Water Resources Department Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Water Resources Department - WRD Tender
Civil And Construction
Eprocure
Opening Date16 Mar 2024
Closing Date28 Mar 2024
Tender Amount₹ 89,91,632
Costs
EMD
₹ 1,82,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_85699_1Bid Award Id
ViewTender No
WRD/MID/JAMSHEDPUR/F211/23-24Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://jharkhandtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Extra for earthwork in all kinds of soil for each additional lift of 1.0 M or part there of over the initial lift of 1.5m as per specification and direction of E/I.(5.1.21.1)
-
-
-
... More
(i) Ist Extra Lift :
928.19
12317
13.27
... More
(ii) 2nd Extra Lift :
1295.72
34388
26.54
... More
Extra for earthwork in rock for each additional lift of 1.0 M or part thereof over the initial lift of 1.5m as per specification and direction of E/I.(Item No.5.1.21.2)
-
-
-
... More
(i) Ist Extra Lift :
103.13
2052
19.9
... More
(ii) 2nd Extra Lift :
143.97
5730
39.8
... More
Providing and laying P.C.C. or R.C.C.M-150 with nominal mix of (1:2:4) in various components of dam foundation approved quality of 20 mm graded coarse aggregate of required grade as per design and approved quality of sand of requisite F.M. (2.5 to 3.0) washed and screened excluding cost of shuttering or form work as well as of reinforcement, its cutting, bending binding and placing but including necessary tools and plants, vibrating, curing, royalty and all taxes etc. complete job as per specification and direction of E/I. (WRD Item no. 5.3.6) (BCD 5.3.1.2)
433.63
1993930
4598.23
... More
Providing and laying P.C.C. or R.C.C.M-200 with nominal mix of (1:1.5:3) in various components of dam superstructure approved quality of 40 mm graded coarse aggregate of required grade as per design and approved quality of sand of requisite F.M. (2.5 to 3.0) washed and screened excluding cost of shuttering or form work as well as of reinforcement, its cutting, bending binding and placing but including necessary tools and plants, vibrating, curing, royalty and all taxes etc. complete job as per specification and direction of E/I. (WRD Item No 5.3.11) (BCD 5.3.9.1)
24.88
129823
5218
... More
Providing rough dressed random rubble stone masonry in cement mortar (1:4) in foundation with approved quality of coarse sand of requisite F.M (2.5 to 3) washed and screened with raking out joints curing, scaffolding and its removal wherever required including royalty and all taxes etc. complete job as per specifications and direction of E/I.(WRD Item No..5.4.8) (Part A 4.28)
289.53
793219
2739.68
... More
Providing rough dressed random rubble stone masonry in cement mortar (1:4) in super-structure with approved quality of coarse sand of requisite F.M (2.5 to 3) washed and screened with raking out joints curing, scaffolding and its removal wherever required including royalty and all taxes etc. complete job as per specifications and direction of E/I.(Item No 5.4.11) (Part A 4.31)
499.01
1450602
2906.96
... More
Providing shuttering including strutting, propping etc and its removal after use in foundation as per specification and direction of E/I. (5.3.17.1)
479.17
93198
194.5
... More
Providing TMT reinforcement (tor steel) as per approved design, drawing, removal of rust, cutting, bending, binding including supplying annealed wire, placing M.S rods in position all complete as per specification and direction of E/I. 8mm TMT Fe500 (Only valid for SAIL &TATA Steel (Item No Part 5.3.15) (BCD 5.5.4)
0.85
70733
83314.02
... More
Providing 25mm thick cement plaster (1:4) with approved quality of sand of requisite F.M (2.5 to 3.0) washed and screened including curing, scaffolding wherever required and its removal , royalty and all taxes etc. complete job as per specifications and direction of E/I.(Item No. 5.5.5) (Part A 3.12)
365.3
94565
258.87
... More
Supplying and laying boulders in rock toe, heel trenches of the dam as per design, drawing including the cost of materials, royalty and all taxes etc. but excluding the cost of carriage all complete as per specifications and direction of E/I.(Item No. Part B 5.6.4) (Part A 6.4)
85.5
127485
1491.06
... More
Earth-work in filling foundation trenches or back filling of masonary structures with suitable earth in layers not exceeding 150mm thick well watered,rammed and fully compacted and finally dressed with earth obtained from excavation of foundation trenches and kept at a lead of 30m and initial lift of 1.5m complete as per specification and direction of E/I.(Item No.Part B 6.1.16)
362.01
41450
114.5
... More
Providing weep hole with dry graded stone filter of 20mm to 40mm size in abutment and wing wall as per specification and direction of E/I.(Item No.Part B 6.7.6) ( Part A 6.9)
20
3329
166.46
... More
Use Rate of diesel pump per H.P. per hour for dewatering during the construction of weir as per specification and direction of E/I. (WRD Page 83 PM 29)
150
51727
344.85
... More
Supplying, laying, fitting and fixing 300 mm dia NP3 hume pipe with collars in level and grade as well as providing approved jointing materials and joints properly filled to make them water proof, all complete as per specifications and direction of E/I.(S.O.R. Item No. : Page-84, M-300(v) + 7.6.1.3)
5
4740
948.15
... More
Carriage of materials
-
-
-
... More
(i) Cement
268.14
149059
555.9
... More
(ii) Sand
531.9
260567
489.88
... More
(iii) Stone Chips
412.21
474717
1151.64
... More
(iv) Stone Boulder
874.04
699406
800.2
... More
(v) M.S.Rod
0.85
472
555.9
... More
(vi) NP2 Hume Pipe 300 mm Dia
5
489
97.97
... More
Add GST @18%
7544581.49
1358024
1
... More
Labour Cess 1%
8902606.16
89026
1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements