Water Resources Department Tender

... More
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Water Resources Department - WRD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date31 Dec 2024
Closing Date6 Jan 2025
Tender Amount₹ 38,08,710 
Notes
Download

Costs

Summary

Construction Of R.c.c. Culvert At Village- Luru,block-chainpu

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulder duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. 6.8

27.31

1756

47967.28

... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc. up to floor five level, excluding the cost of centering, shuttering and finishing: 5.3.2.2

79.87

5626

449365.39

... More
Providing random rubble stone masonry in C.M. (1:4) in foundation and plinth with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M. 2 to 2.5 including cost of screening, raking out joints to 20mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. 5.2.28

123.46

2739

338240.89

... More
Providing random rubble stone masonry in C.M. (1:4) in superstructure with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M. 2 to 2.5 including cost of screening of materials, scafolding , raking out joints to 20mm depth, curing, taxes and royalty all complete as per building specification and direction of E/l. 5.2.31

61.32

2906

178254.79

... More
Providing weep holes in Brick masonary/plain/reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical Specifications. 13.08

80

110

8840

... More
Plain/Reinforced Cement Concrete in sub-structure complete as per drawing and Technical Specifications. 13.05 (B)

21.32

4168

88866.02

... More
Providing and laying Cement Concrete Wearing Coat M30 grade including reinforcement complete as per drawing and Technical Specifications. 14.04

5.1

10876

55470.15

... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc. up to floor five level, excluding the cost of centering, shuttering and finishing: 5.3.2.2

4.08

5626

22954.94

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications. 14.02

4.66

87893

409585.11

... More
Centering and shuttering including strutting, propping etc. and removal of form for - 5.3.17

-

-

-

... More
Foundation & Footing 5.3.17.1

53.72

194

10448.54

... More
Abutment cap, pier cap etc. 5.3.17.6

33.66

465

15664.69

... More
Slab 3.3.17.3

66.91

435

29160.72

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specifications. 13.09

165.59

639

105961.04

... More
Providing 25 rnm thick cement plaster (1:4) with clean coarse sand of F.M. 1.5 ircluding screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/l 5.7.12

153.48

258

39731.37

... More
Providing 6 mm thick cement plaster (1:4) in ceiling with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/l. 5.7.6

55.76

184

10263.19

... More
Dewatering by 5 HP pump set during the execution of work all complete job as per specification and direction of E/I. pg. 48 item 12

90

150

13500

... More
Earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M. and lift of 1.5 M all complete as per building specification and direction of E/l (Mode of measurement compacted volume). 5.1.8

67.97

118

8053.77

... More
Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l. 5.1.1+2

141.74

167

23717.35

... More
Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including' cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement complacted volume) 5.1.10

12.21

589

7197.92

... More
Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulder duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. 6.8

10.9

1756

19144.76

... More
Providing and laying cement concrete in tetaining walls, return walls, walls (any thickness) including attached pilasters, columna, piers, abutments, pillars, posts, struts, buttresses, string of lacing courses, parapates, coping, bed blocks, anchor blocks, plain window sills, fillets sunken floor etc. up to floor fice level excluding the cost of centering shuttering and finishing 5.3.2.2

10.9

5626

61325.69

... More
Providing random rubble stone masonry in C.M. (1:4) in foundation and plinth with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M. 2 to 2.5 including cost of screening, raking out joints to 20mm depth, curing, taxes and royalty all complete as per building specification and direction of E/ 5.2.28

92.38

2739

253091.64

... More
Providing random rubble stone masonry in C.M. (1:4) in superstructure with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M. 2 to 2.5 including cost of screening of materials, scafolding , raking out joints to 20mm depth, curing, taxes and royalty all complete as per building specification and direction of E/l. 5.2.31

64.43

2906

187295.43

... More
Providing and laying cement concrete in tetaining walls, return walls, walls (any thickness) including attached pilasters, columna, piers, abutments, pillars, posts, struts, buttresses, string of lacing courses, parapates, coping, bed blocks, anchor blocks, plain window sills, fillets sunken floor etc. up to floor fice level excluding the cost of centering shuttering and finishing 5.3.2.2

1.98

5626

11139.9

... More
Providing weep holes in brick masonry/plain/reinforced concrete abutment, wing wall with 100 mm dia ac pipe, extending through the full width of the structure with slop of 1v:20H towards and technical specifications 13.08

20

110

2210

... More
Providing 25 rnm thick cement plaster (1:4) with clean coarse sand of F.M. 1.5 ircluding screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/l 5.7.12

114.89

258

29741.57

... More
Providing 12mm cement plaster (1:3) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/l. 5.7.1+11

26.02

235

6115.48

... More
Providing 1.5mm cement punning including curing, carriage of water with all leads and lifts as per building specification and direction of E/l. 5.7.11

140.91

54

7669.73

... More
Earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation frenches within a lead of 50 M. and lift of 1.5 M all complete as per building specification and direction of E/l (Mode of measurement compacted volume). 5.1.7

70.87

50

3601.61

... More
Carriage of materials

-

-

-

... More
(i) Cement

95.49

502

47993.27

... More
(ii) Steel

4.66

502

2342.12

... More
(iii) Sand

245.73

731

179825.21

... More
(iv) Chips

109.83

758

83337.91

... More
(v) Boulder

379.8

923

350589.58

... More
(vi) Earth

67.97

409

27840.51

... More
After adding GST @18% on total estimated value the total estimated amount is

3195762.7

-

575237.29

... More
Labour Cess @1% on above total estimated amount

3770999.99

-

37710



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.