Water Resources Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Water Resources Department - WRD Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date27 Oct 2022
Closing Date4 Nov 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Extra for wet earth all complete as per specification and direction of E/I. (Vide Item No. - 7.1.22 of WRD Part-B, Pg No.- 135)

143.23

-

13.27

... More
Providing and laying P.C.C or R.C.C. M150 with nominal mix of (1:2:4) in various components of dam foundation with approved quality of 20mm graded coarse aggregate of required grade as per design and approved quality of sand of requisite F.M (2.5 to 3.0) washed and screened excluding cost of shuttering or form-work as well of reinforcement ,its cutting,bending, binding and placing including necessary tools and plants and vibrating,curing,royalty all taxes etc. complete job as per specifications and direction of E/I. (Vide Item No - 5.3.6 of WRD Part-B, Pg. No.-109) / Item No.- 5.3.1.2 of BCD Part-B, Pg No. - 106)

263.69

-

4598.23

... More
Providing rough dressed random rubble stone masonry in cement mortar (1:4) in foundation with approved quality of coarse sand of requisite F.M (2.5 to 3) washed and screened with raking out joints curing, scaffolding and its removal wherever required including royalty and all taxes etc. complete job as per specifications and direction of E/I. (Vide Item No. - 5.4.8 of WRD Part- B, Pg-111) / Vide Item No. - 5.2.28 of Common Part-A, Pg No.-204).

282.92

-

2739.68

... More
Providing rough dressed random rubble stone masonry in cement mortar (1:4) in superstructure with approved quality of coarse sand of requisite F.M (2.5 to 3) washed and screened with raking out joints curing, scaffolding and its removal wherever required including royalty and all taxes etc. complete job as per specifications and direction of E/I. (Vide Item No. - 5.4.11 of WRD Part-B, Pg No.- 111) / (Vide Item No.- 5.2.31 of Common, Part - A, Pg No.-204)

416.95

-

2906.96

... More
Providing and laying P.C.C or R.C.C. M200 with nominal mix of (1:1.5:3) in various components of dam superstructure with approved quality of 20 mm graded coarse aggregate of required grade as per design and approved quality of sand of requisite F.M (2.5 to 3.0) washed and screened excluding cost of shuttering or form-work as well of reinforcement ,its cutting,bending, binding and placing including necessary tools and plants and vibrating,curing,royalty all taxes etc. complete job as per specifications and direction of E/I. (Vide Item No - 5.3.11 of WRD Part-B, Pg. No.- 109) / (Vide Item No.- 5.3.9.1 of BCD Part-B, Pg No. - 107)

10.67

-

5218

... More
Providing M.S.reinforcement (tor steel) as per approved design, drawing, removal of rust, cutting, bending, binding including supplying annealed wire, placing M.S rods in position all complete as per specification and direction of E/I. (Vide Item No. - 5.3.15(i) of WRD, Part-B, Pg. No.-110) / (Vide Item No.- 5.5.4 of BCD Part-B, Pg No.-119)

0.46

-

83314.02

... More
Providing Shuttering, including strutting, proping etc. and its removal after use in foundation work as per specification and direction of E/I. (Vide Item No. - 5.3.17 of WRD, Part-B, Pg No.-110)

231.56

-

418.03

... More
Supplying laying boulder in rock toe, heel trenches of the dam as per design, drawing including the cost of materials, royalty and all taxes etc. but excluding the cost of carriage all complete as per specification and direcition of E/I. (Vide Item No. - 5.6.4 of WRD Part- B, Pg No.-114)/(Common Part-A. Pg No.-209)

34.36

-

1491.06

... More
Providing weep hole with dry graded stone filter of 20 mm to 40 mm size in abutment and wing wall as per specification and direction of E/l. (Vide Item No. - 6.7.6 of WRD Part-B, Pg No.- 131)/(Common Part-A, Pg No.-209)

40

-

166.46

... More
Providing 25 mm thick cement plaster (1:4) with approved quality of sand of requisite F.M.(2,5 to 3.0) washed and screened Including curing, scaffolding wherever required and its removal royalty and all taxes etc. complete job as per specification and direcition of E/l (Vide Item No. - 5.5.5 of WRD Part-B, Pg No.- 113)/(9.7.12 Common Part-A, Pg No.-200)

393.84

-

258.87

... More
Earth work in filling foundation trenches or back filling of masonry structures with suitable earth in layers not exceeding 150mm thick well watered, rammed and fully compacted and finally dressed with earth obtained from excavation of foundation trenches and kept at a lead of 30m and initial lift 1.5m complete as per specification and direction of E/l. (Vide Item No. - 6.1.16 of WRD Part-B, Pg No.-120)

217.79

-

114.5

... More
Dewatering by 10 HP diesel pump all complete job. (PART- B (WRD) PM-29, Pg - 83, Sl No. - 10)

60

-

344.85

... More
Carriage of materials

-

-

-

... More
(i) Cement – Lead 18 KM(S) + 2 KM(k)

198.84

-

619.6

... More
(ii) Sand – Lead 13 KM(S) + 2 KM(k)

414.56

-

376.6

... More
(iii) Stone Chips – Lead 35 KM(S) + 2 KM(k)

246.47

-

703.96

... More
(iv) Boulder – Lead 33 KM(S) + 2 KM(k)

734.23

-

698.67

... More
(iv) Steel – Lead 18 KM(S) + 2 KM(k)

0.46

-

619.6

... More
After adding GST @18% on total estimated value the total estimated amount is

5057059.85

-

0.12

... More
Labour Cess @1% on above total estimated amount

5967330.63

-

0.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.