Water Resources Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Water Resources Department - WRD Tender

Works
Civil And Construction
Consultancy Services
Civil And Architectural Services
Water Storage And Supply
Eprocure
Opening Date8 Oct 2024
Closing Date14 Oct 2024
Tender Amount₹ 93,71,995 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling in foundation trenches or Back filling of masonary structure with suitableearth in layers not exceeding 150 mm thick well waterd, rammed, fully compacted and finally dressed with earth obtained from excavation of foundation trenches and kept at a lead of 30M and initial lift of 1.5M complete as per specification and direction of E/I. (SOR WRD Part B, Page 120,Sl. No. 6.1.16)

104.98

13529

128.88

... More
DT: Basic rates for 125/115 mm dia Drilled Tube well do…do... as per specification and direction of E/I. (Basic rates) (SOR DW&S, Sl No. 121, Pg No. 58) Added 10% CP

-

-

-

... More
From 0 to 30m

2550

1192125

467.5

... More
From 31 to 60m

2550

1284690

503.8

... More
Supplying all materials, labours, equipments for lowering 125 mm dia blue UPVC casing pipedo…do… all complete including carriage of materials to work site (Basic Rate) (SOR DW&S, Sl. No. 125, Page No. 65) Added 10% CP

2125

32841

15.46

... More
Basic rate of UPVC pipe 125mm dia conforming to I.S.I. latest revision IS 12818/2016 CML No. 5543459 (SOR DW&S, Sl No. 108, Pg No. 43) (Added 10 % C.P.)

2125

1215149

571.84

... More
Providing designation 75 A brick flat soling joints filled with local sand including cost of watering taxes royalty all completeas per builidng specification & direction of E/I. ( B.C.D., Sl. No. 5.6.1, Page no- 124)

253.3

90306

356.52

... More
PCC 1:3:6 in foundation do…do including curing for 14 days ) (SOR BCD, Sl No. 5.3.1.5, Page No 106 )

37.83

156043

4125.41

... More
Providing designation 75 A brick work in C.M. ( 1:6 ) in foundation do…do all complete as per building specification and direction of E/I. (SOR BCD, Sr No. 5.2.3, Pg No 100 )

232.14

1262779

5439.85

... More
Coarse sand at Quarry (Equivalent to Koliwar sand) ( SOR WRD, Page No. 33, Sl. No. 1)

61.46

24151

393

... More
Aggregate 63 mm to 45 mm at Quarry ( SOR WRD, Sl No. 8, Page No. 33)

110.59

104502

945

... More
Aggregate 13.2 mm to 5.6 mm at Quarry ( SOR WRD, Sl No. 11, Page No. 33 )

73.7

72958

990

... More
Providing and laying in position cement concrete of Grade M15 (1:2:4) excluding the cost of centering and shuttering-All work upto plinth level as per drawing and technical specifications and Direction of E/I. (SOR BCD, Sl. No. 5.3.1.3, Pg No 106)

12.5

56270

4503.43

... More
Providing 12 mm cement plaster (1:4) do…do as per building specification and direction of E/I. (SOR BCD, Sl. No. 5.7.2, Pg No 129)

563.55

98097

174.07

... More
UPVC pipe ( working pressure 4 kg/cm2 ) single socketed pipe 110 mm dia (SOR WRD, Sl. No. 307 , Pg No. 72 ). (Added C.P. 10%)

3400

486200

143

... More
UPVC coupler for UPVC drainage pipes 110 mm (SOR WRD, Sl. No. 311 , Pg No. 72 ). (Added C.P. 10%)

850

36465

42.9

... More
UPVC single equal Tee (without door) 110 X 110 X 110 mm (SOR WRD, Sl. No. 315 , Pg No. 72 ). (Added C.P. 10%)

425

37867

89.1

... More
UPVC Bend 87.5° 110 mm bend (SOR WRD, Sl. No. 319 , Pg No. 72).(Added C.P. 10%)

425

27582

64.9

... More
UPVC Pipe clip 110 mm bend (SOR WRD, Sl. No. 323, Pg No. 72 ). (Added C.P. 10%)

2125

35062

16.5

... More
U-PVC pipes (working pressure 4 kg/cm2 ) Rubber (Seal) Ring 110 mm (SOR WRD, Sl. No. 309, Pg No. 72 ). (Added C.P. 10%)

3825

42075

11

... More
Stainless Screws 50 mm (SOR WRD, Sl. No. 383 , Pg No. 75 ). (Added C.P. 10%)

85

26180

308

... More
Solvent cement (SOR DW&SD, Sl. No. 42, Page No. 39 ) (Added C.P. 10%)

85

15708

184.8

... More
Supplying labours and tools for laying and jointing UPVC pipe in trenches do…do all complete as per specification and direction of E/I ( UPVC pipe with collar and cement to be supplied departmentally free of cost ) ( SOR DW&SD, Sl. No. 3.1.36(b) Page No. 113)

1275

74498

58.43

... More
NP2 RCC Hume pipe with collar (250 mm dia) as per I.S.S 458-1971 (SOR WRD Sl. No. 13 (M300), Pg. No. 84) (Added C.P. 10%)

212.5

93967

442.2

... More
Labour for laying, fitting and fixing NP2 hume pipe do…do all complete, as per specification and direction of E/I. (SOR WRD, Sl. No. 7.6.1.2, Page No. 149)

212.5

65541

308.43

... More
Supplying materials and labours for constructing inspection chamber do….do all complete as per specification and direction of E/I (SOR DW&SD, Sl no. 3.3.8 page no. 130)

85

734089

8636.35

... More
(A) RANCHI Carriage of Materials:-

-

-

-

... More
Sand - Sand with a lead of 17.87 km surfaced road

47.59

18126

380.91

... More
Stone Chips - Stone Chips with a lead of 20.96 km surfaced road

32.59

13912

426.88

... More
Stone Metal - Stone Metal with a lead of 20.96 km surfaced road

29.92

13590

454.17

... More
Cement - Cement with a lead of 5 .78 km surfaced road

9.34

4326

463.35

... More
Bricks - Bricks with a lead of 12.78 km surfaced road

27738

24548

885.02

... More
Hume Pip (250 mm) - Hume Pipe with a lead of 23.17 km surfaced road

57.5

33463

581.98

... More
(B) LOHARDAGA Carriage of Materials:-

-

-

-

... More
Sand - Sand with a lead of 15 km surfaced road

33.1

11195

338.2

... More
Stone chips - Stone Chips with a lead of 25 km surfaced road

22.67

11041

487

... More
Stone Metal - Stone Metal with a lead of 25 km surfaced road

20.82

10814

519.55

... More
Cement - Cement with a lead of 5 km surfaced road

6.5

2962

456.1

... More
Bricks - Bricks with a lead of 8 km surfaced road

19296

13646

707.2

... More
Hume Pipe (250 mm)- Hume Pipe with a lead of 25 km surfaced road

40

23824

595.6

... More
(C) GUMLA Carriage of Materials:-

-

-

-

... More
Sand - Sand with a lead of 15 km surfaced road

41.38

13994

338.2

... More
Stone Chips - Stone Chips with a lead of 25 km surfaced road

28.34

13801

487

... More
Stone Metal - Stone Metal with a lead of 25 km surfaced road

26.02

13518

519.55

... More
Cement - Cement with a lead of 5 km surfaced road

8.12

3703

456.1

... More
Bricks - Bricks with a lead of 10 km surfaced road

24120

18852

781.6

... More
Hume Pipe (250 mm)- Hume Pipe with a lead of 25 km surfaced road

50

29780

595.6

... More
(D) SIMDEGA Carriage of Materials:-

-

-

-

... More
Sand - Sand with a lead of 20 km surfaced road

12.41

5122

412.6

... More
Bricks - Bricks with a lead of 12.78 km surfaced road

8.5

4140

487

... More
Hume Pip (250 mm) - Hume Pipe with a lead of 23.17 km surfaced road

7.81

4055

519.55

... More
Cement - Cement with a lead of 8 km surfaced road

2.44

1179

484

... More
Bricks - Bricks with a lead of 10 km surfaced road

7236

5655

781.6

... More
Stone chips - Stone Chips with a lead of 25 km surfaced road

15

8934

595.6

... More
(E) KHUNTI Carriage of Materials:-

-

-

-

... More
Cement - Cement with a lead of 5 km surfaced road

41.38

13994

338.2

... More
Stone Chips - Stone Chips with a lead of 20 km surfaced road

28.34

11693

412.6

... More
Stone Metal - Stone Metal with a lead of 20 km surfaced road

26.02

11413

438.64

... More
Cement - Cement with a lead of 5 km surfaced road

8.12

3703

456.1

... More
Sand - Sand with a lead of 15 km surfaced road

24120

18852

781.6

... More
Stone Chips - Stone Chips with a lead of 25 km surfaced road

50

29780

595.6

... More
Add GST@18%

7863731.54

1415471

1

... More
Add Labour Cess@1%

9279203.22

92792

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.