Water Resources Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Water Resources Department - WRD Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date8 Aug 2024
Closing Date14 Aug 2024
Tender Amount₹ 11,84,568 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Extra for earth work for each subsequent lift of 1M over the initial lift of 1.5M.(7.1.34) 1 nos. of lift

139.15

1846

13.27

... More
Earthwork in filling in canal banks (canal discharge upto 28 cumecs) as well as special repair of canal banks in ordinary soil - do - with initial lead of 15M. and lift of 1.5M -do- -do- as per specification and direction of E/I.(7.1.17)

136.1

16415

120.61

... More
Providing compacted 75mm thick sand filter of required F.M. as per design on side slopes and in bed of canal with coarse sand, including cost of water, ramming, levelling and dressing etc. all complete as per specification and direction of E/I.(7.2.1 A)

453.66

65463

144.3

... More
Providing 50 mm thick P.C.C. M- 100 with nominal mix of (1:3:6) with well graded stone chips (20mm and down) and coarse sand of approved quality of required F.M. (2.5 to 3.0) in side and bottom curved portion of the canal in panel with construction joint including cost of form work and its removal, curing, royalty and all other taxes, complete job as per specification and direction of E/I B.C.D 5.3.1.5

22.68

91343

4027.14

... More
Providing and laying P.C.C. or R.C.C Lining M-150 . with nominal mix of (1:2:4) - do - with approved quality of 20mm. graded coarse aggregate -- do---complete job as per specification and direction of E/I.(7.2.19.1)

45.36

376014

8289.57

... More
Providing M.S. reinforcement (plain) as per approved design.drawing, removal of rust, cutting, bending,binding, including supplying annealed wire, placing M.S. rods in position all complete job as per specification and direction of E/I.

3.91

343225

87893.8

... More
Providing dewatering from canal bed during work do- do- all complete job as per E/I

1

16200

16200

... More
Providing Diesel Genertor 1 KV at work site 2. 5 days

1

400

400

... More
Labour for filling empty Cement bags with local Sand stitching the bags –do--- do—E/I (7.7.40 )

4.68

8985

1919.95

... More
Supply of local sand screened at source –do-E/I (M001 PAGE 34 PART A)

13.25

2486

187.57

... More
Supply of empty cement bags (M-159) old

468

1038

2.22

... More
Carriage of materials (A) Cement

20.21

9381

464.2

... More
(B) Sand

65.1

16177

248.5

... More
(C) Chips

62.15

22666

364.7

... More
(D) Steel

3.91

1812

464.2

... More
Add GST@18%

1

178907

178907.85

... More
Add Labour Cess@1%

1

11728

11728.41



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.