade excluding the cost of Centuring and Shuttering - All work up to plinth level - PCC M-15 with nominal mix 1:2:4 (1 Cement : 2 Course Sand (Zone- iii) : 4 graded stone aggregate 20 mm nominal Size) all . complete job as per building specification and direction of E/I. BCD Item - 5.3.1.2, Page No. 106
335.81
1544131
4598.23
Providing ramdom rubble stone masonary in c.m. (1:4) in foundation and plinth with hammer dressed stone of less then 0.03 m3 in volume and clean coarse sand of F.M.2.to 2.5 including cost of screening , racking out joints, to 20mm,depth, curing taxes and royality all complete as per bulding specification and direction of E/I. (5.2.28) PART A PAGE 204 .
308.55
845328
2739.68
Providing random rubble stone masonary in c.m. (1:4) in superstructure and with hammer dressed stone of less then 0.03 m3 in volume and clean coarse sand of F.M.2.to 2.5 including cost of screening of materials,Scaffolding, racking out joints, to 20mm,depth, curing texas and royality all complete as per bulding specification and direction of E/I (5.2.31) PART A PAGE 204 .
376.29
1093859
2906.96
Providing and laying in position Cement conc. in Retaing wall, return wall, wlls(any thickness) including attached pillasters, columns, piers abut. , pillars, posts, struts, buttress, string or lacing course,parapets, coping, bed blocks, anchor blocks, plain window sills, ... excluding the cost of Centuring and Shuttering and fishing :PCC M-15 with nominal mix 1:2:4 (1 Cement : 2 Course Sand (Zone- iii) : 4 graded stone aggregate 20 mm nominal Size) all . complete job as per building specification and direction of E/I. BCD Item - 5.3.2.2, Page No. 106
10.03
56430
5626.21
Providing centuring and shuttering including,strutting,propping etc and its and removal of form for foundations,footings,bases of columns etc.for mass concrete after as per specification and direction of E/I.SOR BCD page no.108 (5.3.17.1)
380.78
74061
194.5
Centuring and shuttering including strutting, proping etc. and removal of form from lintels, beams, and coloumns, plinth beams, girders etc as per specification and direction of E/I. BCD. Item 5.3.17.5 , Pg - 108
76.62
27887
363.97
Providing and laying in position Cement conc. Of specified grade excluding the cost of Centuring, Shuttering, finishing and reinforcement - All work up to plinth level - RCC M-20 with nominal mix 1:1.5:3 (1 Cement : 1.5 Course Sand (Zone- iii) : 3 graded stone aggregate 20 mm nominal Size) all . complete job as per building specification and direction of E/I. BCD Item - 5.3.9.1, Page No. 107
32.59
170054
5218
Prov. Tor Steel reinforcement of 10 mm, 12mm & 16 mm. Dia bars as par approved design and drawin....do..do. (a) 10 mm (TMT coil Fe 500 (Only valid for Tata (Tiscon), Sail, JSPL, Electro steels Ltd. Bokaro and Vijag (RINL), BCD. (5.5.5), Page-119
1.96
160909
82096.54
Providing weep holes with dry graded stone filter of 20 mm to 40 mm size in abutment and wing wall as per specification and direction of E/I. P-A, Item No. 6.7.6, PAGE-209.
60
9987
166.46
Providing 25 mm cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening ,curing,with all leads and lifts of water scaffolding taxes and royalty all . complete job as per building specification and direction of E/I. ( 5.7.12) PART A PAGE 200
301.94
78163
258.87
Provision of dewatering with 10 H.P diesel pump set including P.O.L part-B WRD PAGE 83 SL.NO 10
200
66000
330
Supplying & laying boulder in rock toe, heel trenches of the dam as per design & drawing including the cost of materials, royalty and all taxes etc. But excluding the cost of carriages all complete as per specification and direction of E/I. ( 5.6.4) PART A PAGE 209.
52.78
78698
1491.06
Providing 1.5 mm thick cement punning including curing carriage of water with leads and lift as per bulding specification and direction of E/I. (5:7:11) PART A Page-200
69.8
3799
54.43
Earth work in filling in foundation treanches and back filling of masonry structures with suitable earth in layers not exceeding 150 mm thick well watered,rammed and fully compacted and finally dressed with earth obtained from excavation of foundation treanch and kept at a lead of 30m and initial lift of 1.5 m complete as per specification and direction of E/I (6.1.16) WRD PAGE 120
338.32
38737
114.5
Carriage of materials Cement + Steel
234.19
171872
733.9
Sand
452.6
163714
361.72
Stone Chips
339.24
422000
1243.96
Stone Boulder
737.62
954000
1293.35
Provision of GST @ 18%
1
1163072
1163072.87
Add 1% Labour Cess
1
76245
76245.89
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements