Water Resources Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Water Resources Department - WRD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date25 Sep 2024
Closing Date30 Sep 2024
Tender Amount₹ 38,09,935.38 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
E/W in excavation in canal by the hydraulic excavator as per designed section in all kinds of soil, soil mixed with kankar, pebbles and boulders upto 300 mm size and disposal of spoil upto 500 m with all lifts by tipper including construction and maintenance of haul road all complete as per specification and direction of E/I. SOR 7.1.43.2

16860

1771817

105.09

... More
E/W in excavation of foundation trenches in ordinary soil ( vide classification of soil item A ) and disposal of excavated earth so obtained to a distance of 50 m and average lift of 1.50M including levelling, ramming the foundation trenches removing the roots or shrubs etc. allcomplete job as per specification and direction of E/I (WRD S.O.R Item 7.1.27)

793.67

120026

151.23

... More
Providing and laying in position cement concrete( P.C.C M100) of nominal mix of 1:3:6 (1 cement : 3 coarse sand: (zone-III ) : 6 graded stone aggregate 40 MM nominal size) exluding the cost of centering and shuttering -all work upto plinth level.(BCD SOR 5.3.1.5)

38.97

156937

4027.14

... More
Providing and laying in position cement concrete( P.C.C M150) of nominal mix of 1:2:4 (1 cement:2 coarse sand: (zone-III ) :4 graded stone aggregate 20 MM nominal size) exluding the cost of shuttering -all work upto plinth level.(BCD SOR 5.3.1.2)

49.74

228715

4598.23

... More
Providing and laying in position cement concrete( P.C.C M150) of nominal mix of 1:2:4 (1 cement:2 coarse sand: (zone-III ) :4 graded stone aggregate 20 MM nominal size) in retaing walls, return walls ( any thickness) including attached pilasters, columns, piers, coping etc exluding the cost of centering and shuttering upto floor five level ( BCD SOR 5.3.2.2)

2.56

14403

5626.21

... More
Providing rough dressed random rubble stone masonry in C.M(1:4) in foundation and plinth with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M 2 TO 2.5 including cost of screening , racking out joints to 20 mm depth ,curing, taxes and royalty all complete job as per building specification and direction of E/I (Item No.5.2.28){SOR Part A Ch- 4 Sl.N- 4.28}

66.13

181175

2739.68

... More
Providing rough dressed random rubble stone masonry in C.M(1:4) in Superstructure with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M 2 TO 2.5 including cost of screening , racking out joints to 20 mm depth ,curing, taxes and royalty all complete job as per building specification and direction of E/I (Item No.5.2.31){SOR Part A Ch- 4 Sl.N- 4.31}

55.17

160376

2906.96

... More
Providing coarse clean local sand in filling in foundation trenches including ramming, watering, royalty and all other taxes complete job as per specification and direction of E/I((WRD S.O.R Corrg. Item 7.1.37)

5.49

3208

584.42

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) (BCD SOR 5.3.9.1)

5.56

29012

5218

... More
Providing Tor steel reinforcement of 8mm dia rods as per approved design and drawing -do-(TMT coil Fe 500) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL)} (BCD SOR 5.5.4)

0.39

32742

83314.02

... More
Providing 25 mm thick cement plaster (1:4)with clean coarse sand of F.M. 1.5 including screening, curing with all lead and lifts of water ,scaffolding taxes and royalty all complete job as per building specification and direction of E/I.( BCD Item No. 5.7.12)(Refer part A ch-3 item Sl.N-3.12)

92.36

23909

258.87

... More
Providing shuttering, including strutting, proping etc. and its removal after use in foundation work as per specification and direction of E/I. (BCD 5.3.17.1)

106.03

20622

194.5

... More
Providing shuttering, including strutting, proping etc. and its removal after use in super structure portion of various components of dam work as per specification and direction of E/I. (BCD 5.3.17.5)

35.64

12971

363.97

... More
Earthwork in filling foundation trenches or back filling of masonary structures with suitable earth in layers not exceeding 150mm thick well watered, rammed and fully compacted and finally dressed with earth obtained from excavation of foundation trenches and kept at a lead of 30 M and initial lift of 1.5M complete as per specification and direction of E/I. WRD SOR (6.1.16)

261.55

29947

114.5

... More
Supplying and laying boulders in rock toe, heel trenches of the dam as per design, drawing including the cost of materials and royalty etc. but excluding the cost of carriage all complete as per specification and direction of E/I. (ITEM NO 5.6.4)(SOR Part A Ch- 6 Sl.N 6.4)

74.93

111725

1491.06

... More
Use Rate of diesel pump per 10 H.P. per hour for dewatering during the construction of weir as per specification and direction of E/I. (S.O.R. Ch 1 Sl.N-47 )

150

49500

330

... More
Carriage of materials Cement

47.38

24069

508

... More
Sand

100.86

33481

331.96

... More
Stone Chips

51.84

18751

361.72

... More
Stone Boulder

131.43

48958

372.51

... More
Stone Metal

36.63

14040

383.31

... More
MS Rods

0.39

199

508

... More
Provision of GST @ 18%

1

575422

575422.36

... More
Add 1% Labour Cess

1

37722

37722.13



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.